832 resultados para process management


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Our work is focused on alleviating the workload for designers of adaptive courses on the complexity task of authoring adaptive learning designs adjusted to specific user characteristics and the user context. We propose an adaptation platform that consists in a set of intelligent agents where each agent carries out an independent adaptation task. The agents apply machine learning techniques to support the user modelling for the adaptation process

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Esta tesis, pretende describir la situación actual del Sector Porcícola, los procedimientos desarrollados por las empresas en la adopción, implantación y uso de estrategias CRM. Con una revisión confiable y el estudio de casos relacionados con el tema permitirán contrastar la realidad del sector con los conceptos claves que proponen los diferentes autores. Los resultados obtenidos le permitirán al sector y a los gerentes desarrollar estrategias que ayuden a la satisfacción y fidelización de sus clientes. En el campo académico, este estudio servirá de guía teórico-práctica para estudiantes y profesores del área que necesiten afianzar sus conocimientos en temas de marketing relacional, CRM, fidelización y servicio. El presente proyecto permitirá al futuro administrador enfrentar y asumir paradigmas en escenarios empresariales reales. La información estratégica acerca de los clientes es vital para las organizaciones, ayuda para la toma de decisiones, pronostica cambios en la demanda y establece un control sobre todos los procesos en los que está involucrado el cliente. La adopción, implantación y uso de estrategias CRM ayuda a que la empresa esté más atenta a la manera como interactúa con sus clientes y por ende, mejorará la percepción que tenga el cliente de la organización. En el sector Porcícola hay tendencia a las economías de escala y es importante segmentar y especializar el servicio dependiendo el potencial del cliente. En un mercado tan competitivo encontrar nuevos clientes no es fácil, y menos retenerlos ya que los productos están logrando estándares similares y el cliente basa su decisión en el precio. Al no haber diferenciación debemos ofrecer valor en el servicio lo cual nos ayudará a que el cliente haga una segunda compra prefiriendo nuestra empresa en lugar de la competencia. Hoy en día las estrategias CRM definen el rumbo de una empresa, ayudando no solamente a adquirir nuevos clientes, sino también, a mantener felices a los clientes actuales, de este modo se logran más ventas, y una mayor rentabilidad en el negocio. Razones por las cuales el sector Porcícola se verá beneficiado y Frigocárnicos Monserrate por medio de las estrategias CRM podrá ofrecer un mejor servicio a sus clientes ayudando a las fidelización de estos.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This is a research paper. Research presented in this paper aimed to investigate how to measure collaborative design performance and, in turn, improve the final design output during a design process, with a clear objective to develop a Design Performance Measurement (DPM) matrix to measure design project team member's design collaboration performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Speaker: Dr Kieron O'Hara Organiser: Time: 04/02/2015 11:00-11:45 Location: B32/3077 Abstract In order to reap the potential societal benefits of big and broad data, it is essential to share and link personal data. However, privacy and data protection considerations mean that, to be shared, personal data must be anonymised, so that the data subject cannot be identified from the data. Anonymisation is therefore a vital tool for data sharing, but deanonymisation, or reidentification, is always possible given sufficient auxiliary information (and as the amount of data grows, both in terms of creation, and in terms of availability in the public domain, the probability of finding such auxiliary information grows). This creates issues for the management of anonymisation, which are exacerbated not only by uncertainties about the future, but also by misunderstandings about the process(es) of anonymisation. This talk discusses these issues in relation to privacy, risk management and security, reports on recent theoretical tools created by the UKAN network of statistics professionals (on which the author is one of the leads), and asks how long anonymisation can remain a useful tool, and what might replace it.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

From the example of the process of general induction into the organization and using certain sociological resources, shows paradox are specialists in human management: is to carefor the motivation and the welfare of workers to achieve its high performance, their fidelity and his tenure at the company; However, current mutations of the social architecture in general and of work in particular –as structure of organized action– force thinking that organizational loyalty tends to be increasingly unlikely and that, conversely, the current personnel administration processes appear made inappropriate notions and appear to contribute directly to the adversities of human beings in organizational settings.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Municipal solid waste issue has acquired a growing importance into urban management discussions, particularly in metropolitan areas. Although metropolitan regions were created for integrating public functions of common interest, it appears that the structures, in general, are limited to planning  activities. In this context, the democratization process occurred in Brazil during 1980’s led to the  strengthening of inter-municipal arrangements of voluntary cooperation, acquiring great expressiveness  in metropolitan areas, responsible for 60% of waste generated in Brazil. However, despite the  consortia emergence as an alternative management of metropolitan territory, its process of setting up and operation is not free of challenges and dilemmas. This paper starts with the hypothesis that  inter-municipal consortia in metropolitan areas have high strength asymmetry and weak regional  identity among municipalities, conditions that tend to create barriers to its concretization. In this  context, this research aim  to develop a comparative study of inter-municipal arrangements for solid  waste management in the metropolitan areas of Curitiba (pr), Belo Horizonte (bh) and Salvador  (ba), by identifying influence degree of regional identity and strength asymmetry in these arrangements. The multiple case study reveals an inverse proportionality relationship between regional  identity and strength asymmetry among the municipalities, deeply influenced by political interinstitutional  arrangement and the metropolitan area in which they are is inserted.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Con la creciente popularidad de las soluciones de IT como factor clave para aumentar la competitividad y la creación de valor para las empresas, la necesidad de invertir en proyectos de IT se incrementa considerablemente. La limitación de los recursos como un obstáculo para invertir ha obligado a las empresas a buscar metodologías para seleccionar y priorizar proyectos, asegurándose de que las decisiones que se toman son aquellas que van alineadas con las estrategias corporativas para asegurar la creación de valor y la maximización de los beneficios. Esta tesis proporciona los fundamentos para la implementación del Portafolio de dirección de Proyectos de IT (IT PPM) como una metodología eficaz para la gestión de proyectos basados en IT, y una herramienta para proporcionar criterios claros para los directores ejecutivos para la toma de decisiones. El documento proporciona la información acerca de cómo implementar el IT PPM en siete pasos, el análisis de los procesos y las funciones necesarias para su ejecución exitosa. Además, proporciona diferentes métodos y criterios para la selección y priorización de proyectos. Después de la parte teórica donde se describe el IT PPM, la tesis aporta un análisis del estudio de caso de una empresa farmacéutica. La empresa ya cuenta con un departamento de gestión de proyectos, pero se encontró la necesidad de implementar el IT PPM debido a su amplia cobertura de procesos End-to-End en Proyectos de IT, y la manera de asegurar la maximización de los beneficios. Con la investigación teórica y el análisis del estudio de caso, la tesis concluye con una definición práctica de un modelo aproximado IT PPM como una recomendación para su implementación en el Departamento de Gestión de Proyectos.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This dissertation has as its goal the quantitative evaluation of the application of coupled hydrodynamic, ecological and clarity models, to address the deterministic prediction of water clarity in lakes and reservoirs. Prediction of water clarity is somewhat unique, insofar as it represents the integrated and coupled effects of a broad range of individual water quality components. These include the biological components such as phytoplankton, together with the associated cycles of nutrients that are needed to sustain their popuiations, and abiotic components such as suspended particles that may be introduced by streams, atmospheric deposition or sediment resuspension. Changes in clarity induced by either component will feed back on the phytoplankton dynamics, as incident light also affects biological growth. Thus ability to successfully model changes in clarity will by necessity have to achieve the correct modeling of these other water quality parameters. Water clarity is also unique in that it may be one of the earliest and most easily detected wamings of the acceleration of the process of eutrophication in a water body.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Despite the many models developed for phosphorus concentration prediction at differing spatial and temporal scales, there has been little effort to quantify uncertainty in their predictions. Model prediction uncertainty quantification is desirable, for informed decision-making in river-systems management. An uncertainty analysis of the process-based model, integrated catchment model of phosphorus (INCA-P), within the generalised likelihood uncertainty estimation (GLUE) framework is presented. The framework is applied to the Lugg catchment (1,077 km2), a River Wye tributary, on the England–Wales border. Daily discharge and monthly phosphorus (total reactive and total), for a limited number of reaches, are used to initially assess uncertainty and sensitivity of 44 model parameters, identified as being most important for discharge and phosphorus predictions. This study demonstrates that parameter homogeneity assumptions (spatial heterogeneity is treated as land use type fractional areas) can achieve higher model fits, than a previous expertly calibrated parameter set. The model is capable of reproducing the hydrology, but a threshold Nash-Sutcliffe co-efficient of determination (E or R 2) of 0.3 is not achieved when simulating observed total phosphorus (TP) data in the upland reaches or total reactive phosphorus (TRP) in any reach. Despite this, the model reproduces the general dynamics of TP and TRP, in point source dominated lower reaches. This paper discusses why this application of INCA-P fails to find any parameter sets, which simultaneously describe all observed data acceptably. The discussion focuses on uncertainty of readily available input data, and whether such process-based models should be used when there isn’t sufficient data to support the many parameters.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The technique of linear responsibility analysis is used for a retrospective case study of a private industrial development consisting of an extension to existing buildings to provide a warehouse, services block and packing line. The organizational structure adopted on the project is analysed using concepts from systems theory which are included in Walker's theoretical model of the structure of building project organizations (Walker, 1981). This model proposes that the process of building provision can be viewed as systems and subsystems which are differentiated from each other at decision points. Further to this, the subsystems can be viewed as the interaction of managing system and operating system. Using Walker's model, a systematic analysis of the relationships between the contributors gives a quantitative assessment of the efficacy of the organizational structure used. The causes of the client's dissatisfaction with the outcome of the project were lack of integration and complexity of the managing system. However, there was a high level of satisfaction with the completed project and this is reflected by the way in which the organization structure corresponded to the model's propositions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The PhD process is uncertain, idiosyncratic and vague. Research into the management of PhDs has proved very useful for supervisors and students. It is important for everyone involved in the process to be aware of what can be done to improve the likelihood of success for PhD studies. There are many ways of tackling a PhD and it is not possible to describe construction management as a generic type of study. Rather, construction management is a source of problems and data, whereas solutions and approaches need to be based within established academic disciplines. The clear definition of a research project is an essential prerequisite for success. Although PhDs are difficult, there are many things that can be done by departments, supervisors and students to ease the difficulties. In the long run, the development of an active and dynamic research community is dependent upon a steady flow of high quality PhDs. No-one benefits from an uncompleted or failed PhD.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to focus on the intellectual property (IP) aspects of mergers and acquisitions (M&A) transactions. Design/methodology/approach – A holistic approach is proposed that embraces IP as an integral part of the M&A process in the form of a roadmap for the strategic and purposeful management of IP assets in M&A deals. Findings – Addressing IP issues in transactions in isolation can lead to undesirable consequences (e.g. considerable costs for unplanned purchases of rights). IP due diligence and IP integration project processes can be automated using collaborative software solutions. Thereby, risk can be reduced through the creation of a high level of transparency and predefined responsibilities. Practical implications – Although the proposed IP management framework is based on intellectual property matters relevant to German jurisdiction, conclusions derived and the proposed roadmap are transferable to other jurisdictions and hence have a broader relevance. Evidence for this is provided by the successful application of the roadmap in the context of the multinational transaction stated above. Originality/value – This paper is based on the authors' collective experience, insight and reflected observation of M&A practice gained in advisory M&A roles in management consultancies over a period of more than a decade. The paper summarizes the authors' reflections and observations and brings these into the context of the current management literature. Moreover, this paper builds on earlier published research.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper describes a case study of an electronic data management system developed in-house by the Facilities Management Directorate (FMD) of an educational institution in the UK. The FMD Maintenance and Business Services department is responsible for the maintenance of the built-estate owned by the university. The department needs to have a clear definition of the type of work undertaken and the administration that enables any maintenance work to be carried out. These include the management of resources, budget, cash flow and workflow of reactive, preventative and planned maintenance of the campus. In order to be more efficient in supporting the business process, the FMD had decided to move from a paper-based information system to an electronic system, WREN, to support the business process of the FMD. Some of the main advantages of WREN are that it is tailor-made to fit the purpose of the users; it is cost effective when it comes to modifications on the system; and the database can also be used as a knowledge management tool. There is a trade-off; as WREN is tailored to the specific requirements of the FMD, it may not be easy to implement within a different institution without extensive modifications. However, WREN is successful in not only allowing the FMD to carry out the tasks of maintaining and looking after the built-estate of the university, but also has achieved its aim to minimise costs and maximise efficiency.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Planning is a vital element of project management but it is still not recognized as a process variable. Its objective should be to outperform the initially defined processes, and foresee and overcome possible undesirable events. Detailed task-level master planning is unrealistic since one cannot accurately predict all the requirements and obstacles before work has even started. The process planning methodology (PPM) has thus been developed in order to overcome common problems of the overwhelming project complexity. The essential elements of the PPM are the process planning group (PPG), including a control team that dynamically links the production/site and management, and the planning algorithm embodied within two continuous-improvement loops. The methodology was tested on a factory project in Slovenia and in four successive projects of a similar nature. In addition to a number of improvement ideas and enhanced communication, the applied PPM resulted in 32% higher total productivity, 6% total savings and created a synergistic project environment.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Smooth flow of production in construction is hampered by disparity between individual trade teams' goals and the goals of stable production flow for the project as a whole. This is exacerbated by the difficulty of visualizing the flow of work in a construction project. While the addresses some of the issues in Building information modeling provides a powerful platform for visualizing work flow in control systems that also enable pull flow and deeper collaboration between teams on and off site. The requirements for implementation of a BIM-enabled pull flow construction management software system based on the Last Planner System™, called ‘KanBIM’, have been specified, and a set of functional mock-ups of the proposed system has been implemented and evaluated in a series of three focus group workshops. The requirements cover the areas of maintenance of work flow stability, enabling negotiation and commitment between teams, lean production planning with sophisticated pull flow control, and effective communication and visualization of flow. The evaluation results show that the system holds the potential to improve work flow and reduce waste by providing both process and product visualization at the work face.