828 resultados para joint projects
Resumo:
In this paper an attempt has been made to take a look at. how the use of implant and electrode technology can now be employed to create biological brains for robots, to enable human enhancement and to diminish the effects of certain neural illnesses. In all cases the end result is to increase the range of abilities of the recipients. An indication is given of a number of areas in which such technology has already had a profound effect, a key element being the need for a clear interface linking the human brain directly with a computer. An overview of some of the latest developments in the field of Brain to Computer Interfacing is also given in order to assess advantages and disadvantages. The emphasis is clearly placed on practical studies that have been and are being undertaken and reported on, as opposed to those speculated, simulated or proposed as future projects. Related areas are discussed briefly only in the context of their contribution to the studies being undertaken. The area of focus is notably the use of invasive implant technology, where a connection is made directly with the cerebral cortex and/or nervous system. Tests and experimentation which do not involve human subjects are invariably carried out a priori to indicate the eventual possibilities before human subjects are themselves involved. Some of the more pertinent animal studies from this area are discussed including our own involving neural growth. The paper goes on to describe human experimentation, in which neural implants have linked the human nervous system bi-directionally with technology and the internet. A view is taken as to the prospects for the future for this implantable computing in terms of both therapy and enhancement.
OFDM joint data detection and phase noise cancellation based on minimum mean square prediction error
Resumo:
This paper proposes a new iterative algorithm for orthogonal frequency division multiplexing (OFDM) joint data detection and phase noise (PHN) cancellation based on minimum mean square prediction error. We particularly highlight the relatively less studied problem of "overfitting" such that the iterative approach may converge to a trivial solution. Specifically, we apply a hard-decision procedure at every iterative step to overcome the overfitting. Moreover, compared with existing algorithms, a more accurate Pade approximation is used to represent the PHN, and finally a more robust and compact fast process based on Givens rotation is proposed to reduce the complexity to a practical level. Numerical Simulations are also given to verify the proposed algorithm. (C) 2008 Elsevier B.V. All rights reserved.
Resumo:
This correspondence proposes a new algorithm for the OFDM joint data detection and phase noise (PHN) cancellation for constant modulus modulations. We highlight that it is important to address the overfitting problem since this is a major detrimental factor impairing the joint detection process. In order to attack the overfitting problem we propose an iterative approach based on minimum mean square prediction error (MMSPE) subject to the constraint that the estimated data symbols have constant power. The proposed constrained MMSPE algorithm (C-MMSPE) significantly improves the performance of existing approaches with little extra complexity being imposed. Simulation results are also given to verify the proposed algorithm.
Resumo:
This paper provides some preliminary insights into the emergence and development of indigenous general contractors in Ghana. General contracting is the means by which an individual or organisation takes responsibility for supplying all of the materials, labour, equipment and services necessary for the construction of a project. Whereas the development of general contracting in places like the UK is well documented, the evolution of contractors in Ghana is not clearly articulated in the literature. Therefore, the main question in this paper is: How did indigenous contractors evolve in Ghana? To examine and analyze the research question, a literature review on similar developments elsewhere was first carried out. This was followed by discussions and unstructured interviews with experienced construction practitioners in Ghana most of whom were Quantity Surveyors. Most interviewees narrated their knowledge of contractor development in Ghana dating back to around 1945. From the explanations given, it was possible to develop a general understanding of the research question and to make a qualitative interpretation of the respondents’ comments and to draw some conclusions. General contractors emerged rapidly in the Gold Coast (now Ghana) shortly after World War II. Most were Italian master craftsmen in Ghana who were capitalized by the British colonial government to develop infrastructure in the Gold Coast following devastating effects of the war. Some of the indigenous people learned from the Italians and also established construction firms. Thus, general contracting in Ghana has a relatively short history in comparison to countries like Britain where the profession developed rapidly in the early part of the 19th century in response to the industrial revolution. Although they may possess sufficient technical expertise, many indigenous contractors in Ghana today lack the capacity to carry out major projects because of low capitalization and poor organisational structures. The current construction market in Ghana is dominated by foreign contractors. To become major players in the market, indigenous Ghanaian contractors should build strong organisational structures and pursue mergers and joint venturing to boost their financial, technical and managerial capacity.
Resumo:
Little attention has been focussed on a precise definition and evaluation mechanism for project management risk specifically related to contractors. When bidding, contractors traditionally price risks using unsystematic approaches. The high business failure rate our industry records may indicate that the current unsystematic mechanisms contractors use for building up contingencies may be inadequate. The reluctance of some contractors to include a price for risk in their tenders when bidding for work competitively may also not be a useful approach. Here, instead, we first define the meaning of contractor contingency, and then we develop a facile quantitative technique that contractors can use to estimate a price for project risk. This model will help contractors analyse their exposure to project risks; and help them express the risk in monetary terms for management action. When bidding for work, they can decide how to allocate contingencies strategically in a way that balances risk and reward.
Resumo:
As integrated software solutions reshape project delivery, they alter the bases for collaboration and competition across firms in complex industries. This paper synthesises and extends literatures on strategy in project-based industries and digitally-integrated work to understand how project-based firms interact with digital infrastructures for project delivery. Four identified strategies are to: 1) develop and use capabilities to shape the integrated software solutions that are used in projects; 2) co-specialize, developing complementary assets to work repeatedly with a particular integrator firm; 3) retain flexibility by developing and maintaining capabilities in multiple digital technologies and processes; and 4) manage interfaces, translating work into project formats for coordination while hiding proprietary data and capabilities in internal systems. The paper articulates the strategic importance of digital infrastructures for delivery as well as product architectures. It concludes by discussing managerial implications of the identified strategies and areas for further research.
Resumo:
The construction sector is under growing pressure to increase productivity and improve quality, most notably in reports by Latham (1994, Constructing the Team, HMSO, London) and Egan (1998, Rethinking Construction, HMSO, London). A major problem for construction companies is the lack of project predictability. One method of increasing predictability and delivering increased customer value is through the systematic management of construction processes. However, the industry has no methodological mechanism to assess process capability and prioritise process improvements. Standardized Process Improvement for Construction Enterprises (SPICE) is a research project that is attempting to develop a stepwise process improvement framework for the construction industry, utilizing experience from the software industry, and in particular the Capability Maturity Model (CMM), which has resulted in significant productivity improvements in the software industry. This paper introduces SPICE concepts and presents the results from two case studies conducted on design and build projects. These studies have provided further in-sight into the relevance and accuracy of the framework, as well as its value for the construction sector.