875 resultados para general information


Relevância:

30.00% 30.00%

Publicador:

Resumo:

West stack. Albert Kahn, architect. Selden Breck contractors built stacks 1916-1918. Construction of General Library Building authorized June 1916. Two stacks built at right angles to 1898 stacks, which were retained. In 1918 Old Library was demolished and front (north side) of General Library begun. Completed in 1920. Photograph mounted on linen. From construction photo album received by Buildings and Grounds

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Front (north) of General LIbrary. Albert Kahn, architect. Selden Breck contractors built stacks 1916-1918. Construction of General Library Building authorized June 1916. Two stacks built at right angles to 1898 stacks, which were retained. In 1918 Old Library was demolished and front (north side) of General Library begun. Completed in 1920.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Front (north) of General Library. Albert Kahn, architect. Selden Breck contractors built stacks 1916-1918. Construction of General Library Building authorized June 1916. Two stacks built at right angles to 1898 stacks, which were retained. In 1918 Old Library was demolished and front (north side) of General Library begun. Completed in 1920.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Albert Kahn, architect (also 1920 and 1970 additions). In 1918 the old library was demolished and a new front (north facade) was attached to the 1893 stacks and the stacks built in 1916-1917. This was referred to as the (New) General Library until the south stack addition was built in 1967-1970, when the entire library building was named the Harlan Hatcher Graduate Library.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Albert Kahn, architect (also for 1920 and 1970 additions). In 1918 the old library was demolished and a new front (north facade) was attached to the 1893 stacks and the stacks built in 1916-1917. This was referred to as the (New) General Library until the south stack addition was built in 1967-1970, when the entire library building was named the Harlan Hatcher Graduate Library.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Albert Kahn, architect. In 1918 the old library was demolished and a new front (north facade) was attached to the 1893 stacks and the stacks built in 1916-1917. This was referred to as the (New) General Library until the south stack addition was built in 1967-1970, when the entire library building was named the Harlan Hatcher Graduate Library. Stamp on verso: Michigan Historical Collections, The University of Michigan, Rackham Building, Ann Arbor, Mich. 48104

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Albert Kahn, architect. In 1918 the old library was demolished and a new front (north facade) was attached to the 1893 stacks and the stacks built in 1916-1917. This was referred to as the (New) General Library until the south stack addition was built in 1967-1970, when the entire library building was named the Harlan Hatcher Graduate Library.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Albert Kahn, architect. In 1918 the old library was demolished and a new front (north facade) was attached to the 1893 stacks and the stacks built in 1916-1917. This was referred to as the (New) General Library until the south stack addition was built in 1967-1970, when the entire library building was named the Harlan Hatcher Graduate Library. On verso: General Library 8/55

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Albert Kahn, architect. In 1918 the old library was demolished and a new front (north facade) was attached to the 1893 stacks and the stacks built in 1916-1917. This was referred to as the (New) General Library until the south stack addition was built in 1967-1970, when the entire library building was named the Harlan Hatcher Graduate Library.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Albert Kahn, architect. In 1918 the old library was demolished and a new front (north facade) was attached to the 1893 stacks and the stacks built in 1916-1917. This was referred to as the (New) General Library until the south stack addition was built in 1967-1970, when the entire library building was named the Harlan Hatcher Graduate Library. Photographer's stamp on verso: Francisco-Boyce Photo Co. Ann Arbor, Mich. Sparkletone Print.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Pencil and red ink on linen. Indicates location of buildings, ponds, gardens, vegetation, sewers, etc. Signed. 92 cm x 84 cm. Scale: 1" = 50'. Signed. [Marion College] [from photographic copy by Lance Burgharrdt]

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Ink on linen. Similar to Clu 3, but with several additions, notably bird pool, boat landing, additional plantings, and descriptive notes; amounts of plantings indicated. Signed. 97 cm. x 64 cm. Scale: 1"=20' [from photographic copy by Lance Burgharrdt]

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Blueprint with pencil notations. Roads, residence, some contour lines. Duncan Chandler, architect. Unsigned. 94 cm. x 83 cm. No scale [from photographic copy by Lance Burgharrdt]

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Blueprint with pencil annotations. Markings on portions of grounds. Duncan Chandler, architect. Unsigned. 77 cm. x 70 cm. Scale: 3/32"=1' [from photographic copy by Lance Burgharrdt]

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Ware and Van Brunt, architect. An addition was built to the south in 1898. The 1883 portion was torn down in 1918.