904 resultados para asset backed hire purchase financing
Resumo:
Ukraine is struggling with both external aggression and the dramatically poor shape of its economy. The pace of political and institutional change has so far been too slow to prevent the deepening of the fiscal and balance-of-payments crises, while business confidence continues to be undermined. • Unfortunately, the 2015 International Monetary Fund Extended Fund Facility programme repeats many weaknesses of the 2014 IMF Stand-by Arrangement: slow pace of fiscal adjustment especially in the two key areas of energy prices and pension entitlements, lack of a comprehensive structural and institutional reform vision, and insufficient external financing to close the expected balance-of-payments gap and allow Ukraine to return to debt sustainability in the long term. • The reform process in Ukraine must be accelerated and better managed. A frontloaded fiscal adjustment is necessary to stabilise public finances and the balance-of-payments, and to bring inflation down. The international community, especially the European Union, should offer sufficient financial aid backed by strong conditionality, technical assistance and support to Ukraine’s independence and territorial integrity.
Resumo:
The Federal Reserve left rates unchanged at its closely-watched meeting on September 17th, although many had argued that the real economy data, especially on the labour market, would have justified an exit (from the zero interest policy). In this CEPS Commentary, Daniel Gros observes that no similar decision on exit is in sight in the euro area, despite the fact that some have argued that the ECB should consider further easing measures (pushing the deposit rate deeper into negative territory or increasing the size of its asset purchase programme). He asks, in fact, whether further easing measures should be even discussed at this point.
Resumo:
The Single Resolution Board (SRB) will be responsible for the resolution of banks in the euro area from 1 January 2016. However, the resources of the Single Resolution Fund (SRF) at the disposal of the SRB will only gradually be built up until 2023. This paper provides estimates of the potential financing needs of the SRF, based on the euro area bank resolutions that actually occurred between 2007 and 2014. We find that the SRF would have been asked to put a total amount of about €72 billion into these failing banks, which is more than the target for the SRF (€55 billion) but less than the amount the SRF could draw on, if the ex-post levies are also taken into account. As this sum would have been required over eight years, the broad conclusion is that bridge financing, in addition to the existing alternative funding, would only have been needed in the early years of the transition.