907 resultados para Road construction workers Safety measures
Resumo:
To date there have been few investigations of the substructures in low-volume road (LVR) bridges. Steel sheet piling has the potential to provide an economical alternative to concrete bridge abutments, but it needs investigation with regard to vertical and lateral load resistance, construction methods, and performance monitoring. The objectives of this project were to develop a design approach for sheet pile bridge abutments for short-span low-volume bridges, formulate an instrumentation and monitoring plan to evaluate performance of sheet pile abutment systems, and understand the cost and construction effort associated with building the sheet pile bridge abutment demonstration project. Three demonstration projects (Boone, Blackhawk, and Tama Counties) were selected for the design, construction, and monitoring of sheet pile abutments bridges. Each site was unique and required site-specific design and instrumentation monitoring. The key findings from this study include the following: (1) sheet pile abutment bridges provide an effective solution for LVR bridges, (2) the measured stresses and deflection were different from the assumed where the differences reflect conservatism in the design and the complex field conditions, and (3) additional research is needed to optimize the design.
Resumo:
Iowa has about 22,936 bridges on low-volume roads (LVRs). Based on the National Bridge Inventory data, 22 percent of the LVR bridges in Iowa are structurally deficient, while 5 percent of them are functionally obsolete. The substructure components (abutment and foundation elements) are known to be contributing factors for some of these poor ratings. Steel sheet piling was identified as a possible long-term option for LVR bridge substructures; but, due to lack of experience, Iowa needed investigation with regard to vertical and lateral load resistance, construction methods, design methodology, and load test performance. This project was initiated in January 2007 to investigate use of sheet pile abutments. *************Tech Transfer Summary. For full report see: http://publications.iowa.gov/id/eprint/14832*************
Resumo:
Incentive/disincentive clauses (I/D) are designed to award payments to contractors if they complete work ahead of schedule and to deduct payments if they exceed the completion time. A previously unanswered question is, “Did the costs of the actual work zone impacts that were avoided justify the incentives paid?” This report answers that question affirmatively based on an evaluation of 20 I/D projects in Missouri from 2008 to 2011. Road user costs (RUC) were used to quantify work zone impacts and included travel delays, vehicle operating costs, and crash costs. These were computed using work zone traffic conditions for partial-closure projects and detour volumes and routes for full-closure projects. Conditions during construction were compared to after construction. Crash costs were computed using Highway Safety Manual methodology. Safety Performance Functions produced annual crash frequencies that were translated into crash cost savings. In considering an average project, the percentage of RUC savings was around 13% of the total contract amount, or $444,389 of $3,464,620. The net RUC savings produced was around $7.2 million after subtracting the approximately $1.7 million paid in incentives. In other words, for every dollar paid in incentives, approximately 5.3 dollars of RUC savings resulted. I/D provisions were very successful in saving RUC for projects with full-closure, projects in urban areas, and emergency projects. Rural, non-emergency projects successfully saved RUC but not at the same level as other projects. The I/D contracts were also compared to all Missouri Department of Transportation contracts for the same time period. The results show that I/D projects had a higher on-time completion percentage and a higher number of bids per call than average projects. But I/D projects resulted in 4.52% higher deviation from programmed costs and possibly more changes made after the award. A survey of state transportation departments and contractors showed that both agreed to the same issues that affect the success of I/D contracts. Legal analysis suggests that liquidated damages is preferred to disincentives, since enforceability of disincentives may be an issue. Overall, in terms of work zone impact mitigation, I/D contracts are very effective at a relatively low cost.
Resumo:
The Institute for Transportation (InTrans) at Iowa State University completed work on an in-depth study of crash history on lowvolume, rural roads in Iowa in December 2010. Results indicated that unpaved roads with traffic volumes greater than 100 vehicles per day (vpd) exhibit significantly higher crash frequencies, rates, and densities than any other class of low-volume road examined, paved or unpaved. The total mileage for this class of roadway in Iowa is only about 4,400 miles, spread over 99 counties in the state, which is certainly a manageable number of miles for individual rural agencies. The purpose of this study was to identify and examine several unpaved, local road segments with higher than average crash frequencies, select and undertake potentially-beneficial mitigation, and evaluate the results as time allowed. A variety of low-cost options were considered, including engineering improvements, enhanced efforts by law enforcement, and educational initiatives. Using input, active support, and participation from local agencies and state and Federal safety advocates, the study afforded a unique opportunity to examine useful tools for local rural agencies to utilize in addressing safety on this particular type of roadway.
Resumo:
The Institute for Transportation (InTrans) at Iowa State University completed work on an in-depth study of crash history on lowvolume, rural roads in Iowa in December 2010. Results indicated that unpaved roads with traffic volumes greater than 100 vehicles per day (vpd) exhibit significantly higher crash frequencies, rates, and densities than any other class of low-volume road examined, paved or unpaved. The total mileage for this class of roadway in Iowa is only about 4,400 miles, spread over 99 counties in the state, which is certainly a manageable number of miles for individual rural agencies. The purpose of this study was to identify and examine several unpaved, local road segments with higher than average crash frequencies, select and undertake potentially-beneficial mitigation, and evaluate the results as time allowed. A variety of low-cost options were considered, including engineering improvements, enhanced efforts by law enforcement, and educational initiatives. Using input, active support, and participation from local agencies and state and Federal safety advocates, the study afforded a unique opportunity to examine useful tools for local rural agencies to utilize in addressing safety on this particular type of roadway.
Resumo:
Senate File 2314, 84th General Assembly, states the Iowa Department of Transportation shall submit quarterly reports regarding the implementation of efficiency measures identified in the "Road Use Tax Fund Efficiency Report," January 2012. This report shall provide details of activities undertaken in the previous quarter relating to one-time and long-term program efficiencies and partnership efficiencies. Issues covered include savings realized from the implementation of particular efficiency measures; updates concerning measures that have not been implemented; efforts involving cities, counties, other jurisdictions, or stakeholder interest groups; any new efficiency measures identified or undertaken; and identification of any legislative action that may be required to achieve efficiencies.
Resumo:
Senate File 2314, 84th General Assembly, states the Iowa Department of Transportation shall submit quarterly reports regarding the implementation of efficiency measures identified in the "Road Use Tax Fund Efficiency Report," January 2012. This report shall provide details of activities undertaken in the previous quarter relating to one-time and long-term program efficiencies and partnership efficiencies. Issues covered include savings realized from the implementation of particular efficiency measures; updates concerning measures that have not been implemented; efforts involving cities, counties, other jurisdictions, or stakeholder interest groups; any new efficiency measures identified or undertaken; and identification of any legislative action that may be required to achieve efficiencies.
Resumo:
This is a story about a highway project near the small town of Wever, Iowa, and an American Indian village that existed at the location prior to the Europeans' arrival. The culture that lived in this village existed in a 10 state region of the Upper Midwest and may have been the ancestors of tribes living in the Midwest when European explorers entered the region. An archaeological recovery of information from the site was undertaken by the Iowa Department of Transportation because four-lane construction of U.S. 61 could not be accomplished without destroying most of the site. This site proved to be one of the richest archaeological finds in the State of Iowa. ǂc Iowa Department of Transportation.
Resumo:
Iowa Counties have been experiencing significant tort claim liability due to the signing of local roads. One such problem is relative to the real or alleged need for signing at uncontrolled intersections of local roads. It has been assumed that the standard CROSS ROAD sign, which calls for a yellow diamond with a black cross, was sufficient to provide the necessary warning that a driver may be approaching an intersection which requires special precautionary driving attention. However, it is possible that this sign on a through highway might conflict with the legal status of the local county road. In light of this situation, it seemed worthwhile to know the extent to which uncontrolled local road intersections were perceived as a potential liability problem; the degree to which the standard CROSS ROAD sign communicated to the driver the message a county engineer wanted at these local road intersections; and whether there were any better signing alternatives available to communicate this hazard to the driver in this situation.
Resumo:
Iowa's secondary road network contains nearly 15,000 bridges which are less than 12 m (40 ft) long. Many of these bridges were built several decades ago and need to be replaced. Box culvert construction has proven to be an adequate bridge replacement technique. An alternative to box culverts is the Air-O-Form method of arch culvert construction. The Air-O-Form method has several potential advantages over box culvert construction. The new technique uses inflated balloons as the interior form in the construction of an arch culvert. Concrete is then shotcreted onto the balloon form to complete the arch culvert. The objective of the research project was to construct an air formed arch culvert to determine its applicability as an alternative county bridge replacement technique. The project had the following results: (1) The Air-O-Form method can be used to construct a structurally sound arch culvert; and (2) The method must become more economical if it is to compete with box culverts.
Resumo:
Culverts are common means to convey flow through the roadway system for small streams. In general, larger flows and road embankment heights entail the use of multibarrel culverts (a.k.a. multi-box) culverts. Box culverts are generally designed to handle events with a 50-year return period, and therefore convey considerably lower flows much of the time. While there are no issues with conveying high flows, many multi-box culverts in Iowa pose a significant problem related to sedimentation. The highly erosive Iowa soils can easily lead to the situation that some of the barrels can silt-in early after their construction, becoming partially filled with sediment in few years. Silting can reduce considerably the capacity of the culvert to handle larger flow events. Phase I of this Iowa Highway Research Board project (TR-545) led to an innovative solution for preventing sedimentation. The solution was comprehensively investigated through laboratory experiments and numerical modeling aimed at screening design alternatives and testing their hydraulic and sediment conveyance performance. Following this study phase, the Technical Advisory Committee suggested to implement the recommended sediment mitigation design to a field site. The site selected for implementation was a 3-box culvert crossing Willow Creek on IA Hwy 1W in Iowa City. The culvert was constructed in 1981 and the first cleanup was needed in 2000. Phase II of the TR 545 entailed the monitoring of the site with and without the selfcleaning sedimentation structure in place (similarly with the study conducted in laboratory). The first monitoring stage (Sept 2010 to December 2012) was aimed at providing a baseline for the operation of the as-designed culvert. In order to support Phase II research, a cleanup of the IA Hwy 1W culvert was conducted in September 2011. Subsequently, a monitoring program was initiated to document the sedimentation produced by individual and multiple storms propagating through the culvert. The first two years of monitoring showed inception of the sedimentation in the first spring following the cleanup. Sedimentation continued to increase throughout the monitoring program following the depositional patterns observed in the laboratory tests and those documented in the pre-cleaning surveys. The second part of Phase II of the study was aimed at monitoring the constructed self-cleaning structure. Since its construction in December 2012, the culvert site was continuously monitored through systematic observations. The evidence garnered in this phase of the study demonstrates the good performance of the self-cleaning structure in mitigating the sediment deposition at culverts. Besides their beneficial role in sediment mitigation, the designed self-cleaning structures maintain a clean and clear area upstream the culvert, keep a healthy flow through the central barrel offering hydraulic and aquatic habitat similar with that in the undisturbed stream reaches upstream and downstream the culvert. It can be concluded that the proposed self-cleaning structural solution “streamlines” the area upstream the culvert in a way that secures the safety of the culvert structure at high flows while producing much less disturbance in the stream behavior compared with the current constructive approaches.
Resumo:
Iowa's public road system of 112,000 miles is one of the largest and the best in the nation. It represents a considerable financial investment of taxpayer revenues over the years. And, it requires a sustained investment to preserve an economical level of transport service into the future. In 1982, a Governor's Blue Ribbon Transportation Task Force evaluated the effectiveness of Iowa's entire transportation system. Four important Task Force recommendations dealt with public road administrative issues in Iowa. These issues were related to: (1) Design criteria and levels of maintenance; (2) Consistency in the use of standards among jurisdictions; (3) Consolidation of maintenance operations at one jurisdiction level; and (4) Jurisdicational authority for roads; The issues formed the background for Research Project HR-265.
Resumo:
A 5.8 mile section of Dubuque County (Iowa) Road D-53 was selected for this project, the objective of which were to: 1. identify a cost effective asphalt emulsion bound macadam typical cross section; 2. determine the effectiveness of engineering fabric placed under macadam roadbeds; and 3. evalaute the use of emulsions in surface seal coats. A number of conclusions were reached: 1. The minus #200 sieve material for the macadam stone should be held to a minimum. For the emulsion used on this project, the minus #200 material had less than 4 percent to achieve satisfactory coating of the macadam stone. 2. The placement of the emulsion treated macadam required no additional equipment or time than the plain macadam placement. 3. Emulsion treating the macadam stone for the shoulder base appears unnecessary. 4. The emulsion treated macadam base beneath an asphaltic concrete wearing surface yielded a higher structural rating than the plain macadam beneath a comparable ashaltic concrete surface. 5. The performance of the fabric between the subgrade and the macadam base to prevent soil intrusion into the base could not be determined by the non-destructive testing conducted. 6. When no choke stone is used over the macadam base, allowance for ac mix overrun should be made. 7. Use of an emulsion instead of a cutback asphalt saved money and energy. However, the poor performance of the seal coat negated any real savings.
Resumo:
The Iowa counties have been successful in maintaining a good roadway environment on our 90,000 mile secondary road system. However, county highway personnel must remain vigilant in detecting, discovering and correcting potential problems if our roads are to remain so. This presentation was developed for those county personnel who work and travel on secondary roads. The presentation discusses things county personnel can look for during their daily operations which could possibly create a potential problem. If these situations are uncovered and corrected in a timely manner, our secondary road system will be maintained in an appropriate manner.
Resumo:
Senate File 2314, 84th General Assembly, states the Iowa Department of Transportation shall submit quarterly reports regarding the implementation of efficiency measures identified in the "Road Use Tax Fund Efficiency Report," January 2012. This report shall provide details of activities undertaken in the previous quarter relating to one-time and long-term program efficiencies and partnership efficiencies. Issues covered include savings realized from the implementation of particular efficiency measures; updates concerning measures that have not been implemented; efforts involving cities, counties, other jurisdiction, or stakeholder interest groups; any new efficiency measures identified or undertaken; and identification of any legislative action that may be required to achieve efficiencies.