980 resultados para Road construction


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Railway level crossings present an arguably unique interface between two transport systems that differ markedly in their performance characteristics, their degrees of regulation and their safety cultures. Railway level crossings also differ dramatically in the importance they represent as safety issues for the two modes. For rail, they are the location of a large proportion of fatalities within the system and are therefore the focus of much safety concern. For the road system, they comprise only a few percent of all fatalities, although the potential for catastrophic outcomes exist. Rail operators and regulators have traditionally required technologies to be failsafe and to demonstrate high levels of reliability. The resultant level of complexity and cost has both limited their extent of application and led to a need to better understand how motorists comprehend and respond to these systems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Numerous different and sometimes discrepant interests can be affected, both positively and negatively, throughout the course of a major infrastructure and construction (MIC) project. Failing to address and meet the concerns and expectations of the stakeholders involved has resulted in many project failures. One way to address this issue is through a participatory approach to project decision making. Whether the participation mechanism is effective or not depends largely on the client/owner. This paper provides a means of systematically evaluating the effectiveness of the public participation exercise, or even the whole project, through the measurement of stakeholder satisfaction. Since the process of satisfaction measurement is complicated and uncertain, requiring approximate reasoning involving human intuition, a fuzzy approach is adopted. From this, a multi-factor hierarchical fuzzy comprehensive evaluation model is established to facilitate the evaluation of satisfaction in both single stakeholder group and overall MIC project stakeholders.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The addition of lime into soils has been widely used to stabilize the expansive sub-grade soils when the road pavements are constructed on them. It is common practice to apply a half of the required lime amount and allow a certain time period for lime to react with soils (Amelioration period) before applying the rest of lime and compacting the sub-grade. The optimum amelioration period is essential to minimize the construction delay and to gain the higher strength. In this study, two different expansive soils procured from two different locations in the state of Queensland in Australia were first mixed with different lime contents. A soil mixed with a particular lime content was compacted at different amelioration periods (e.g.: 0, 6, 12, 18, 24 hrs) to obtain soil samples to measure the Unconfined Compressive Strength (UCS). The results suggested that for a given amelioration period, UCS increased with the increase in lime content. The optimum amelioration period could be within 14~17 hours for most of the lime contents in tested soils. This could suggest that the current 24-48 hour amelioration period specified by the Queensland Department of Transport and Main roads could be reduced.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The productivity of the construction industry worldwide has been declining over the past forty years. One approach to improving the situation is by the introduction of lean construction. The IKEA model has also been shown to be beneficial when used in the construction context. A framework is developed in which the lean construction concept is embodied within the IKEA model by integrating Virtual Prototyping (VP) technology and its implementation is described and evaluated through a real-life case implementing the lean production philosophy. The operational flows of the IKEA model and lean construction are then compared to analyze the feasibility of IKEA-based lean construction. It is concluded that the successful application of the IKEA model in this context will promote the implementation of lean construction and improve the efficiency of the industry.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With Australia’s population rapidly ageing, older pedestrian safety has begun to receive greater attention from road safety researchers. However, reliance on simulator studies and observational techniques has limited current understanding of why older pedestrians adopt particular crossing behaviours, and how they perceive crossing the road. The current study aimed to investigate the psychological factors that may contribute to older pedestrians’ crash risk by examining their perceptions of the issues they encounter on the road. Qualitative semi-structured interviews with 18 pedestrians aged 55 years and older were conducted, and the interview transcripts underwent thematic analysis. From this analysis, four key themes emerged. Firstly, the physical design of the road was perceived as posing a significant threat for older pedestrians, particularly sloped, semi-mountable kerbs and designated crossings. Secondly, declines in older pedestrians’ confidence in their ability to cross the road were evident through fewer reported risks being taken. Additionally, older pedestrians sensed an increased threat from other road users when crossing the road, particularly from drivers and cyclists. Finally, older pedestrians referred to the informal rules and strategies used to guide their road crossing. The results suggest that the road environment is perceived as increasingly dangerous and hazardous environment for older pedestrians. Implications regarding the physical road design in areas with an existing high proportion of elderly people are discussed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction and demolition (C&D) waste occupies the largest share of overall waste generation in many countries. However, waste management practices and outcomes may differ between countries. For instance, in Australia, C&D waste recovery is continuously improving during the last years but the amount of C&D waste increases every year, as there has been little improvement in waste avoidance and minimization. In contrast, in Germany, waste generation remains constant over many years despite the continuous economic growth. The waste recycling rate in Germany is one of the highest in the world. However, most waste recycled is from demolition work rather than from waste generated during new construction. In addition, specific laws need to be developed to further reduce landfill of non-recycled waste. Despite of the differences, C&D waste generation and recovery in both countries depend on the effectiveness of the statutory framework, which regulates their waste management practices. This is an issue in other parts of the world as well. Therefore countries can learn from each other to improve their current statutory framework for C&D waste management. By taking Germany and Australia as an example, possible measures to improve current practices of C&D waste management through better statutory tools are identified in this paper. After providing an overview of the statutory framework of both countries and their status in waste generation and recovery, a SWOT analysis is conducted to identify strengths, weaknesses, opportunities and threats of the statutory tools. Recommendations to improve the current statutory frameworks, in order to achieve less waste generation and more waste recovery in the construction industry are provided for the German and Australian government and they can also be transferred to other countries.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A number of tests and test batteries are available for the prediction of older driver safety, but many of these have not been validated against standardized driving outcome measures. The aim of this study was to evaluate a series of previously described screening tests in terms of their ability to predict the potential for safe and unsafe driving. Participants included 79 community-dwelling older drivers (M=72.16 years, SD=5.46; range 65-88 years; 57 males and 22 females) who completed a previously validated multi-disciplinary driving assessment, a hazard perception test, a hazard change detection test and a battery of vision and cognitive tests. Participants also completed a standardized on-road driving assessment. The multi-disciplinary test battery had the highest predictive ability with a sensitivity of 80% and a specificity of 73%, followed by the hazard perception test which demonstrated a sensitivity of 75% and a specificity of 61%. These findings suggest that a relatively simple and practical battery of tests from a range of domains has the capacity to predict safe and unsafe driving in older adults.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Over the last few decades, construction project performance has been evaluated due to the increase of delays, cost overruns and quality failures. Growing numbers of disputes, inharmonious working environments, conflict, blame cultures, and mismatches of objectives among project teams have been found to be contributory factors to poor project performance. Performance measurement (PM) approaches have been developed to overcome these issues, however, the comprehensiveness of PM as an overall approach is still criticised in terms of the iron triangle; namely time, cost, and quality. PM has primarily focused on objective measures, however, continuous improvement requires the inclusion of subjective measures, particularly contractor satisfaction (Co-S). It is challenging to deal with the two different groups of large and small-medium contractor satisfaction as to date, Co-S has not been extensively defined, primarily in developing countries such as Malaysia. Therefore, a Co-S model is developed in this research which aims to fulfil the current needs in the construction industry by integrating performance measures to address large and small-medium contractor perceptions. The positivist paradigm used in the research was adhered to by reviewing relevant literature and evaluating expert discussions on the research topic. It yielded a basis for the contractor satisfaction model (CoSMo) development which consists of three elements: contractor satisfaction (Co-S) dimensions; contributory factors and characteristics (project and participant). Using valid questionnaire results from 136 contractors in Malaysia lead to the prediction of several key factors of contractor satisfaction and to an examination of the relationships between elements. The relationships were examined through a series of sequential statistical analyses, namely correlation, one-way analysis of variance (ANOVA), t-tests and multiple regression analysis (MRA). Forward and backward MRAs were used to develop Co-S mathematical models. Sixteen Co-S models were developed for both large and small-medium contractors. These determined that the large contractor Malaysian Co-S was most affected by the conciseness of project scope and quality of the project brief. Contrastingly, Co-S for small-medium contractors was strongly affected by the efficiency of risk control in a project. The results of the research provide empirical evidence in support of the notion that appropriate communication systems in projects negatively contributes to large Co-S with respect to cost and profitability. The uniqueness of several Co-S predictors was also identified through a series of analyses on small-medium contractors. These contractors appear to be less satisfied than large contractors when participants lack effectiveness in timely authoritative decision-making and communication between project team members. Interestingly, the empirical results show that effective project health and safety measures are influencing factors in satisfying both large and small-medium contractors. The perspectives of large and small-medium contractors in respect to the performance of the entire project development were derived from the Co-S models. These were statistically validated and refined before a new Co-S model was developed. Developing such a unique model has the potential to increase project value and benefit all project participants. It is important to improve participant collaboration as it leads to better project performance. This study may encourage key project participants; such as client, consultant, subcontractor and supplier; to increase their attention to contractor needs in the development of a project. Recommendations for future research include investigating other participants‟ perspectives on CoSMo and the impact of the implementation of CoSMo in a project, since this study is focused purely on the contractor perspective.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The study presented in this paper reviewed 9,358 accidents which occurred in the U.S. construction industry between 2002 and 2011, in order to understand the relationships between the risk factors and injury severity (e.g. fatalities, hospitalized injuries, or non-hospitalized injuries) and to develop a strategic prevention plan to reduce the likelihood of fatalities where an accident is unavoidable. The study specifically aims to: (1) verify the relationships among risk factors, accident types, and injury severity, (2) determine significant risk factors associated with each accident type that are highly correlated to injury severity, and (3) analyze the impact of the identified key factors on accident and fatality occurrence. The analysis results explained that safety managers’ roles are critical to reducing human-related risks—particularly misjudgement of hazardous situations—through safety training and education, appropriate use of safety devices and proper safety inspection. However, for environment-related factors, the dominant risk factors were different depending on the different accident types. The outcomes of this study will assist safety managers to understand the nature of construction accidents and plan for strategic risk mitigation by prioritizing high frequency risk factors to effectively control accident occurrence and manage the likelihood of fatal injuries on construction sites.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Truancy is recognised as an indicator of engagement in high-risk behaviours for adolescents. Injuries from road related risk behaviours continue to be a leading cause of death and disability for early adolescents (13-14 years). The aim of this research is to determine the extent to which truancy relates to increased risk of road related injuries for early adolescents. Four hundred and twenty-seven Year 9 students (13-14 years) from five high schools in Queensland, Australia, completed a questionnaire about their perceptions of risk and recent injury experience. Self-reported injuries were assessed by the Extended Adolescent Injury Checklist (E-AIC). Injuries resulting from motorcycle use, bicycle use, vehicle use (as passenger or driver), and as a pedestrian were measured for the preceding three months. Students were also asked to indicate whether they sought medical attention for their injuries. Truancy rates were assessed from self-reported skipping class or wagging school over the same three month period. The findings explore the relationship between early adolescent truancy and road related injuries. The relationship between road related injuries and truancy was analysed separately for males and females. Results of this study revealed that road related injuries and reports of associated medical treatment are higher for young people who engage in truancy when compared with non-truant adolescents. The results of this study contribute knowledge about truancy as a risk factor for engagement in road related risks. The findings have the potential to enhance school policies and injury prevention programs if emphasis is placed on increasing school attendance as a safety measure to decrease road related injuries for young adolescents.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

IT-supported field data management benefits on-site construction management by improving accessibility to the information and promoting efficient communication between project team members. However, most of on-site safety inspections still heavily rely on subjective judgment and manual reporting processes and thus observers’ experiences often determine the quality of risk identification and control. This study aims to develop a methodology to efficiently retrieve safety-related information so that the safety inspectors can easily access to the relevant site safety information for safer decision making. The proposed methodology consists of three stages: (1) development of a comprehensive safety database which contains information of risk factors, accident types, impact of accidents and safety regulations; (2) identification of relationships among different risk factors based on statistical analysis methods; and (3) user-specified information retrieval using data mining techniques for safety management. This paper presents an overall methodology and preliminary results of the first stage research conducted with 101 accident investigation reports.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Client owners usually need an estimate or forecast of their likely building costs in advance of detailed design in order to confirm the financial feasibility of their projects. Because of their timing in the project life cycle, these early stage forecasts are characterized by the minimal amount of information available concerning the new (target) project to the point that often only its size and type are known. One approach is to use the mean contract sum of a sample, or base group, of previous projects of a similar type and size to the project for which the estimate is needed. Bernoulli’s law of large numbers implies that this base group should be as large as possible. However, increasing the size of the base group inevitably involves including projects that are less and less similar to the target project. Deciding on the optimal number of base group projects is known as the homogeneity or pooling problem. A method of solving the homogeneity problem is described involving the use of closed form equations to compare three different sampling arrangements of previous projects for their simulated forecasting ability by a cross-validation method, where a series of targets are extracted, with replacement, from the groups and compared with the mean value of the projects in the base groups. The procedure is then demonstrated with 450 Hong Kong projects (with different project types: Residential, Commercial centre, Car parking, Social community centre, School, Office, Hotel, Industrial, University and Hospital) clustered into base groups according to their type and size.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

• The Queensland context • Rationale and aims • Method • Demographics and basic data • Avoidance of driving and walking situations • Success of intended avoidance • Further analyses (preliminary results) • Implications