959 resultados para Produtividade industrial - Ribeirão Preto (SP)


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pós-graduação em Biociências - FCLAS

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

OBJECTIVE: to evaluate the structure, process and results of the Capillary Blood Glucose Self-monitoring Program in a Brazilian city. METHOD: epidemiological, cross-sectional study. The methodological framework of Donabedian was used to construct indicators of structure, process and outcome. A random sample (n = 288) of users enrolled and 96 health professionals who worked in the program was studied. Two questionnaires were used that were constructed for this study, one for professionals and one for users, both containing data for the evaluation of structure, process and outcome. Anthropometric measures and laboratory results were collected by consulting the patients' health records. The analysis involved descriptive statistics. RESULTS: most of the professionals were not qualified to work in the program and were not knowledgeable about the set of criteria for patient registration. None of the patients received complete and correct orientations about the program and the percentage with skills to perform conducts autonomously was 10%. As regards the result indicators, 86.4% of the patients and 81.3% of the professionals evaluated the program positively. CONCLUSION: the evaluation indicators designed revealed that one of the main objectives of the program, self-care skills, has not been achieved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Brazilian construction is with high production which resulted in many service industries and also for businesses that work in conjunction with it. For the furniture industries would not be different, since they are intimately involved with the construction. To meet the demand for furnishings in Brazil, some clusters of industries have developed in recent years, as in the case of Uba (MG), Arapongas (PR) and Bento Gonçalves (RS). For industries sector can always increase its production combining quality and customer satisfaction, is necessary for their production procedures are studied and improved every day. The aim of this research is to propose a solution for simple information system involving the issue of tracking parts of the furniture produced in an industry custom furniture that depend on outsourced services. The research occurred during four months of the year 2013 for the observation of the production of the industry, where possible observing interference could be carried out with the aim of obtaining improvements in the production line. It is concluded that control of the finished product in a custom furniture industry is a very complex work, because the information system must transmit information faithful, which has not happened formerly, but after the implementation of the identification system was significant improvement the transfer of information between sectors mounts internal and external furniture

Relevância:

100.00% 100.00%

Publicador:

Resumo:

There is a growing search for continuous improvement within the companies which creates an obligation of reducing and when it is possible eliminating waste. Production Planning and Control Department (PCP) is not out of this question, making necessary the application of methods and creation of tools that eliminate steps which do not add value to the planning process. This paper aims to develop a tool which concentrates in just one place all the necessary information to make the packaging material requirement planning (MRP) in a agribusiness company. Besides, it also aims, in a more visual way and using devices that prevent mistakes (Poka-Yoke), to reduce the number of reviews and mistakes made by analysts. As a result, an Excel spreadsheet was developed. This spreadsheet shows what happens with the status of planning and receiving of packaging, giving some advices when some critical situation happens. The use of Lean Manufacturing Method and the action research method helped to well define the problem and to reduce the number of steps, spreadsheets and time of process in 80%, 60% and 75%, respectively

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Projeto arquitetônico que consiste na construção de um novo Hospital da Mulher em São José do Rio PretoSP, que foi o primeiro hospital exclusivo para o público feminino da cidade e da região. A ideia era trabalhar apenas com cirurgias limpas ou potencialmente não contaminadas (como cirurgias vasculares, obstétricas, ginecológicas e plásticas), ou seja, com menores riscos de infecção (muito importante principalmente no caso de partos prematuros e do cada vez mais alto percentual de bebês que morrem por causa de infecções hospitalares). Um dos diferenciais do hospital era oferecer ambientes que lembravam uma casa de repouso e instalações hoteleiras, descaracterizando-o de um hospital comum. O investimento em instalações fazia parte do incentivo ao “turismo de saúde” da cidade, que atraia diariamente pacientes de vários municípios e Estados do País. Atualmente o local do antigo hospital é ocupado por uma clínica privada, sendo necessária a construção de um novo prédio, que viria de encontro aos anseios da cidade que, por possuir a Faculdade de Medicina de Rio Preto (FAMERP), vinculada à UNICAMP, ser um pólo regional de saúde com referências à nível nacional teria potencial para abranger uma grande demanda de pacientes diferenciados

Relevância:

100.00% 100.00%

Publicador:

Resumo:

With the advent of a global economy, Lean Six Sigma meets the demand of new production process that creates products within the customer’s specification without any wastage. The objectives of this work is to use the concepts Lean Manufacturing and Six Sigma parallel to minimize costs, increase the customer base, reduce the delivery time which implies an increase in the turnover of products on the shelves in a packaging company. We used the DMAIC method to continue working. The method DMAIC indicated the main failure modes that were fixed in the step improve. At this stage the tools of Lean Manufacturing gain tremendous value by optimizing processes with defects. The conclusion involves an increase in monthly billing, a corporate restructuring and, finally, a renewal in how to conduct the work of management

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This work evaluates the implementation of Lean Six Sigma into the Steam Turbine’s Blades Manufacturing Process, aiming to improve productivity, quality and operational efficiency. Therefore, several tools have been applied, such as VSM, Spaghetti Diagram, Ishikawa, Pareto, DMAIC, Benchmarking and Control Charts, seeking to propose process improvements, as well as Quality Indicators creation. It was obtained a significant waste reduction throughout the process, achieving a lead time reduction of 42% and 83,41% in transport. Also, were introduced the Lean Thinking concepts, such as pull production and Continuous material flow. At the same time, it was possible to calculate the process capability and the sigma level, evaluating and proposing some improvements

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Understanding the linkages between the natural elements is essential for being promoted the land use, occupation and sustainable management of environmental systems. Universal Soil Loss Equation (USLE), as a predictive model of erosion, is important to allowing the prevention of possible environmental impacts which may drastically interfere in natural or anthropic environments, as well as prevent potential financial wastes and even contribute to greater efficiency of agricultural production. This research will be working some USLE parameters, emphasizing topographic factor from Ribeirão Monjolo Grande watershed. Among the factors considered by the USLE, the Topographic Factor interferes directly in the erosive dynamic of a watershed because it involves variables related to hydrological processes that occur on it. In this research, were discussed different methods for obtaining the Topographic Factor (BERTONI e LOMBARDI NETO, 1985; MOORE e BURCH, 1986; DESMET E GOVERS, 1996) in GIS environment. After comparison between the methods, was indicated that best represents the conditions of geometry strand of the study area. Finally, other factors (R, K, C, P) considered by the USLE were obtained. The attainment of these parameters were guided by the use of geotechnologies, especially in Geographic Information Systems (GIS), with the assistance of secondary data and periodic field visits. The results obtained contributed to the understanding of hydrosedimentological dynamic in this area and serve as a viable strategy for studies of soil loss, aiming at developing consistent material for future researches about environmental planning and land management

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Facing the competitive current market, increases the growing managerial commitment to minimize the frequent occurrence of service failures that characterized the past. Given the fact that the supply of a product in the correct location and on time, undamaged and correctly billed market requirement becomes framed the present work. Based on a case study, supported in parallel bibliographical references in the literature in a company of sugar and alcohol sector, the survey aims to measure and evaluate the real-time delivery from suppliers in order to ensure the best level of service to the company in question by suppliers, by reducing idle time of delivery, since the control system does not supply the pre-established and / or observed above, thus obtaining a better management and supply of replacement material. To assist the work, developed a project in the company in question in order to analyze and identify applications of concepts of lead time along the supply chain through an exploratory study in order to provide a beneficial outcome to the company through monitoring and performance of its suppliers, which will enable an aid to future decision-making

Relevância:

100.00% 100.00%

Publicador:

Resumo:

O presente Trabalho Final de Graduação apresenta um projeto que se baseou no programa oferecido pelo Centro Educacional Unificado – CEU, equipamento público criado em 2001 pela Secretaria Municipal de Educação da Prefeitura de São Paulo destinado a áreas periféricas da cidade de São Paulo. E também no programa oferecido pelo SESI – Serviço Social da Indústria, entidade de direito privado criado em 1946 pela CNI – Confederação Nacional da Indústria. Formulado para funcionar como um espaço de sociabilização da vida urbana e com o intuito de oferecer EDUCAÇÃO, CULTURA E LAZER para o desenvolvimento integral de crianças, jovens e adultos das comunidades do entorno. O programa desenvolvido para o CENTRO DE EDUCAÇÃO, CULTURA E LAZER, conta com um Bloco Cultural o qual apresenta espaços como: Biblioteca, Teatro, Refeitório, Administração, Salas de atividades diversas e a Creche; o Bloco Educacional Abriga um Centro de Educação Infantil (CEI), uma Escola Municipal de Educação Infantil (EMEI), uma Escola Municipal de Ensino Fundamental (EMEF) e Educação de Jovens e Adultos (EJA). E por fim, uma Praça de Esporte e Lazer equipada com Ginásio Poliesportivo coberto, quadras descobertas, piscinas e playground, sendo estes espaços abertos aos finais de semana com a finalidade de proporcionar opções de recreação em beneficio de toda comunidade. A escolha do local para a implantação deste projeto foi a cidade de Ribeirão Preto (localizada a nordeste do Estado de São Paulo), no bairro Jardim Jamil Seme Cury, conjunto habitacional criado para receber moradores vindos de uma comunidade carente que se localizava no entorno do aeroporto Leite Lopes, o qual passa por discussões para a inserção de um Terminal Internacional de Cargas, e consequentemente necessita ampliar sua área de abrangência

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Through observation of the production process industries today, one can encounter the needs of the large uncertainties related improvements and changes in the production environment, a fact that inspired the search for solutions that can respond quickly to these changes. Thus, this paper describes the review of implementation of TPM (total productivity management), which aims to optimize two distinct processes in the Vale do Paraíba´s pharmaceutical industry one of through the pillar of specific improvement. The main objective is to propose an efficient alternative to proposing loss management processes by identifying and eliminating the same in a systematic process. To develop this analysis was necessary to explore concepts of TPM and tools that help in taking data, identification and clarification of the phenomena that cause failures in the process, which were essential to ensure the development of the analysis. The concepts covered are usually presented during an undergraduate degree in Engineering. Data compiled by the analysis are able to serve as a strategic benchmark for decision making by managers, providing alternative response variables and uncertainty of the organizational environment, a fact that facilitates the management of human resources and productive

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Currently the market requires companies to adapt for they can have the lowest possible cost in their manufacturing, be it a good or service, thus obtaining a greater profit. For this profit the Toyota Production System applies lean manufacturing practices actions with reduced spending, smaller lots and stocks, generated by market demand. The technique allows SMED with few actions, changes and investments that time does not exceed one digit on your total time. This case study shows that only with standardization and use of inexpensive improvements, could reduce setup time on a machine for 70 minutes to time of approximately 48 minutes with little investment, demonstrating the viability of the tool presented

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pós-graduação em Microbiologia Agropecuária - FCAV

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)