955 resultados para Pipelines--Maintenance and repair
Resumo:
To maintain a power system within operation limits, a level ahead planning it is necessary to apply competitive techniques to solve the optimal power flow (OPF). OPF is a non-linear and a large combinatorial problem. The Ant Colony Search (ACS) optimization algorithm is inspired by the organized natural movement of real ants and has been successfully applied to different large combinatorial optimization problems. This paper presents an implementation of Ant Colony optimization to solve the OPF in an economic dispatch context. The proposed methodology has been developed to be used for maintenance and repairing planning with 48 to 24 hours antecipation. The main advantage of this method is its low execution time that allows the use of OPF when a large set of scenarios has to be analyzed. The paper includes a case study using the IEEE 30 bus network. The results are compared with other well-known methodologies presented in the literature.
Fuzzy Monte Carlo mathematical model for load curtailment minimization in transmission power systems
Resumo:
This paper presents a methodology which is based on statistical failure and repair data of the transmission power system components and uses fuzzyprobabilistic modeling for system component outage parameters. Using statistical records allows developing the fuzzy membership functions of system component outage parameters. The proposed hybrid method of fuzzy set and Monte Carlo simulation based on the fuzzy-probabilistic models allows catching both randomness and fuzziness of component outage parameters. A network contingency analysis to identify any overloading or voltage violation in the network is performed once obtained the system states by Monte Carlo simulation. This is followed by a remedial action algorithm, based on optimal power flow, to reschedule generations and alleviate constraint violations and, at the same time, to avoid any load curtailment, if possible, or, otherwise, to minimize the total load curtailment, for the states identified by the contingency analysis. In order to illustrate the application of the proposed methodology to a practical case, the paper will include a case study for the Reliability Test System (RTS) 1996 IEEE 24 BUS.
Resumo:
A presente dissertação tem como objetivo efetuar a análise comparativa de soluções adotadas de reabilitação de pavimentos flexíveis que integram a rede rodoviária nacional. No âmbito desta análise apresenta-se o estado da arte respeitante à reabilitação de pavimentos flexíveis, nomeadamente: mecanismos de degradação, famílias de degradações, avaliação da capacidade de carga dos pavimentos, metodologia utilizada no dimensionamento do reforço de pavimentos, sendo também efetuada uma análise comparativa de técnicas de reforço de pavimentos e dos tratamentos antifendas. Neste contexto, apresenta-se um caso de estudo no qual é efetuada uma análise de três soluções possíveis para a reabilitação estrutural do pavimento do IC 20 entre Almada e a Costa de Caparica. É feita a descrição da solução projetada pela EP, SA patenteada em concurso público lançado em 2007, a qual é de certa forma inovadora ao nível do tratamento retardador da reflexão de fendas. Aquela solução técnica é constituída pela aplicação de grelhas de fibra de vidro e grelhas de fibra de carbono, seguidas da colocação de uma camada de desgaste em mistura betuminosa rugosa com betume modificado com baixa percentagem de borracha reciclada de pneus usados (BBr - BBB). Complementarmente, é efetuada a análise da solução do projeto de reabilitação do IC 20, patenteado pela Subconcessionária do Baixo Tejo, que contemplou a aplicação de misturas betuminosas rugosas com betume modificado com média percentagem de borracha reciclada de pneus usados (BBr - BBM). Para além da solução patenteada pela subconcessionária, é analisada a solução do projeto de alterações (variante) apresentado pelo agrupamento de empresas construtoras, que foi adotado na execução da obra realizada no IC 20. A intervenção de reabilitação estrutural contemplou a utilização de uma camada de ligação em AC 16 10/20 (MBAM) e uma camada de desgaste em mistura betuminosa rugosa com betume modificado com média percentagem de borracha reciclada de pneus usados (BBr - BBM). Adicionalmente à caracterização de diferentes soluções de reabilitação de pavimentos flexíveis adotados em Portugal, é efetuada uma análise comparativa dos custos de ciclo de vida (construção, manutenção e conservação) de cada tipo de solução de reabilitação.
Resumo:
Este trabalho aborda o Programa de Manutenção de Aeronaves das companhias de aviação de baixo custo, tendo como foco a análise e identificação dos requisitos legais e das metodologias de desenvolvimento de um Programa de Manutenção de uma aeronave e a comparação dos custos de manutenção de companhias de baixo custo com as companhias regulares. A aplicação eficaz de um programa de manutenção, para além de reduzir os seus custos, tem um impacto positivo na segurança, economia da manutenção e na fiabilidade de despacho. A metodologia utilizada foi a análise de informação de publicações e artigos. Com base na revisão de literaturas especializadas, fez-se uma selecção dos diversos aspectos necessários para se obter um Programa de Manutenção, o que permitiu construir o caso de estudo e efectuar a análise dos custos inerentes de manutenção de um operador aéreo de baixo custo e de um operador aéreo regular. Os resultados da análise permitiram chegar a veracidade da hipótese de que do ponto de vista de manutenção é igualmente seguro ou não seguro voar numa companhia de baixo custo e numa companhia regular, assim independentemente do tipo de companhia, ambas devem cumprir os requisitos para aprovação do PMA imposto pela autoridade aeronáutica, para garantir a aeronavegabilidade das aeronaves, ou seja, a sua segurança para a condição de voo, sem pôr em causa o carimbo baixo custo ou regular da companhia.
Resumo:
O presente artigo debruça-se sobre os conceitos de responsabilidade social e marketing, dando especial enfoque ao marketing relacionado a causas, servindo o sector lucrativo e não lucrativo. Focaliza-se a análise na campanha e projecto CAUSA MAIOR uma iniciativa do Modelo e Cruz Vermelha Portuguesa, com três anos de existência, dirigido a diversas franjas da população. Este é um projecto socialmente responsável por visar combater o isolamento e a exclusão social numa categoria demográfica especialmente frágil - os seniores, materializando-se em cirurgias, equipamentos ortopédicos de apoio, entre outros. O CAUSA MAIOR teve acções de marketing fortíssimas com vista à promoção do seu produto solidário, para isso recorreu à associação a figuras públicas, parceria com uma estação televisiva, surgimento em programas televisivos, de tal forma que o projecto per si garantiu a continuidade do mesmo e inputs muito importantes para a Cruz Vermelha Portuguesa.
Resumo:
Mestrado em Engenharia Electrotécnica – Sistemas Eléctricos de Energia
Resumo:
Pós-graduação em Agronomia (Energia na Agricultura) - FCA
Resumo:
Mestrado em Engenharia Química. Ramo optimização energética na indústria química
Resumo:
Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Mecânica Ramo Manutenção e Produção
Resumo:
A presente dissertação tem como intuito aplicar o regime de Responsabilidade Ambiental no perímetro industrial da Monteiro, Ribas – Indústrias, S.A.. Para tal, averiguou-se que na ordem jurídica nacional, o regime de Responsabilidade Ambiental (RA) encontra-se consagrada na legislação nacional pelo Decreto-Lei nº 147/2008 de 29 de Julho (Diploma RA),e respetivas alterações, aplicando-se a danos ambientais ou ameaças iminentes de danos ambientais causados aos recursos naturais nomeadamente “espécies e habitats naturais protegidos”, “água” e “solo”. Também se verificou que este regime introduz obrigações específicas para os operadores abrangidos, designadamente é da responsabilidade do operador aplicar as medidas de prevenção e reparação dos danos, devendo ser reportados os acontecimentos à autoridade competente, Agência Portuguesa do Ambiente. Para cumprimento do requisito da garantia financeira e sendo a Monteiro, Ribas – Indústrias, S.A. enumerada no Anexo III do Decreto-Lei nº 147/2008 de 29 de Julho, optou-se pela constituição de um fundo próprio no valor de 50.000,00€. Com recurso à metodologia proposta pela Norma Espanhola UNE 150008:2008 - Análise e avaliação do Risco Ambiental, procedeu-se à formulação de vários cenários e quantificação de riscos para a Monteiro, Ribas – Indústrias, S.A. tendo-se apurado que os riscos estavam avaliados como baixo ou moderado. Por fim, conclui-se que em Portugal, embora exista um Decreto-Lei sobre Responsabilidade Ambiental, este tema ainda não está suficientemente desenvolvido pois não permite proceder a análise e avaliação do risco ambiental, tendo sido tomado assim como referência a metodologia aplicada na Norma Espanhola UNE 150008:2008.
Resumo:
The presented work was conducted within the Dissertation / Internship, branch of Environmental Protection Technology, associated to the Master thesis in Chemical Engineering by the Instituto Superior de Engenharia do Porto and it was developed in the Aquatest a.s, headquartered in Prague, in Czech Republic. The ore mining exploitation in the Czech Republic began in the thirteenth century, and has been extended until the twentieth century, being now evident the consequences of the intensive extraction which includes contamination of soil and sub-soil by high concentrations of heavy metals. The mountain region of Zlaté Hory was chosen for the implementation of the remediation project, which consisted in the construction of three cells (tanks), the first to raise the pH, the second for the sedimentation of the formed precipitates and a third to increase the process efficiency in order to reduce high concentrations of metals, with special emphasis on iron, manganese and sulfates. This project was initiated in 2005, being pioneer in this country and is still ongoing due to the complex chemical and biological phenomenon’s inherent to the system. At the site where the project was implemented, there is a natural lagoon, thereby enabling a comparative study of the two systems (natural and artificial) regarding the efficiency of both in the reduction/ removal of the referred pollutants. The study aimed to assist and cooperate in the ongoing investigation at the company Aquatest, in terms of field work conducted in Zlaté Hory and in terms of research methodologies used in it. Thereby, it was carried out a survey and analysis of available data from 2005 to 2008, being complemented by the treatment of new data from 2009 to 2010. Moreover, a theoretical study of the chemical and biological processes that occurs in both systems was performed. Regarding the field work, an active participation in the collection and in situ sample analyzing of water and soil from the natural pond has been attained, with the supervision of Engineer, Irena Šupiková. Laboratory analysis of water and soil were carried out by laboratory technicians. It was found that the natural lagoon is more efficient in reducing iron and manganese, being obtained removal percentages of 100%. The artificial lagoon had a removal percentage of 90% and 33% for iron and manganese respectively. Despite the minor efficiency of the constructed wetland, it must be pointed out that this system was designed for the treatment and consequent reduction of iron. In this context, it can conclude that the main goal has been achieved. In the case of sulphates, the removal optimization is yet a goal to be achieved not only in the Czech Republic but also in other places where this type of contamination persists. In fact, in the natural lagoon and in the constructed wetland, removal efficiencies of 45% and 7% were obtained respectively. It has been speculated that the water at the entrance of both systems has different sources. The analysis of the collected data shows at the entrance of the natural pond, a concentration of 4.6 mg/L of total iron, 14.6 mg/L of manganese and 951 mg/L of sulphates. In the artificial pond, the concentrations are 27.7 mg/L, 8.1 mg/L and 382 mg/L respectively for iron, manganese and sulphates. During 2010 the investigation has been expanded. The study of soil samples has started in order to observe and evaluate the contribution of bacteria in the removal of heavy metals being in its early phase. Summarizing, this technology has revealed to be an interesting solution, since in addition to substantially reduce the mentioned contaminants, mostly iron, it combines the low cost of implementation with an reduced maintenance, and it can also be installed in recreation parks, providing habitats for plants and birds.
Resumo:
A noção de Economia relativa ao Hidrogénio no vocabulário dos líderes políticos e empresariais tem vindo a mudar sobretudo pela preocupação da poluição global, segurança energética e mudanças climáticas, para além do crescente domínio técnico dos cientistas e engenheiros. O interesse neste composto, que é o elemento mais simples e abundante no universo, está a crescer, devido aos avanços tecnológicos das células de combustível – as potenciais sucessoras das baterias dos aparelhos portáteis eletrónicos, centrais elétricas e motores de combustão interna. Existem métodos já bem desenvolvidos para produzir o hidrogénio. Contudo, destacase a eletrólise da água, não só por ser um método simples mas porque pode utilizar recursos energéticos renováveis, tais como, o vento ou os painéis fotovoltaicos, e aumentar a sua eficiência. Os desafios para melhorar a utilização deste método consistem em reduzir o consumo, a manutenção e os custos energéticos e aumentar a confiança, a durabilidade e a segurança. Mais ainda, consistem em rentabilizar o subproduto oxigénio pois é um gás industrial e medicinal muito importante. Neste trabalho, estudou-se a viabilidade económica da instalação de uma unidade de produção de hidrogénio e oxigénio puros por eletrólise da água, utilizando como fonte energética a energia solar, na empresa Gasoxmed – Gases Medicinais S.A., pretendendo num futuro próximo, comercializar o hidrogénio como fonte de energia, e por outro lado, aproveitar o subproduto oxigénio para utilização industrial. Projetou-se assim uma unidade utilizando um eletrolisador da marca Proton, modelo C30, com capacidade de produção gasosa de 3 kg/h (30 m3/h) de hidrogénio e 20 kg/h (15 m3/h) de oxigénio. Os gases produzidos são comprimidos num compressor da marca RIX a 200 bares para posterior armazenamento em cilindros pressurizados. Dimensionou-se ainda um sistema de miniprodução fotovoltaico com potência 250 kW para alimentar eletricamente a instalação. A realização do projeto na nova área de produção necessitará de 1.713.963€, os quais serão adquiridos por empréstimo bancário. Definiram-se todos os custos fixos associados ao projeto que perfazem um total de 62.554€/mês para os primeiros 5 anos (duração do crédito bancário) findo o qual diminuirão para 21.204€/mês. Da comercialização do hidrogénio, do oxigénio industrial e da eletricidade produzida no sistema de miniprodução de 250 kW, prevê-se um lucro mensal de 117.925€, perfazendo assim um total líquido mensal positivo de 55.371€ durante os primeiros 5 anos e a partir daí de 96.721€/mês, resultando uma amortização do investimento inicial no final do 3º ano.
Resumo:
Trabalho Final de Mestrado para a obtenção do grau de Mestre em Engenharia Civil na Área de Especialização de Edificações
Resumo:
Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Mecânica
Resumo:
Os hospitais necessitam de desenvolver programas de gestão de equipamentos médicos, onde contenha informação pertinente e uma metodologia de planeamento eficaz, para a aquisição do equipamento médico novo, assim como otimizar o controlo metrológico destes equipamentos. Para tal foi fornecida informação sobre os aspetos mais relevantes a ter em conta na compra do equipamento médico, como as especificações e funcionalidades necessárias, normas a que o equipamento deve obedecer, garantias, manutenção e calibração/verificação quando aplicável. A escolha dos equipamentos médicos incidiu sobre os esfigmomanómetros e os monitores de sinais vitais. Estudou-se o funcionamento destes equipamentos e prosseguiu-se depois para a realização de entrevistas aos seus utilizadores, com o intuito de perceber a satisfação, os critérios e as necessidades relativas aos equipamentos existentes na ULSM. Em seguida foram realizadas as fichas de normalização onde se definiram as características físicas, fisiológicas e tecnológicas associadas a ambos os tipos de dispositivos médicos. Posteriormente estudaram-se as normas com as quais os equipamentos devem estar em conformidade para garantir o bom funcionamento. Por fim pesquisou-se quais os requisitos metrológicos, técnicos e os procedimentos de verificação a que os equipamentos devem obedecer. Este documento irá servir como suporte para a aquisição e controlo dos equipamentos médicos aqui estudados, melhorando a sua gestão, manutenção e controlo metrológico.