991 resultados para Long term evaluation


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Background: One strategy to improve pain management in long term care (LTC) is to optimize the emerging role of the nurse practitioner (NP) in LTC. The purpose of this sub study was to learn about the NP role in implementing an onsite, interdisciplinary Pain Team in the LTC home setting.

Methods: We used a case study design that included two NPs who worked at separate LTC homes. Each of the NPs completed a weekly questionnaire of pain-related activities that they engaged in over a one-year implementation period; and a diary, using critical reflection, about their experiences and strategies used to implement the Pain Team. Descriptive statistics and thematic content analysis were used to analyze the case study data.

Findings: NPs tended to be most engaged in pain assessment and collaborated more with licensed nurses and personal support workers; less with pharmacists. NPs were more involved in organizational level activities, such as participating in committee work or assisting with the development of policies and procedures about pain. NPs created palliative care and pain service protocols; engaged in policy development, in-servicing, quality assurance and advocacy; and encouraged best practices. NPs were challenged with time constraints for pain management and balancing other role priorities and felt that increased scope of practice for them was needed.

Conclusions: The results of this study highlight how NPs implemented a Pain Team in LTC which may be helpful to others interested in implementing a similar strategy to reduce residents’ pain.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Although pumped hydro storage is seen as a strategic key asset by grid operators, financing it is complicated in new liberalised markets. It could be argued that the optimum generation portfolio is now determined by the economic viability of generators based on a short to medium term return on investment. This has meant that capital intensive projects such as pumped hydro storage are less attractive for wholesale electricity companies because the payback periods are too long. In tandem a significant amount of wind power has entered the generation mix, which has resulted in operating and planning integration issues due to wind's inherent uncertain, varying spatial and temporal nature. These integration issues can be overcome using fast acting gas peaking plant or energy storage. Most analysis of wind power integration using storage to date has used stochastic optimisation for power system balancing or arbitrage modelling to examine techno-economic viability. In this research a deterministic dynamic programming long term generation expansion model is employed to optimise the generation mix, total system costs and total carbon dioxide emissions, and unlike other studies calculates reserve to firm wind power. The key finding of this study is that the incentive to build capital-intensive pumped hydro storage to firm wind power is limited unless exogenous market costs come very strongly into play. Furthermore it was demonstrated that reserve increases with increasing wind power showing the importance of ancillary services in future power systems. © 2014 Elsevier Ltd. All rights reserved.