919 resultados para Hydropower scheduling


Relevância:

10.00% 10.00%

Publicador:

Resumo:

We explore the finish-to-start precedence relations of project activities used in scheduling problems. From these relations, we devise a method to identify groups of activities that could execute concurrently, i.e. activities in the same group can all execute in parallel. The method derives a new set of relations to describe the concurrency. Then, it is represented by an undirected graph and the maximal cliques problem identifies the groups. We provide a running example with a project from our previous studies in resource constrained project cost minimization together with an example application on the concurrency detection method: the evaluation of the resource stress.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Dissertação de mestrado em Engenharia Industrial

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Dissertação de mestrado em Engenharia de Sistemas

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Monitoring, object-orientation, real-time, execution-time, scheduling

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Mobile embedded systems, wireless communication, real-time systems, real-time scheduling, communication protocols, cooperation, reliability and fault-tolerance, middleware

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Multiproduct plants, Dynamic Optimization, Mixed Integer Linear/Non-Linear Programming, Scheduling

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The modern computer systems that are in use nowadays are mostly processor-dominant, which means that their memory is treated as a slave element that has one major task – to serve execution units data requirements. This organization is based on the classical Von Neumann's computer model, proposed seven decades ago in the 1950ties. This model suffers from a substantial processor-memory bottleneck, because of the huge disparity between the processor and memory working speeds. In order to solve this problem, in this paper we propose a novel architecture and organization of processors and computers that attempts to provide stronger match between the processing and memory elements in the system. The proposed model utilizes a memory-centric architecture, wherein the execution hardware is added to the memory code blocks, allowing them to perform instructions scheduling and execution, management of data requests and responses, and direct communication with the data memory blocks without using registers. This organization allows concurrent execution of all threads, processes or program segments that fit in the memory at a given time. Therefore, in this paper we describe several possibilities for organizing the proposed memory-centric system with multiple data and logicmemory merged blocks, by utilizing a high-speed interconnection switching network.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The value given by commuters to the variability of travel times is empirically analysed using stated preference data from Barcelona (Spain). Respondents are asked to choose between alternatives that differ in terms of cost, average travel time, variability of travel times and departure time. Different specifications of a scheduling choice model are used to measure the influence of various socioeconomic characteristics. Our results show that travel time variability.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

BACKGROUND: Multiple interventions were made to optimize the medication process in our intensive care unit (ICU). 1 Transcriptions from the medical order form to the administration plan were eliminated by merging both into a single document; 2 the new form was built in a logical sequence and was highly structured to promote completeness and standardization of information; 3 frequently used drug names, approved units, and fixed routes were pre-printed; 4 physicians and nurses were trained with regard to the correct use of the new form. This study was aimed at evaluating the impact of these interventions on clinically significant types of medication errors. METHODS: Eight types of medication errors were measured by a prospective chart review before and after the interventions in the ICU of a public tertiary care hospital. We used an interrupted time-series design to control the secular trends. RESULTS: Over 85 days, 9298 lines of drug prescription and/or administration to 294 patients, corresponding to 754 patient-days were collected and analysed for the three series before and three series following the intervention. Global error rate decreased from 4.95 to 2.14% (-56.8%, P < 0.001). CONCLUSIONS: The safety of the medication process in our ICU was improved by simple and inexpensive interventions. In addition to the optimization of the prescription writing process, the documentation of intravenous preparation, and the scheduling of administration, the elimination of the transcription in combination with the training of users contributed to reducing errors and carried an interesting potential to increase safety.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

BACKGROUND: Psychomental stress is a major source of illness and reduced productivity. Data objectifying physiological stress responses are scarce. We studied salivary cortisol levels in a highly stressful environment, the pediatric critical care unit. The aim was to identify targets for organizational changes, to implement these changes and to assess their impact on cortisol levels. DESIGN: Repeated measurements observational cohort study (before and after intervention). SUBJECTS: 84 nurses working in two independent teams (A and B) in a 19 bed pediatric intensive care unit. Between study periods team A experienced a major exchange of experienced staff while the turnover rate in team B remained average. MEASUREMENTS AND INTERVENTIONS: Salivary cortisol samples were collected every 2 h and after stressful events. Nurses in study period I showed elevated cortisol levels at the beginning of the late shift, interpreted as an anticipatory stress reaction. To ease conditions during the early part of the late shift (conflicting tasks, noise and crowding), we postponed the afternoon ward round, limited non-urgent procedures and introduced a change in visiting hours. The early shift, which was not affected by the intervention, served as control. MAIN RESULTS: Both crude and adjusted analysis revealed a decrease of cortisol levels at the beginning of the late shift in team B (p = 0.0009), but not in team A (p = 0.464). The control situation showed no difference between teams and study periods. INTERPRETATION: We demonstrated reduced cortisol secretions in one team following organizational changes, which was probably overridden by the disruption of social coherence in the second team.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Aquest projecte ha tingut com a finalitat principal impulsar un aprenentatge més efectiu dels alumnes en assignatures que, impartides en una modalitat semipresencial a les escoles de Terrassa i Manresa, comporten la realització d’un treball de curs amb un alt contingut de disseny. A més a més, paral·lelament es contribueix a millorar el rendiment acadèmic de l'estudiant, en el marc de la millora global de la docència i de l'aprenentatge a la UPC amb un horitzó d'aproximació als elements que conformen l’Espai Europeu d’Educació Superior. En el context de semipresencialitat, es pretén fomentar l'aprenentatge cooperatiu i donar solució als problemes comunicatius existents a nivell d’intercanvi d’opinions, valoracions i formulació de dubtes vinculats amb el disseny, etc. En aquest projecte, doncs, s’ha creat una metodologia de treball que permet intercanviar informació gràfica (per exemple en format Autocad) a partir de les aplicacions ja incloses en la plataforma virtual Atenea (campus virtual de la UPC). Aquest projecte es basa principalment en tres objectius principals: 1. Millorar l'intercanvi d'informació entre alumnes d’un grup i entre els alumnes i el professor mitjançant el desenvolupament de protocols. 2. Fomentar l’aprenentatge cooperatiu mitjançant la integrar d’eines d’interacció instantània per Internet. 3. Adaptar l’assignatura de "Complexos Industrials" al procés de convergència a l’EEES. L'activitat ha estat desenvolupada al quadrimestre de tardor 2008-2009 i la metodologia ha estat implantadas a l'assignatura Complexos Industrials d'Enginyeria en Organització Industrial de la ETSEIAT i de la EUPM.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

IPH submitted their views on the Draft BAI General and Commercial Communications Code. IPH previously submitted views to the BAI in the first phase of consultation (Oct 2011). The final code will regulate the advertising of food and non-alcoholic beverages that are high in fat, salt or sugar on Irish television channels. The submission sets out approaches to appropriate scheduling and content restrictions as well as to possible exemptions.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

El projecte TFC Planificador de Tasques és una aplicació web que compleixprincipalment la funció de compartir fites, anotacions, recordatoris, etc percadascun dels projectes que desenvolupa una empresa.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

OER development is becoming more sophisticated as instructors and course specialists become more familiar with the environment. Most OER development approaches for online courses have been developed from those that were appropriate in the face-to-face context. However, the OER online environment opens up new possibilities for learning as well as holding particular limitations. This paper presents some approaches that OER implementers should bear in mind when initiating and supporting OER course development projects.1. Beg, borrow, or steal courseware. Don't reinvent the wheel.2. Take what exists and build the course around it.3. Mix and match. Assemble. Don't create.4. Avoid the "not invented here" syndrome. 5. Know the content -garbage in and garbage out.6. Establish deadlines. Work to deadlines, but don't be unrealistic. 7. Estimate your costs and then double them. Double them again. 8. Be realistic in scheduling and scoping.9. The project plan must be flexible. Be prepared for major shifts.10. Build flexibly for reuse and repurposing -generalizability reduces costs 11. Provide different routes to learning. 12. Build to international standards.There are necessary features in every OER, including introduction, schedule etc. but it is most important to keep the course as simple as possible. Extreme Programming (XP) methodology can be adapted from software engineering to aid in the course development process.