976 resultados para Housing supply


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The aims of this article are to examine Lifetime Home Standards (LTHS) and Part M of the UK Building Regulations and to discuss how relevant and successful they are. The UK government expects all new homes to be built to LTHS by 2013. This is increasingly important with an ageing population. The home environment can enable independence and provide a therapeutic place for everyone. As Part M of the building regulations are compulsory in all housing and LTHS are mandatory for public sector housing, a review of research articles was undertaken on these standards. The paper begins with a brief background on accessibility regulations, followed by a critical review of the standards that takes the body of literature that has been written around them into account. This review suggests that the standards should be improved and that designers and architects face challenges to creatively incorporate them into housing design.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Full length critical peer review article about House at Bogwest by architect Emmett Scanlon writing for A10. Included visit to the house and an interview with Steve Larkin. Photographs by Alice Clancy. Photographs and plans describing House at Bogwest.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A compact differential 4-way power combiner with 2.3 dB loss and high common-mode rejection characteristic for use in mm-wave PAs is presented. A complete circuit comprised of a power splitter, two-stage cascode PA array, and a power combiner was implemented in SiGe technology. Measured small-signal gain of at least 17 dB was obtained from 74.5 GHz to 80.5 GHz with a peak 21 dB at 79 GHz. The prototype delivered 13.2 dBm P1dB and 14.3 dBm Psat when operated from a single 3.3 V supply at 75 GHz.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With the increase in construction in dense urban environments, the delays associated with managing the material supply chain to site is called into question. Purpose: The aim of this investigation is to gain the perspective of construction contractors operating in a dense urban environment and the resulting strategies adopted to reduce delays in the delivery of materials to site. Methodology: This is achieved through incorporating a comprehensive literature review on the subject in conjunction with industry interviews with construction professionals in the identification of various management issues and corresponding strategies in the reduction of delays in the delivery of materials to site. Findings: The key issue which emerges is the lack of space for unloading bays while the corresponding key strategy is to schedule deliveries outside peak congestion times. Practical Implication: With confined site construction evident throughout the industry and the noted importance of an effective supply chain, the findings here in further assist on-site management in the daily task of ensuring the effective delivery and off-loading of materials in a complex and hazardous environment. Originality/Value: This research aids on-site management of confined site environments in the coordination of the material supply chain to site.