923 resultados para Construction Project Delivery


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Construction works are project-based and interdisciplinary. Many construction management (CM) problems are ill defined. The knowledge required to address such problems is not readily available and mostly tacit in nature. Moreover, the researchers, especially the students in the higher education, often face difficulty in defining the research problem, adopting an appropriate research process and methodology for designing and validating their research. This paper describes a ‘Horseshoe’ research process approach and its application to address a research problem of extracting construction-relevant information from a building information model (BIM). It describes the different steps of the process for understanding a problem, formulating appropriate research question/s, defining different research tasks, including a methodology for developing, implementing and validating the research. It is argued that a structure research approach and the use of mixed research methods would provide a sound basis for research design and validation in order to make contribution to existing knowledge.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose - Cultural issues in the construction industry have attracted growing attention from both practitioners and academia. However, there are few studies on culture issues at the project level. The influence of project culture has not traditionally been on the research radar. This research aims to investigate the impacts of project culture on the performance of construction projects. Design/methodology/approach - A case study approach, utilising questionnaire surveys, in-depth interviews and review of project documents, was employed to investigate project culture and its associated impacts in two major hospital projects. Findings - The results indicated that project culture played an important role in achieving harmonious relationships between project participants and better project outcomes in terms of schedule, functionality, satisfaction with the process, satisfaction with the relationships, environmental issues addressed commercial success, further business opportunities and overall performance. Case 1 outperformed Case 2 in these performance indicators. Similarly, it became clear that the project’s culture should be developed from the outset and sustained during the project period. Furthermore, it was also highlighted that the project culture should be translated to all levels of the supply chain i.e. sub-contractors and suppliers. Practical implications – The findings enabled the client to understand the role of project culture and actively commit towards the development and maintenance of the project culture from very early on. It also helps project teams to understand how to deal with cultural issues at the project level. Originality/value- This study is one of limited empirical studies that offer in-depth insights of how project culture affects the performance of construction projects. It is also the first study of hospital projects on the research topic.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Managing public sector projects in Malaysia is a unique challenge. This is because of the ethical issues involved during the project procurement process. These ethical issues need attention because they will have an impact on the quality, cost and time of the project itself. The ethical issues here include conflict of interest, bid shopping, collusive tendering, bid cutting, corruption and the payment game. In 2006, 17.3% of 417 Malaysian government contract projects were considered sick due to contractors' performances that failed to conduct the project according to the project plan. Some of the sick projects from these statistics are due to the ethical issues involved. These construction projects have low quality due to the selection of the contractors, done unethically due to personal relationships instead of professional qualifications. That is why it is important to govern the project procurement processes to ensure the accountability and transparency of the decision making process to ensure that these ethical issues can be avoided. Extensive research has been conducted on the ethical issues in the tendering process or the award phase of project management. There is a lack of studies looking at the role of clients, including the government client, in relation to unethical practice in project procurement in the public sector. It is important to understand that ethical issues not only involve the contractors and suppliers but also the clients. Even though there are codes of ethics in the public sectors, ethical issues still arise. Therefore, this research develops a project governance framework (PGEDM) for ethical decision making in the Malaysian public sectors. This framework combines the ethical decision making process together with the project governance principals in guiding the public sectors with ethical decision making in project procurement. A triangulation of questionnaire survey and Delphi study was employed in this research to collect required qualitative and quantitative data. A questionnaire survey was conducted among the public officials (the practitioners) who are currently working in the procurement area in the Malaysian public sectors, in identifying the ethical behaviours and factors influencing further ethical behaviour to occur. A Delphi study was also conducted with the assistance of a panel of experts consisting of practitioners that have expertise in the area of project governance and project procurement as well as academician, which further considered the relationship and the influence of the criteria and indicators of ethical decision making (EDM) and project governance (project criteria, organisational culture, contract award criteria, individual criteria, client's requirements, government procedures and professional ethics). Through the identification and integration of the factors and EDM criteria as well as the project governance criteria and EDM steps for ethical issues, a PGEDM framework was developed to promote, and drive consistent decision outcome in project procurement in the public sector. The framework contributes significantly to ethical decision making in the project procurement process. These findings not only give benefit to the people involved in project procurement but also to the public officials in guiding them to be more accountable in handling ethical issues in the future and to have a more transparent decision making process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Nowadays, most of the infrastructure development projects undertaken are complex in nature. Practically, public clients who do not have a good understanding of the design and management may suffer severe losses, especially for infrastructure projects. There is a need for luring the right consultant to secure client's investment in infrastructure developments. Throughout the project life cycle, consultants play vital role from the inception to completion stage of a project. A few studies in Malaysia show that infrastructure projects involving irrigation and drainage have experience problems such as poor workmanship, delay and cost overrun due to the consultant's inability or the client incompetence of recruiting consultants in time. This highlights the need of aided decision making and an efficient system to select the best consultant by using Decision Support System (DSS). On the other hand, recent trends reveal that most DSS in construction only concentrate on decision model development. These models are impractical and unused as they are complicated or difficult for laymen such as project managers to utilize. Thus, this research attempts to develop an efficient DSS for consultant selection namely consultDeSS. Driven by the motivation and research aims, this study deployed Design Science Research Methodology (DSRM) dominant with a combination of case studies at the Malaysian Department of Irrigation and Drainage (DID). Two real projects involving irrigation and drainage infrastructure were used to design, implement and evaluate the artefact. The 3-tier consultDeSS was revised after the evaluation and the design was significantly improved based on user feedback. By developing desirable tools that fit client's needs will enhance the productivity and minimize conflict within groups and organisations. The tool is more usable and efficient compared to previous studies in construction. Thus, this research has demonstrated a purposeful artefact with a practical and valid structured development approach that is applicable in a variety of problems in construction discipline.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Earthwork planning has been considered in this article and a generic block partitioning and modelling approach has been devised to provide strategic plans of various levels of detail. Conceptually this approach is more accurate and comprehensive than others, for instance those that are section based. In response to environmental concerns the metric for decision making was fuel consumption and emissions. Haulage distance and gradient are also included as they are important components of these metrics. Advantageously the fuel consumption metric is generic and captures the physical difficulties of travelling over inclines of different gradients, that is consistent across all hauling vehicles. For validation, the proposed models and techniques have been applied to a real world road project. The numerical investigations have demonstrated that the models can be solved with relatively little CPU time. The proposed block models also result in solutions of superior quality, i.e. they have reduced fuel consumption and cost. Furthermore the plans differ considerably from those based solely upon a distance based metric thus demonstrating a need for industry to reflect upon their current practices.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Over the past 20 years there has been a considerable push at all three tiers of Government and private industry in Australia to improve the energy efficiency and sustainability levels of residential housing. A number of these initiatives have been voluntary, such as solar power and solar heating rebates, with other mandatory measures being incorporated into building standards and codes. Although the importance of energy efficiency and sustainable materials have been widely conveyed both at the academic and public level, it does not always reflect in the residential house purchase decision by typical house buyers, including residential property investors. This paper will analyse a range of housing markets in Brisbane to determine the investment performance of those markets over the past 3 years to determine any significant differences between new residential suburbs and older residential suburbs where houses have not been constructed to the current energy efficiency and sustainability guidelines. The range of suburbs to be analysed will focus on middle to lower high value suburbs, with a particular focus on residential housing in Master Planned Communities to determine if socio-economic factors and development size and scope have an impact of the purchase and investment performance of sustainable houses in comparison to older housing stock. The paper confirms that the residential property market shows a higher capital return for residential property built under stricter sustainability guidelines than similar located and type of property built prior to the BCA 2004 and older style project type homes erected prior to 2000.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Sessional Academic Success (SAS) project is a sustainable, distributed model for supporting sessional staff at QUT. Developed by the Learning and Teaching Unit. SAS complements our Sessional Academic Program (SAP): a sequence of formal academic development workshops explained in complementary nomination. SAS recognises that while these programs are very well received and a crucial aspect of preparing and advancing sessional teachers, they are necessarily encapsulated in the moment of their delivery and are generic, as they address all faculties (with their varied cultures, processes and pedagogies). The SAS project extends this formal, centrally offered activity into local, ‘just in time’, ongoing support within schools. It takes a distributed leadership approach. Experienced sessional academics are recruited and employed as Sessional Academic Success Advisors (SASAs). They provide sessional staff in their schools with contextually specific, needs based, peer-to-peer development opportunities; one-on-one advice on classroom management and strategies for success; and help to trouble-shoot challenges. The SASAs are trained by the Learning and Teaching Unit co-ordinator, and ongoing support is provided centrally and by school-based co-ordinators. This team approach situates the SASAs at the centre of an organisation map (see diagram of support relationships below). The SAS project aims to support sessional staff in their professional development by: • Offering contextual, needs-based support at school level by harnessing local expertise; • Providing further development opportunities that are local and focal; SAS aims to retain Sessional Staff by: • Responding to self-nominated requests for support and ‘just in time’, safe and reliable advice in times of need; • Building sessional staff confidence through help with dealing with challenges from a trusted peer; • Building a supportive academic community for sessional staff, which helps them feel a part of faculty life, and a community of teaching practice. SAS aims to support sessional staff in the development of academic teaching careers by: • Recognising the capacity of experienced sessional staff to support their peers in ways that are unique, valuable and valued and providing the agency to do so; • Providing career advancement and leadership opportunities for sessional staff. SAS takes unique approaches within each school using strategies such as: • Welcomes and schools orientation by SASAs; • Regular check ins; face-to-face advice and online support; • Compiling local resources to complement university wide resources. • Sessional-to-sessional ‘just in time’ training (eg. assessment and marking when marking commences); • Peer feedback and mentoring (the opportunities to sit in more experiences sessionals’ classes; • Sessional staff awards (nominated by students); • Communities of practice to discuss topics and issues with a view to (and support for) publishing on learning and teaching. In these ways, SASAs complement support offered by unit coordinators, administrators, and the Learning and Teaching Unit. Pairing senior and ‘understudy’ advisors ensures a line of succession, sustainability and continuity. A pilot program commenced in 2012 involving three schools (Psychology and Social Work; Electrical Engineering and Computer Science; Media, Entertainment and Creative Arts). It will be expanded across schools in 2013.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose Most barriers and enablers of sustainable projects are related to procurement. This study proposes a framework for evaluating green procurement practices throughout the lifecycle of road construction projects and demonstrates its application through an Australian case study. Design/methodology/approach The study is based on linking the phases of road construction with incentive mechanisms for proactively motivating behavioural change. A holistic view on utilised and potential incentives is attempted with a literature review and a state-of-practice review. The latter is based on interviews and 90 policy and procurement documents across five Australian states. Findings An evaluation framework with seven procurement stages is suggested to describe current state green procurement incentives throughout the delivery lifecycle of road construction projects. The Australian case study was found to provide useful data to identify gaps and strong points of the different states regarding their level of integration of sustainability and greenhouse gas emissions GHG) reduction elements in their procurement practices. This understanding was used to draw recommendations on future advancement of green procurement. Originality/value: Government entities across the globe can impact considerably the achievement of sustainability and GHG targets, by using their procurement practices and requirements to create incentives for contractors and suppliers to engage in more GHG conscious practices. The present study provides a systematic account of how green procurement practices can be underpinned using the Australian road construction industry as a case study, and distinguish between strong and weak links in the green procurement chain to draw recommendations for future initiatives.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper demonstrates that project management is a developing field of academic study in management, of considerable diversity and richness, which can make a valuable contribution to the development of management knowledge, as well as being of considerable economic importance. The paper reviews the substantial progress and trends of research in the subject, which has been grouped into nine major schools of thought: optimization, modelling, governance, behaviour, success, decision, process, contingency, and marketing. The paper addresses interactions between the different schools and with other related management fields, and provides insights into current and potential research in each and across these schools.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Construction delay has been a protracted problem for the Malaysian construction industry. Recent report showed that 80% of public sector projects are behind schedule. This underachieving time performance has led to many problems including public complaints, loss of reputation and revenue for the government and a slump in the industry’s GDP contribution. Research in the area of project delay has mushroomed worldwide with attempts to place mitigation plans, but delay remains a global phenomenon. There is now an urgent need for revolutionizing construction practices and past research, backed up with few successful cases suggests that Supply Chain Management (SCM) could prove beneficial to reduce or eliminate delays in construction. SCM which originated from the automotive manufacturing industry promotes a more collaborative approach to construction management and has recently gained attention of the construction industry. However every country, including Malaysia, would certainly have disparities of their own compared to others being it from the cultural point of view, nature of problems, locality or improvements needed. Therefore, this paper will present part of a Ph.D. research which aims at illustrating the Malaysian construction industry experts’ perception of the Malaysian public sector project delay, provide insight into these dilemmas, highlights the problems with current practices, its effects and the improvements needed. Subsequently, this paper would propose ratification to the problems using SCM. A semi-structured interview has been conducted to practitioners with at least 20 years’ experience in the industry. The findings showed that Malaysia may be unique compared to other countries and that by considering a number of additional factors, SCM could prove beneficial to increase efficiency of the Malaysian public sector projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The construction industry has long been burdened with inherent adversarial relationships among the parties and the resulting disputes. Dispute review boards (DRBs) have emerged as alternatives to settle construction-related disputes outside courts. Although DRBs have found support in some quarters of the construction industry, the quantitative assessment of the impact of DRBs has not been adequately addressed. This paper presents the results of a research project undertaken to assess the impact of DRBs on the construction program of a large-scale highway agency. Three dimensions of DRB impact were assessed: (1) influence on project cost and schedule performance, (2) effectiveness of DRBs in preventing and resolving construction disputes, and (3) costs of DRB implementation. The analyses encompass data from approximately 3,000 projects extending over a 10-year period (2000–2009). Quantitative measures of performance were developed and analyzed for each category. Projects that used DRBs faced reduced costs and schedule growth (6.88 and 12.92%, respectively) when compared to non-DRB projects (11.53 and 28.96%). DRBs were also found to be effective in avoiding and settling disputes; the number of arbitration cases reduced consistently after DRB implementation, and DRBs have a success rate of 97% in settling disputes for which DRBs were used. Moreover, costs of DRBs were found to comprise a relatively small fraction (i.e., approximately 0.3%) of total project budgets. It was concluded that DRBs were effective dispute prevention and resolution alternatives with no significant adverse effects on project performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This project was a step forward in developing an extension of the concept of constructability to include the post-occupancy stages of operation and maintenance. This was through an in-depth study of Australian health projects and interviews with professionals in the field. The thesis investigated how the operation and maintenance stakeholders can enter the initial planning, design and construction phases resulting in more efficient and effective delivery of infrastructure projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper investigates the teaching and learning of fractions to Indigenous adult learners in a Civil Construction Certificate Course. More specifically it explores why the use of materials is critical to building knowledge and understanding. This focus is important for two reasons. First, it allows for considerations of a trainer’s approach for teaching fractions and, second it provides insights into how adult learners can be supported with representing their practical experiences of fractions to make generalisation thus building on their knowledge and learning experiences. The paper draws on teaching episodes from an Australian Research Council funded Linkage project that investigates how mathematics is taught and learned in Certificate Courses, here, Certificate 11 in Civil Construction. Action research and decolonising methods (Smith, 1999) were used to conduct the research. Video excerpts which feature one trainer and three students are analysed and described. Findings from the data indicate that adult learners need to be supported with materials to assist with building their capacity to know and apply understandings of fractions in a range of contexts, besides construction. Without materials and where fractions are taught via pen and paper tasks, students are less likely to retain and apply fraction ideas to their Certificate Course. Further they are less likely to understand decimals because of limited understanding of fractions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The construction industry of Hong Kong is experiencing an ageing problem and a labour shortage. To alleviate the shortage of construction workforce, the government has initiatives to assist ethnic minorities to join the construction industry. It is foreseeable that more people from the ethnic minorities will join the construction industry. The safety of workers from the ethnic minorities in construction has attracted growing research interest in many developed countries. Statistics show that workers from the ethnic minorities were nearly 30 percent more likely to have work-related injuries than local workers. However, in Hong Kong, official statistics on the safety of workers from the ethnic minorities are not available. This reflects the racial or ethnic insensitivity of the construction industry in Hong Kong. As the safety of ethnic minorities has not received the attention, this research seeking to contribute to efforts to improve the safety of workers from the ethnic minorities in the construction industry of Hong Kong is all the more urgent. This paper provides an initial report of a research project which focuses on improving the safety of ethnic minority construction workers. Qualitative and quantitative research methods applied in conducting the research are first discussed. Preliminary statistics of construction accidents involving ethnic minority construction workers will then be reported.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Changes in the construction sector are creating opportunities in research to maximise the benefits of those changes and to continue the exciting developments in improved people skills, new processes and developing technologies. Many research centres around the world are investigating aspects of the current changes to drive their particular expertise forward. However, the CIB Integrated Design and Delivery Solutions (IDDS) priority research theme takes a higher-level view of the changes and then focuses down on a prioritised set of research targets. These targets have been investigated, re-focussed and validated over a period of four years through many workshops, conferences and meetings by a wide ranging group of representatives from approximately 90 industry and research organisations. The outcomes of such research, once put into practice should be significantly shortened timespans from conception of need to occupation of new or revised structures. As time is money, the owners will get their investments into productive use sooner, which means a shorter payback time. In addition, there will inevitably be a reduction in construction costs as productivity increases. The improvements in reliable delivery and improved quality currently being seen in relatively simplistic use of Building information Modelling (BIM) (compared to full IDDS) will inevitably continue its on-going trajectory of improvement. We should also consider the wider economic contribution to society that will stem from such improvements and, finally, and by no means unimportantly, the reliable modelling and delivery of sustainability at both the building and estate/ area scale will significantly improve carbon footprints and other sustainable outcomes. Whilst there are huge opportunities for early adopters, the primary risk will be the expansion of the gap between those working in this way and those who are not so advanced or who even refuse to progress . The opportunities to address the significant and widely varying wastes within the structure of the construction sector and within and across projects are huge and timely and industry is encouraged to become involved.