807 resultados para Construction Management, Employees, Job Performance


Relevância:

100.00% 100.00%

Publicador:

Resumo:

A pressing cost issue facing construction is the procurement of off-site pre-manufactured assemblies. In order to encourage Australian adoption of off-site manufacture (OSM), a new approach to underlying processes is required. The advent of object oriented digital models for construction design assumes intelligent use of data. However, the construction production system relies on traditional methods and data sources and is expected to benefit from the application of well-established business process management techniques. The integration of the old and new data sources allows for the development of business process models which, by capturing typical construction processes involving OSM, provides insights into such processes. This integrative approach is the foundation of research into the use of OSM to increase construction productivity in Australia. The purpose of this study is to develop business process models capturing the procurement, resources and information flow of construction projects. For each stage of the construction value chain, a number of sub-processes are identified. Business Process Modelling Notation (BPMN), a mainstream business process modelling standard, is used to create base-line generic construction process models. These models identify OSM decision-making points that could provide cost reductions in procurement workflow and management systems. This paper reports on phase one of an on-going research aiming to develop a proto-type workflow application that can provide semi-automated support to construction processes involving OSM and assist in decision-making in the adoption of OSM thus contributing to a sustainable built environment.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper analyses the profits from 221 construction projects undertaken by an Australian building firm in the period 1910–1938 and examines the factors that influence the firm's profit levels. This involves a series of multiple regression analyses with three dependent variables representing profit and 26 independent variables representing economic conditions and project characteristics. From these, 11 models are derived of which two are chosen as having the best explanatory power in explaining approximately 72% of the variability in profit levels movements. The results show that unemployment, interest rates, level of construction activity in the state, change of wage level, inflation rate of building material and project value significantly influenced the firm's profit level during the period.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A multivariate approach to bidding strategy is presented in comparison with previous standard approaches. An optimal formulation is derived and a method of parameter estimation proposed. A case study illustrates the derivation of optimal and other strategic mark up values against a single bidder. Concluding remarks concern extensions to multiple competitors differing levels of information, and sensitivity analysis.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

While scientists continue to explore the level of climate change impact to new weather patterns and our environment in general, there have been some devastating natural disasters worldwide in the last two decades. Indeed natural disasters are becoming a major concern in our society. Yet in many previous examples, our reconstruction efforts only focused on providing short-term necessities. How to develop resilience in the long run is now a highlight for research and industry practice. This paper introduces a research project aimed at exploring the relationship between resilience building and sustainability in order to identify key factors during reconstruction efforts. From extensive literature study, the authors considered the inherent linkage between the two issues as evidenced from past research. They found that sustainability considerations can improve the level of resilience but are not currently given due attention. Reconstruction efforts need to focus on resilience factors but as part of urban development, they must also respond to the sustainability challenge. Sustainability issues in reconstruction projects need to be amplified, identified, processed, and managed properly. On-going research through empirical study aims to establish critical factors (CFs) for stakeholders in disaster prone areas to plan for and develop new building infrastructure through holistic considerations and balanced approaches to sustainability. A questionnaire survey examined a range of potential factors and the subsequent data analysis revealed six critical factors for sustainable Post Natural Disaster Reconstruction that include: considerable building materials and construction methods, good governance, multilateral coordination, appropriate land-use planning and policies, consideration of different social needs, and balanced combination of long-term and short-term needs. Findings from this study should have an influence on policy development towards Post Natural Disaster Reconstruction and help with the achievement of sustainable objectives.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Two approaches are described, which aid the selection of the most appropriate procurement arrangements for a building project. The first is a multi-attribute technique based on the National Economic Development Office procurement path decision chart. A small study is described in which the utility factors involved were weighted by averaging the scores of five 'experts' for three hypothetical building projects. A concordance analysis is used to provide some evidence of any abnormal data sources. When applied to the study data, one of the experts was seen to be atypical. The second approach is by means of discriminant analysis. This was found to provide reasonably consistent predictions through three discriminant functions. The analysis also showed the quality criteria to have no significant impact on the decision process. Both approaches provided identical and intuitively correct answers in the study described. Some concluding remarks are made on the potential of discriminant analysis for future research and development in procurement selection techniques.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mobile/tower cranes are the most essential forms of construction plant in use in the construction industry but are also the subject of several safety issues. Of these, blind lifting has been found to be one of the most hazardous of crane operations. To improve the situation, a real-time monitoring system that integrates the use of a Global Positioning System (GPS) and Radio Frequency Identification (RFID) is developed. This system aims to identify unauthorized work or entrance of personnel within a pre-defined risk zone by obtaining positioning data of both site workers and the crane. The system alerts to the presence of unauthorized workers within a risk zone——currently defined as 3m from the crane. When this happens, the system suspends the power of the crane and a warning signal is generated to the safety management team. In this way the system assists the safety management team to manage the safety of hundreds of workers simultaneously. An onsite trial with debriefing interviews is presented to illustrate and validate the system in use.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The design-build (DB) delivery system is an effective means of delivering a green construction project and selecting an appropriate contractor is critical to project success. Moreover, the delivery of green buildings requires specific design, construction and operation and maintenance considerations not generally encountered in the procurement of conventional buildings. Specifying clear sustainability requirements to potential contractors is particularly important in achieving sustainable project goals. However, many client/owners either do not explicitly specify sustainability requirements or do so in a prescriptive manner during the project procurement process. This paper investigates the current state-of-the-art procurement process used in specifying the sustainability requirements of the public sector in the USA construction market by means of a robust content analysis of 40 design-build requests for proposals (RFPs). The results of the content analysis indicate that the sustainability requirement is one of the most important dimensions in the best-value evaluation of DB contractors. Client/owners predominantly specify the LEED certification levels (e.g. LEED Certified, Silver, Gold, and Platinum) for a particular facility, and include the sustainability requirements as selection criteria (with specific importance weightings) for contractor evolution. Additionally, larger size projects tend to allocate higher importance weightings to sustainability requirements.This study provides public DB client/owners with a number of practical implications for selecting appropriate design-builders for sustainable DB projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

As the adoption of project financing is gaining momentum, there is a concurrent need of innovation in project financing scheme in order to accelerate infrastructure assets provision in Indonesia. As the largest Muslim population in the world, sharia-compliant financing offers tremendous potential as a source for infrastructure financing for Indonesia. To realize this potential, there is a need of a framework to guide its adoption. Hence this paper discusses the potential implementation of Islamic finance to fund infrastructure projects in Indonesia. Through comparative analysis, this paper illustrates how Islamic principles can be incorporated into Indonesian infrastructure project financing.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this paper is to present a theoretical framework to investigate the relationship between work motivation, organisational commitment and professional commitment in temporary organisations. Through a review of theory, we contend that work motivation has two major patterns — internal motivation (which includes intrinsic, need-based and self-deterministic theories), and external motivation (which includes cognitive or process-based theories of motivation) through which it has been investigated. We also hold the nature of employee commitment to be of three types — affective, continuance and normative. This commitment may be towards either the organisation or the profession. A literature review revealed that the characteristics of the temporary organisation — specifically tenure and task — regulate the relationship between work motivation, organisational commitment and professional commitment. Testable propositions are presented.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Cold-formed steel Lipped Channel Beams (LCB) with web openings are commonly used as floor joists and bearers in building structures. Shear behaviour of these beams is more complicated and their shear capacities are considerably reduced by the presence of web openings. Hence detailed numerical and experimental studies of simply supported LCBs under a mid-span load with aspect ratios of 1.0 and 1.5 were undertaken to investigate the shear behaviour and strength of LCBs with web openings. Experimental and numerical results showed that the current design rules in cold-formed steel structures design codes are very conservative. Improved design equations were therefore proposed for the shear strength of LCBs with web openings based on both experimental and numerical results. This research showed a significant reduction in shear capacities of LCBs when large web openings are included for the purpose of locating building services. A cost effective method of eliminating such detrimental effects of large circular web openings was also therefore investigated using experimental and numerical studies. For this purpose LCBS were reinforced using plate, stud, transverse and sleeve stiffeners with varying sizes and thicknesses that were welded and screw-fastened to the web of LCBs. These studies showed that plate stiffeners were the most suitable. Suitable screw-fastened plate stiffener arrangements with optimum thicknesses were then proposed for LCBs with web openings to restore their original shear capacities. This paper presents the details of finite element analyses and experiments of LCBs with web openings in shear, and the development of improved shear design rules. It then describes the experimental and numerical studies to determine the optimum plate stiffener arrangements and the results. The proposed shear design rules in this paper can be considered for inclusion in the future versions of cold-formed steel design codes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study addresses the research question: ‘What are the diffusion determinants for extreme weather-proofing technology in the Australian built environment?’ In order to effectively identify diffusion determinants, a synthesis of literature in both technical and management fields was conducted from a system-wide perspective. Review results where then interpreted through an innovation system framework, drawn from innovation systems literature, in order to map the current state of extreme weather-proofing technology diffusion in the Australian built environment industry. Drivers and obstacles to optimal diffusion are presented. Results show the important role to be played by Australian governments in facilitating improved weather proofing technology diffusion. This applies to governments in their various roles, but particularly as regulators, clients/owners and investors in research & development and education. In the role as regulators, findings suggest Australian governments should be encouraging the application of innovative finance options and positive end-user incentives to promote the uptake of weather proofing technology. Additionally, in their role as clients/owners, diffusion can be improved by adjusting building and infrastructure specifications to encourage designers and constructors to incorporate extreme weather proofing technology in new and redeveloped built assets. Finally, results suggest greater investment is required in research and development and improved knowledge sharing across the construction supply chain to further mitigate risks associated with greater incidences of extreme weather events.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Natural disasters can have adverse effect on human lives. To raise the awareness of research and better combat future events, it is important to identify recent research trends in the area of post disaster reconstruction (PDR). The authors used a three-round literature review strategy to study journal papers published in the last decade that are related to PDR with specific conditions using the Scopus search engine. A wide range of PDR related papers from a general perspective was examined in the first two rounds while the final round established 88 papers as target publications through visual examination of the abstracts, keywords and as necessary, main texts. These papers were analysed in terms of research origins, active researchers, research organisations, most cited papers, regional concerns, major themes and deliverables, for clues of the past trends and future directions. The need for appropriate PDR research is increasingly recognised. The publication number multiplied 5 times from 2002 to 2012. For PDR research with a construction perspective, the increase is sixfold. Developing countries such as those in Asia attract almost 50% researchers' attention for regional concerns while the US is the single most concentrated (24%) country. Africa is hardly represented. Researchers in developed countries lead in worldwide PDR research. This contrasts to the need for expertise in developing countries. Past works focused on waste management, stakeholder analysis, resourcing, infrastructure issue, resilience and vulnerability, reconstruction approach, sustainable reconstruction and governance issues. Future research should respond to resourcing, integrated development, sustainability and resilience building to cover the gaps. By means of a holistic summary and structured analysis of key patterns, the authors hope to provide a streamlined access to existing research findings and make predictions of future trends. They also hope to encourage a more holistic approach to PDR research and international collaborations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Human and ecosystem health impacts imposed by water pollution are a major problem in the urban areas of Sri Lanka. A primary source of pollutants to urban water sources is atmospheric particles. Hence, it is important to develop a detailed understanding of atmospheric particle characteristics, their sources of origin and the transport pathways. Several research studies have been conducted in Sri Lanka on atmospheric pollution and these studies have tended to differ in their scope, study region and the investigated pollutants. The objectives of this paper are: (1) to report the outcomes of a detailed state-of-art literature review of atmospheric pollution related studies in Sri Lanka to understand the current trends and (2) to discuss the future research activities necessary to generate the important knowledge required for the development of effective strategies to control the adverse impacts of atmospheric pollution on urban waterways.