962 resultados para CONSENSUS DEVELOPMENT PROJECT
Resumo:
Culverts are common means to convey flow through the roadway system for small streams. In general, larger flows and road embankment heights entail the use of multibarrel culverts (a.k.a. multi-box) culverts. Box culverts are generally designed to handle events with a 50-year return period, and therefore convey considerably lower flows much of the time. While there are no issues with conveying high flows, many multi-box culverts in Iowa pose a significant problem related to sedimentation. The highly erosive Iowa soils can easily lead to the situation that some of the barrels can silt-in early after their construction, becoming partially filled with sediment in few years. Silting can reduce considerably the capacity of the culvert to handle larger flow events. Phase I of this Iowa Highway Research Board project (TR-545) led to an innovative solution for preventing sedimentation. The solution was comprehensively investigated through laboratory experiments and numerical modeling aimed at screening design alternatives and testing their hydraulic and sediment conveyance performance. Following this study phase, the Technical Advisory Committee suggested to implement the recommended sediment mitigation design to a field site. The site selected for implementation was a 3-box culvert crossing Willow Creek on IA Hwy 1W in Iowa City. The culvert was constructed in 1981 and the first cleanup was needed in 2000. Phase II of the TR 545 entailed the monitoring of the site with and without the selfcleaning sedimentation structure in place (similarly with the study conducted in laboratory). The first monitoring stage (Sept 2010 to December 2012) was aimed at providing a baseline for the operation of the as-designed culvert. In order to support Phase II research, a cleanup of the IA Hwy 1W culvert was conducted in September 2011. Subsequently, a monitoring program was initiated to document the sedimentation produced by individual and multiple storms propagating through the culvert. The first two years of monitoring showed inception of the sedimentation in the first spring following the cleanup. Sedimentation continued to increase throughout the monitoring program following the depositional patterns observed in the laboratory tests and those documented in the pre-cleaning surveys. The second part of Phase II of the study was aimed at monitoring the constructed self-cleaning structure. Since its construction in December 2012, the culvert site was continuously monitored through systematic observations. The evidence garnered in this phase of the study demonstrates the good performance of the self-cleaning structure in mitigating the sediment deposition at culverts. Besides their beneficial role in sediment mitigation, the designed self-cleaning structures maintain a clean and clear area upstream the culvert, keep a healthy flow through the central barrel offering hydraulic and aquatic habitat similar with that in the undisturbed stream reaches upstream and downstream the culvert. It can be concluded that the proposed self-cleaning structural solution “streamlines” the area upstream the culvert in a way that secures the safety of the culvert structure at high flows while producing much less disturbance in the stream behavior compared with the current constructive approaches.
Resumo:
ISU’s proposed research will (1) develop methods for designing clean and efficient burners for low‐Btu producer gas and medium‐Btu syngas, (2) develop catalysts and flow reactors to produce ethanol from medium‐Btu synthesis gas, and (3) upgrade the BECON gasifier system to enable medium‐Btu syngas production and greatly enhanced capabilities for detailed gas analysis needed by both (1) and (2). This project addresses core development needs to enable grain ethanol industry reduce its natural gas demand and ultimately transition to cellulosic ethanol production.
Resumo:
Arising from either retrotransposition or genomic duplication of functional genes, pseudogenes are "genomic fossils" valuable for exploring the dynamics and evolution of genes and genomes. Pseudogene identification is an important problem in computational genomics, and is also critical for obtaining an accurate picture of a genome's structure and function. However, no consensus computational scheme for defining and detecting pseudogenes has been developed thus far. As part of the ENCyclopedia Of DNA Elements (ENCODE) project, we have compared several distinct pseudogene annotation strategies and found that different approaches and parameters often resulted in rather distinct sets of pseudogenes. We subsequently developed a consensus approach for annotating pseudogenes (derived from protein coding genes) in the ENCODE regions, resulting in 201 pseudogenes, two-thirds of which originated from retrotransposition. A survey of orthologs for these pseudogenes in 28 vertebrate genomes showed that a significant fraction ( approximately 80%) of the processed pseudogenes are primate-specific sequences, highlighting the increasing retrotransposition activity in primates. Analysis of sequence conservation and variation also demonstrated that most pseudogenes evolve neutrally, and processed pseudogenes appear to have lost their coding potential immediately or soon after their emergence. In order to explore the functional implication of pseudogene prevalence, we have extensively examined the transcriptional activity of the ENCODE pseudogenes. We performed systematic series of pseudogene-specific RACE analyses. These, together with complementary evidence derived from tiling microarrays and high throughput sequencing, demonstrated that at least a fifth of the 201 pseudogenes are transcribed in one or more cell lines or tissues.
Resumo:
Snow and ice removal on public streets is a critical part of the work of departments of transportation in northern U.S. states, including Iowa. Iowa is also a state rich in agricultural resources, some of which undergo industrial processes that generate a number of byproducts, e.g., in converting corn to ethanol or soy to biodiesel. It would be desirable to find those that, with a minimum of additional processing, can be used as a deicing compound, either alone or in combination with products currently in use. The focus of this work is therefore to investigate by-products from agricultural processes that may be suitable for use as deicing applications. This topic has been investigated in the past by others, with many patented products described in the literature. An initial screening was carried out to assess the potential acceptability of selected commercial products, as well as a glycerol developed for this project. Based on the variety of parameters tested, the product combination that shows the greatest promise for future application consists of 80% glycerol with 20% NaCl.
Resumo:
This research project was directed at laboratory and field evaluation of sodium montmorillonite clay (bentonite) as a dust palliative for limestone surfaced secondary roads. It had been postulated that the electrically charged surfaces of the clay particles could interact with the charged surfaces of the limestone and act as a bonding agent to agglomerate fine (-#200) particulates and also to band the fine particulates to larger (+#200) limestone particles. Laboratory testing using soda ash dispersed bentonite treatment of limestone fines indicated significant improvement of compressive strength and slaking characteristics. It was recommended that the project proceed to field trials and test roads were constructed in Dallas and Adair counties in Iowa. Soda ash dispersed bentonite solutions can be field mixed and applied with conventional spray distribution equipment. A maximum of 1.5% bentonite(by weight of aggregate)can be applied at one time. Higher applications would have to be staged allowing the excess moisture to evaporate between applications. Construction of higher application treatments can be accomplished by adding dry bentonite to the surfacing material and then by dry road mixing. The soda ash water solution can then be spray applied and the treated surfacing material wet mixed by motor graders to a consistency of 3 to 4 inch slump concrete. Two motor graders working in tandem can provide rapid mixing for both methods of construction. Calcium and magnesium chloride treatments are 2 to 3 times more effective in dust reduction in the short term (3-4 months) but are prone to washboarding and potholing due to maintenance restrictions. Bentonite treatment at the 2-3% level is estimated to provide a 30-40% dust reduction over the long term(18-24 months). Normal maintenance blading operations can be used on bentonite treated areas. Vehicle braking characteristics are not adversely affected up to the 3.0% treatment level. The bentonite appears to be functioning as a banding agent to bind small particulates to larger particles and is acting to agglomerate fine particles of limestone. This bonding capability appears recoverable from environmental effects of winter, and from alternating wet and dry periods. The bentonite appears to be able to interact with new applications of limestone maintenance material and maintains a dust reduction capability. Soda ash dispersed bentonite treatment is approximately 10 times more cost effective per percent dust reduction than conventional chloride treatments with respect to time. However,the disadvantage is that there is not the initial dramatic reduction in dust generation as with the chloride treatment. Although dust is reduced 30-40% after treatment there is still dust being generated and the traveling public or residents may not perceive the reduction.
Resumo:
This report describes a new approach to the problem of scheduling highway construction type projects. The technique can accurately model linear activities and identify the controlling activity path on a linear schedule. Current scheduling practices are unable to accomplish these two tasks with any accuracy for linear activities, leaving planners and manager suspicious of the information they provide. Basic linear scheduling is not a new technique, and many attempts have been made to apply it to various types of work in the past. However, the technique has never been widely used because of the lack of an analytical approach to activity relationships and development of an analytical approach to determining controlling activities. The Linear Scheduling Model (LSM) developed in this report, completes the linear scheduling technique by adding to linear scheduling all of the analytical capabilities, including computer applications, present in CPM scheduling today. The LSM has tremendous potential, and will likely have a significant impact on the way linear construction is scheduled in the future.
Resumo:
The Iowa Department of Transportation (IDOT) has been requiring Critical Path Method (CPM) schedules on some larger or more schedule sensitive projects. The Office of Construction's expectations for enhanced project control and improved communication of project objectives have not been fully met by the use of CPM. Recognizing that the current procedures might not be adequate for all projects, IDOT sponsored a research project to explore the state-of-the-art in transportation scheduling and identify opportunities for improvement. The first phase of this project identified a technique known as the Linear Scheduling Method (LSM) as an alternative to CPM on certain highway construction projects. LSM graphically displays the construction process with respect to the location and the time in which each activity occurs. The current phase of this project was implemented to allow the research team the opportunity to evaluate LSM on all small groups of diverse projects. Unlike the first phase of the project, the research team was closely involved in the project from early in the planning phase throughout the completion of the projects. The research strongly suggests that the linear scheduling technique has great potential as a project management tool for both contractors and IDOT personnel. However, before this technique can become a viable weapon in the project management arsenal, a software application needs to be developed. This application should bring to linear scheduling a degree of functionality as rich and as comprehensive as that found in microcomputer based CPM software on the market today. The research team recommends that the IDOT extend this research effort to include the development of a linear scheduling application.
Resumo:
This report describes the continuation of the development of performance measures for the Iowa Department of Transportation (DOT) Offices of Construction. Those offices are responsible for administering transportation construction projects for the Iowa DOT. Researchers worked closely with the Benchmark Steering Team which was formed during Phase I of this project and is composed of representatives of the Offices of Construction. The research team conducted a second survey of Offices of Construction personnel, interviewed numerous members of the Offices and continued to work to improve the eight key processes identified during Phase I of this research. The eight key processes include Inspection of Work, Resolution of Technical Issues, Documentation of Work Progress and Pay Quantities, Employee Training and Development, Continuous Feedback for Improved Contract Documents, Provide Safe Traffic Control, External/Public Communication, and Providing Pre-Letting Information. Three to four measurements were specified for each key process. Many of these measurements required opinion surveys of employees, contractors, and others. During Phase II, researchers concentrated on conducting surveys, interviewing respondents to improve future surveys, and facilitating Benchmark Steering Team monthly meetings. Much effort was placed on using the information collected during the first year's research to improve the effectiveness and efficiency of the Offices of Construction. The results from Process Improvement Teams that studied Traffic Control and Resolution of Technical Issues were used to improve operations.
Resumo:
There is nothing as amazing and fascinating as children learning process. Between 0 and 6 years old, a child brain develops in a waythat will never be repeated. At this age, children are eager to discover and they have great potential of active and affective life.Because of this, their learning capacity in this period is incalculable. (Jordan-Decarbo y Nelson, 2002; Wild, 1999).Pre-school Education is a unique and special stage, with self identity, which aims are:attending children as a whole,motivate them to learn,give them an affective and stable environment in which they can grow up and get to be balanced and confident people and inwhich they can relate to others, learn, enjoy and be happy.Arts, Music, Visual Arts and Drama (Gardner, 1994) can provide a framework of special, even unique, personal expression.With the aim of introducing qualitative improvements in the education of children and to ensure their emotional wellbeing, and havingnoticed that teachers had important needs and concerns as regards to diversity in their student groups, we developed a programbased on the detection of needs and concerns explained by professionals in education.This program of Grupo edebé, object of our research, is a multicultural, interdisciplinary and globalizing project the aims of which are:developing children's talent and personality,keeping their imagination and creativity and using these as a learning resource,promoting reasoning, favouring expression and communication,providing children with the tools to manage their emotions,and especially, introducing Arts as a procedure to increase learning.We wanted to start the research by studying the impact (Brice, 2003) that this last point had on the learning of five-year-old childrenschooled in multicultural environments.Therefore, the main goal of the research was the assessment of the implementation of a child education programme attending todiversity in a population of five-year-old children, specifically in the practice of procedures based on the use of Arts (music, arts andcrafts and theatre) as a vehicle or procedure for learning contents in Pre-school stage.Because children emotional welfare was a subject of our concern, and bearing in mind that the affective aspects are of vitalimportance for learning and child development (Parke and Gauvain, 2009), Grupo Edebé has also evaluated the starting, evolving andfinal impact in five-year-old children given that they finish Pre-school education at that age.
Resumo:
This paper presents a pilot project to reinforce participatory practices in standardization. The INTERNORM project creates an interactive knowledge center based on the sharing of academic skills and experiences accumulated by the civil society, especially consumer associations, environmental associations and trade unions to strengthen the participatory process of standardization. The first objective of the project is action-oriented: INTERNORM provides a common knowledge pool supporting the participation of civil society actors to international standard-setting activities by bringing them together with academic experts in working groups and providing logistic and financial support to their participation in meetings of national and international technical committees. The second objective is analytical: the standardization action provides a research field for a better understanding of the participatory dynamics underpinning international standardization. This paper presents three incentives that explain civil society (non-)involvement in standardization that overcome conventional resource-based hypotheses: an operational incentive related to the use of standards in the selective goods provided by associations to their membership; a thematic incentive provided by the setting of priorities by strategic committees created in some standardization organization; and a rhetorical incentive related to the discursive resource that civil society concerns offers to the different stakeholders.
Resumo:
The National Center of Competence in Research project "SYNAPSY" aims at identifying certain mechanisms of psychiatric and cognitive disorders, in order to improve the understanding and the genesis of such pathologies, and to promote the development of better diagnostic tools and of new therapeutic approaches. It provides an excellent opportunity for clinical psychiatrists and neuroscientists to develop a synergic mode of collaboration. On the basis of questions stemming from clinical practice and in the frame of patients cohorts, various research projects in neuroscience should lead to progresses that may have a considerable impact on clinical practice.
Resumo:
The findings in this summary are based on the Iowa Barriers to Prenatal Care project. Ongoing since 1991, the purpose of this project is to obtain brief, accurate information about women delivering babies in Iowa hospitals. Specifically, the project seeks to learn about women’s experiences getting prenatal or delivery care during their current pregnancy. Other information is included which may be pertinent to health planners or those concerned with the systematic development of health care services. This project is a cooperative venture of all of Iowa’s maternity hospitals, the University of Northern Iowa Center for Social and Behavioral Research, and the Iowa Department of Public Health. The Robert Wood Johnson Foundation funded the first three years of this project. The current funding is provided by the Iowa Department of Public Health. The Director is Dr. Mary Losch, University of Northern Iowa Center for Social and Behavioral Research. The Coordinator for the project is Rodney Muilenburg. The questionnaire is distributed to nearly ninety maternity hospitals across the state of Iowa. Nursing staff or those responsible for obtaining birth certificate information in the obstetrics unit are responsible for approaching all birth mothers prior to dismissal and requesting their participation in the study. The questionnaire takes approximately ten minutes to complete. Completed questionnaires are returned to the University of Northern Iowa Center for Social and Behavioral Research for data entry and analysis. Returns are made monthly, weekly, or biweekly depending on the number of births per week in a given hospital. Except in the case of a mother who is too ill to complete the questionnaire, all mothers are eligible to be recruited for participation. The present yearly report includes an analysis of large Iowa cities, African American mothers, and a trend analysis of the last ten years. Also presented in this report is a frequency analysis of all variables included in the 2012 questionnaire. Unless otherwise noted, all entries reflect percentages. Please note that because percentages were rounded, total values may not equal 100%. Data presented are based upon 2012 questionnaires received to date (n = 23,674). All analyses reflect unweighted percentages of those responding.
Resumo:
OBJECTIVES: In 2002, the canton of Fribourg, Switzerland, implemented a coordinated pharmaceutical care service in nursing homes to promote rational drug use. In the context of this service, a project was conducted to develop recommendations for the pharmacological management of behavioral and psychological symptoms of dementia (BPSD) in nursing home residents. DESIGN AND METHODS: Selected evidence-based guidelines and meta-analysis sources related to the management of depression, insomnia, and agitation in dementia patients were systematically searched and evaluated. Evidence and controversies regarding the pharmacological treatment of the most common BPSD symptoms were reviewed, and treatment algorithms were developed. RESULTS: Ten evidence-based guidelines and meta-analyses for BPSD management were identified, with none specifically addressing issues related to nursing home residents. Based on this literature, recommendations were developed for the practice of pharmacological management of depression, sleep disturbances, and agitation in nursing home residents. For depression, SSRIs are considered the first choice if an antidepressant is required. No clear evidence has been found for sleep disturbances; the underlying conditions need to be investigated closely before the introduction of any drug therapy. Many drugs have been investigated for the treatment of agitation, and if necessary, antipsychotics could be used, although they have significant side effects. Several areas of uncertainty were identified, such as the current controversy about typical and atypical antipsychotic use or the appropriateness of cholinesterase inhibitors for controlling agitation. Treatment algorithms were presented to general practitioners, pharmacists, and medical directors of nursing homes in the canton of Fribourg, and will now be implemented progressively, using educational sessions, pharmaceutical counseling, and monitoring. CONCLUSION: Based on existing evidence-based studies, recommendations were developed for the practice of pharmacological management of depression, sleep disturbances, and agitation in nursing home residents. It should be further studied whether these algorithms implemented through pharmaceutical care services will improve psychotropic drug prescriptions and prevent drug-related problems in nursing home residents
Resumo:
In coordination with a Technical Advisory Committee (TAC) consisting of County Engineers and Iowa DOT representatives, the Iowa DOT has proposed to develop a set of standards for a single span prefabricated bridge system for use on the local road system. The purpose of the bridge system is to improve bridge construction, accelerate project delivery, improve worker safety, be cost effective, reduce impacts to the travelling public by reducing traffic disruptions and the duration of detours, and allow local forces to construct the bridges. HDR Inc. was selected by the Iowa DOT to perform the initial concept screening of the bridge system. This Final Report summarizes the initial conceptual effort to investigate potential systems, make recommendations for a preferred system and propose initial details to be tested in the laboratory in Phase 2 of the project. The prefabricated bridge components were to be based on the following preliminary criteria set forth by the TAC. The criteria were to be verified and/ or modified as part of the conceptual development. - 24’ and 30’ roadway widths - Skews of 0o, 15o, and 30o - Span lengths of 30’ – 70’ in 10’ increments using precast concrete beams - Voided box beams could be considered - Limit precast element weight to 45,000 pounds for movement and placement of beams - Beams could be joined transversely with threaded rods - Abutment concepts may included precast as well as an option for cast-in-place abutments with pile foundations In addition to the above criteria, there was an interest to use a single-width prefabricated bridge component to simplify fabrication as well as a desire to utilize non-prestressed concrete systems where possible to allow for precasting of the beam modules by local forces or local precast plants. The SL-1 modular steel bridge rail was identified for use with this single span prefabricated bridge system.
Resumo:
Research Project HR-124, "Development of a Laboratory Durability Test for Asphalts," was initiated in 1966 as a long-range comprehensive program. Its ultimate objective was to develop a simple, rapid laboratory test that could be used by highway engineers to select paving asphalt according to quality, to identify inferior asphalts, and to reasonably predict the useful life of asphalts once they were incorporated in the pavements.