344 resultados para upgrade
Resumo:
Global awareness for cleaner and renewable energy is transforming the electricity sector at many levels. New technologies are being increasingly integrated into the electricity grid at high, medium and low voltage levels, new taxes on carbon emissions are being introduced and individuals can now produce electricity, mainly through rooftop photovoltaic (PV) systems. While leading to improvements, these changes also introduce challenges, and a question that often rises is ‘how can we manage this constantly evolving grid?’ The Queensland Government and Ergon Energy, one of the two Queensland distribution companies, have partnered with some Australian and German universities on a project to answer this question in a holistic manner. The project investigates the impact the integration of renewables and other new technologies has on the physical structure of the grid, and how this evolving system can be managed in a sustainable and economical manner. To aid understanding of what the future might bring, a software platform has been developed that integrates two modelling techniques: agent-based modelling (ABM) to capture the characteristics of the different system units accurately and dynamically, and particle swarm optimization (PSO) to find the most economical mix of network extension and integration of distributed generation over long periods of time. Using data from Ergon Energy, two types of networks (3 phase, and Single Wired Earth Return or SWER) have been modelled; three-phase networks are usually used in dense networks such as urban areas, while SWER networks are widely used in rural Queensland. Simulations can be performed on these networks to identify the required upgrades, following a three-step process: a) what is already in place and how it performs under current and future loads, b) what can be done to manage it and plan the future grid and c) how these upgrades/new installations will perform over time. The number of small-scale distributed generators, e.g. PV and battery, is now sufficient (and expected to increase) to impact the operation of the grid, which in turn needs to be considered by the distribution network manager when planning for upgrades and/or installations to stay within regulatory limits. Different scenarios can be simulated, with different levels of distributed generation, in-place as well as expected, so that a large number of options can be assessed (Step a). Once the location, sizing and timing of assets upgrade and/or installation are found using optimisation techniques (Step b), it is possible to assess the adequacy of their daily performance using agent-based modelling (Step c). One distinguishing feature of this software is that it is possible to analyse a whole area at once, while still having a tailored solution for each of the sub-areas. To illustrate this, using the impact of battery and PV can have on the two types of networks mentioned above, three design conditions can be identified (amongst others): · Urban conditions o Feeders that have a low take-up of solar generators, may benefit from adding solar panels o Feeders that need voltage support at specific times, may be assisted by installing batteries · Rural conditions - SWER network o Feeders that need voltage support as well as peak lopping may benefit from both battery and solar panel installations. This small example demonstrates that no single solution can be applied across all three areas, and there is a need to be selective in which one is applied to each branch of the network. This is currently the function of the engineer who can define various scenarios against a configuration, test them and iterate towards an appropriate solution. Future work will focus on increasing the level of automation in identifying areas where particular solutions are applicable.
Resumo:
Electric Energy Storage (EES) is considered as one of the promising options for reducing the need for costly upgrades in distribution networks in Queensland (QLD). However, It is expected, the full potential for storage for distribution upgrade deferral cannot be fully realized due to high cost of EES. On the other hand, EES used for distribution deferral application can support a variety of complementary storage applications such as energy price arbitrage, time of use (TOU) energy cost reduction, wholesale electricity market ancillary services, and transmission upgrade deferral. Aggregation of benefits of these complementary storage applications would have the potential for increasing the amount of EES that may be financially attractive to defer distribution network augmentation in QLD. In this context, this paper analyzes distribution upgrade deferral, energy price arbitrage, TOU energy cost reduction, and integrated solar PV-storage benefits of EES devices in QLD.
Resumo:
Electricity network investment and asset management require accurate estimation of future demand in energy consumption within specified service areas. For this purpose, simple models are typically developed to predict future trends in electricity consumption using various methods and assumptions. This paper presents a statistical model to predict electricity consumption in the residential sector at the Census Collection District (CCD) level over the state of New South Wales, Australia, based on spatial building and household characteristics. Residential household demographic and building data from the Australian Bureau of Statistics (ABS) and actual electricity consumption data from electricity companies are merged for 74 % of the 12,000 CCDs in the state. Eighty percent of the merged dataset is randomly set aside to establish the model using regression analysis, and the remaining 20 % is used to independently test the accuracy of model prediction against actual consumption. In 90 % of the cases, the predicted consumption is shown to be within 5 kWh per dwelling per day from actual values, with an overall state accuracy of -1.15 %. Given a future scenario with a shift in climate zone and a growth in population, the model is used to identify the geographical or service areas that are most likely to have increased electricity consumption. Such geographical representation can be of great benefit when assessing alternatives to the centralised generation of energy; having such a model gives a quantifiable method to selecting the 'most' appropriate system when a review or upgrade of the network infrastructure is required.
Resumo:
Level crossing risk continues to be a significant safety concern for the security of rail operations around the world. Over the last decade or so, a third of railway related fatalities occurred as a direct result of collisions between road and rail vehicles in Australia. Importantly, nearly half of these collisions occurred at railway level crossings with no active protection, such as flashing lights or boom barriers. Current practice is to upgrade level crossings that have no active protection. However, the total number of level crossings found across Australia exceed 23,500, and targeting the proportion of these that are considered high risk (e.g. public crossings with passive controls) would cost in excess of AU$3.25 billion based on equipment, installation and commissioning costs of warning devices that are currently type approved. Level crossing warning devices that are low-cost provide a potentially effective control for reducing risk; however, over the last decade, there have been significant barriers and legal issues in both Australia and the US that have foreshadowed their adoption. These devices are designed to have significantly lower lifecycle costs compared with traditional warning devices. They often make use of use of alternative technologies for train detection, wireless connectivity and solar energy supply. This paper describes the barriers that have been encountered for the adoption of these devices in Australia, including the challenges associated with: (1) determining requisite safety levels for such devices; (2) legal issues relating to duty of care obligations of railway operators; and (3) issues of Tort liability around the use of less than fail-safe equipment. This paper provides an overview of a comprehensive safety justification that was developed as part of a project funded by a collaborative rail research initiative established by the Australian government, and describes the conceptual framework and processes being used to justify its adoption. The paper provides a summary of key points from peer review and discusses prospective barriers that may need to be overcome for future adoption. A successful outcome from this process would result in the development of a guideline for decision-making, providing a precedence for adopting low-cost level crossing warning devices in other parts of the world. The framework described in this paper also provides relevance to the review and adoption of analogous technologies in rail and other safety critical industries.
Resumo:
Effluent from sewage treatment plants has been associated with a range of pollutant effects. Depending on the influent composition and treatment processes the effluent may contain a myriad of different chemicals which makes monitoring very complex. In this study we aimed to monitor relatively polar organic pollutant mixtures using a combination of passive sampling techniques and a set of biochemistry based assays covering acute bacterial toxicity (Microtox™), phytotoxicity (Max-I-PAM assay) and genotoxicity (umuC assay). The study showed that all of the assays were able to detect effects in the samples and allowed a comparison of the two plants as well as a comparison between the two sampling periods. Distinct improvements in water quality were observed in one of the plants as result of an upgrade to a UV disinfection system, which improved from 24× sample enrichment required to induce a 50% response in the Microtox™ assay to 84×, from 30× sample enrichment to induce a 50% reduction in photosynthetic yield to 125×, and the genotoxicity observed in the first sampling period was eliminated. Thus we propose that biochemical assay techniques in combination with time integrated passive sampling can substantially contribute to the monitoring of polar organic toxicants in STP effluents.
Resumo:
Spanning over a considerable length of time, facility management is a key phase in the development cycle of built assets. Therefore facility managers are in a commanding position to maximise the potential of sustainability through the operation, maintenance and upgrade of built facilities leading to decommission and deconstruction. Sustainability endeavours in facility management practices will not only contribute to reducing energy consumption, waste and running costs, but also help improve organisational productivity, financial returns and community standing of the organisation. At the forefront facing sustainability challenge, facility manager should be empowered with the necessary knowledge and capabilities. However, literature studies show a gap between the current level of awareness and the specific knowledge and necessary skills required to pursue sustainability in the profession. People capability is considered as the key enabler in managing the sustainability agenda as well as being central to the improvement of competency and innovation in an organization. This paper aims to identify the critical factors for enhancing people capabilities in promoting the sustainability agenda in facility management practices. Starting with a total of 60 factors identified through literature review, the authors conducted a questionnaire survey to assess the perceived importance of these factors. The findings reveal 23 critical factors as significantly important. They form the basis of a mechanism framework developed to equip facility managers with the right knowledge, to continue education and training and to develop new mind-sets to enhance the implementation of sustainability measures in FM practices.
Resumo:
Road collisions negatively affect the lives of hundreds of Canadians per year. Unfortunately, safety has been typically neglected from management systems. It is common to find that a great deal of effort has been devoted to develop and implement systems capable of achieving and sustaining good levels of condition. It is relatively recent that road safety has become an important objective. Managing a network of roads is not an easy task; it requires long, medium and short term plans to maintain, rehabilitate and upgrade aging assets, reduce and mitigate accident exposure, likelihood and severity. This thesis presents a basis for incorporating road safety into road management systems; two case studies were developed; one limited by available data and another from sufficient information. A long term analysis was used to allocate improvements for condition and safety of roads and bridges, at the network level. It was confirmed that a safety index could be used to obtain a first cut model; meanwhile potential for improvement which is a difference between observed and predicted number of accidents was capable of capturing the degree of safety of individual segments. It was found that the completeness of the system resulted in savings because of the economies obtained from trade-off optimization. It was observed that safety improvements were allocated at the beginning of the analysis in order to reduce the extent of issues, which translated into a systematic reduction of potential for improvement up to a point of near constant levels, which were hypothesized to relate to those unavoidable collisions from human error or vehicle failure.
Resumo:
The heavy haul rail network in Queensland Australia generally adopts a lightning impulse withstand voltage rating of 250 kV for the switchgear and autotransformers within its 50 kV ac traction feeder stations. The aging switchgear across a number of feeder stations in this network are undergoing upgrade and the rail network operator is considering the possibility of using 200 kV rating for the upgraded switchgear. This paper investigates the lightning over-voltages that could occur at the feeder stations under review. Fast front transient models of the feeder stations and the associated traction corridors are developed in PSCAD/EMTDC software. Simulations are conducted to evaluate the likely over-voltages under various scenarios and the results are presented. Finally, the required lightning impulse withstand voltage rating for the switchgear is determined based on the simulation results.
Resumo:
The worldwide installed base of enterprise resource planning (ERP) systems has increased rapidly over the past 10 years now comprising tens of thousands of installations in large- and medium-sized organizations and millions of licensed users. Similar to traditional information systems (IS), ERP systems must be maintained and upgraded. It is therefore not surprising that ERP maintenance activities have become the largest budget provision in the IS departments of many ERP-using organizations. Yet, there has been limited study of ERP maintenance activities. Are they simply instances of traditional software maintenance activities to which traditional software maintenance research findings can be generalized? Or are they fundamentally different, such that new research, specific to ERP maintenance, is required to help alleviate the ERP maintenance burden? This paper reports a case study of a large organization that implemented ERP (an SAP system) more than three years ago. From the case study and data collected, we observe the following distinctions of ERP maintenance: (1) the ERP-using organization, in addition to addressing internally originated change-requests, also implements maintenance introduced by the vendor; (2) requests for user-support concerning the ERP system behavior, function and training constitute a main part of ERP maintenance activity; and (3) similar to the in-house software environment, enhancement is the major maintenance activity in the ERP environment, encompassing almost 64% of the total change-request effort. In light of these and other findings, we ultimately: (1) propose a clear and precise definition of ERP maintenance; (2) conclude that ERP maintenance cannot be sufficiently described by existing software maintenance taxonomies; and (3) propose a benefits-oriented taxonomy, that better represents ERP maintenance activities. Three salient dimensions (for characterizing requests) incorporated in the proposed ERP maintenance taxonomy are: (1) who is the maintenance source? (2) why is it important to service the request? and (3) what––whether there is any impact of implementing the request on the installed module(s)?
Resumo:
Overview The incidence of skin tears, pressure injuries and chronic wounds increases with age [1-4] and therefore is a serious issue for staff and residents in Residential Aged Care Facilities (RACFs). A pilot project funded in Round 2 of the Encouraging Best Practice in Residential Aged Care (EBPRAC) program by the then Australian Government Department of Health and Ageing found that a substantial proportion of residents in aged care facilities experienced pressure injuries, skin tears or chronic wounds. It also found the implementation of the evidence based Champions for Skin Integrity (CSI) model of wound care was successful in significantly decreasing the prevalence and severity of wounds in residents, improving staff skills and knowledge of evidence based wound management, increasing staff confidence with wound management, increasing implementation of evidence based wound management and prevention strategies, and increasing staff awareness of their roles in evidence based wound care at all levels [5]. Importantly, during the project, the project team developed a resource kit on evidence based wound management. Two critical recommendations resulting from the project were that: - The CSI model or a similar strategic approach should be implemented in RACFs to facilitate the uptake of evidence based wound management and prevention - The resource kit on evidence based wound management should be made available to all Residential Aged Care Facilities and interested parties A proposal to disseminate or rollout the CSI model of wound care to all RACFs across Australia was submitted to the department in 2012. The department approved funding from the Aged Care Services Improvement Healthy Ageing Grant (ACSIHAG) at the same time as the Round 3 of the Encouraging Better Practice in Aged Care (EBPAC) program. The dissemination involved two crucial elements: 1. The updating, refining and distribution of a Champions for Skin Integrity Resource Kit, more commonly known as a CSI Resource Kit and 2. The presentation of intensive one day Promoting Healthy Skin “Train the Trainer” workshops in all capital cities and major regional towns across Australia Due to demand, the department agreed to fund a second round of workshops focussing on regional centres and the completion date was extended to accommodate the workshops. Later, the department also decided to host a departmental website for a number of clinical domains, including wound management, so that staff from the residential aged care sector had easy access to a central repository of helpful clinical resource material that could be used for improving the health and wellbeing of their older adults, consumers and carers. CSI Resource Kit Upgrade and Distribution: At the start of the project, a full evidence review was carried out on the material produced during the EBPRAC-CSI Stage 1 project and the relevant evidence based changes were made to the documentation. At the same time participants in the EBPRAC-CSI Stage 1 project were interviewed for advice on how to improve the resource material. Following this the documentation, included in the kit, was sent to independent experts for peer review. When this process was finalised, a learning designer and QUT’s Visual Communications Services were engaged to completely refine and update the design of the resources, and combined resource kit with the goal of keeping the overall size of the kit suitable for bookshelf mounting and the cost at reasonable levels. Both goals were achieved in that the kit is about the same size as a 25 mm A4 binder and costs between $19.00 and $28.00 per kit depending on the size of the print run. The dissemination of the updated CSI resource kit was an outstanding success. Demand for the kits was so great that a second print run of 2,000 kits was arranged on top of the initial print run of 4,000 kits. All RACFs across Australia were issued with a kit, some 2,740 in total. Since the initial distribution another 1,100 requests for kits has been fulfilled as well as 1,619 kits being distributed to participants at the Promoting Healthy Skin workshops. As the project was winding up a final request email was sent to all workshop participants asking if they required additional kits or resources to distribute the remaining kits and resources. This has resulted in requests for 200 additional kits and resources. Feedback from the residential aged care sector and other clinical providers who have interest in wound care has been very positive regarding the utility of the kit, (see Appendix 4). Promoting Healthy Skin Workshops The workshops also exceeded the project team’s initial objective. Our goal of providing workshop training for staff from one in four facilities and 450 participants was exceeded, with overwhelming demand for workshop places resulting in the need to provide a second round of workshops across Australia. At the completion of the second round, 37 workshops had been given, with 1286 participants, representing 835 facilities. A number of strategies were used to promote the workshops ranging from invitations included in the kit, to postcard mail-outs, broadcast emailing to all facilities and aged care networks and to articles and paid advertising in aged care journals. The most effective method, by far, was directly phoning the facilities. This enabled the caller to contact the relevant staff member and enlist their support for the workshop. As this is a labour intensive exercise, it was only used where numbers needed bolstering, with one venue rising from 3 registrants before the calls to 53 registrants after. The workshops were aimed at staff who had the interest and the capability of implementing evidence-based wound management within their facility or organisation. This targeting was successful in that a large proportion (68%) of participants were Registered Nurses, Nurse Managers, Educators or Consultants. Twenty percent were Endorsed Enrolled Nurses with the remaining 12% being made up of Personal Care Workers or Allied Health Professionals. To facilitate long term sustainability, the workshop employed train-the-trainer strategies. Feedback from the EBPRAC-CSI Stage 1 interviews was used in the development of workshop content. In addition, feedback from the workshop conducted at the end of the EBPRAC-CSI Stage 1 project suggested that change management and leadership training should be included in the workshops. The program was trialled in the first workshop conducted in Brisbane and then rolled out across Australia. Participants were asked to complete pre and post workshop surveys at the beginning and end of the workshop to determine how knowledge and confidence improved over the day. Results from the pre and post surveys showed significant improvements in the level of confidence in attendees’ ability to implement evidence based wound management. The results also indicated a significant increase in the level of confidence in ability to implement change within their facility or organisation. This is an important indication that the inclusion of change management/leadership training with clinical instruction can increase staff capacity and confidence in translating evidence into practice. To encourage the transfer of the evidence based content of the workshop into practice, participants were asked to prepare an Action Plan to be followed by a simple one page progress report three months after the workshop. These reports ranged from simple (e.g. skin moisturising to prevent skin tears), to complex implementation plans for introducing the CSI model across the whole organisation. Outcomes described in the project reports included decreased prevalence of skin tears, pressure injuries and chronic wounds, along with increased staff and resident knowledge and resident comfort. As stated above, some organisations prepared large, complex plans to roll out the CSI model across their organisation. These plans included a review of the organisation’s wound care system, policies and procedures, the creation of new processes, the education of staff and clients, uploading education and resource material onto internal electronic platforms and setting up formal review and evaluation processes. The CSI Resources have been enthusiastically sought and incorporated into multiple health care settings, including aged care, acute care, Medicare Local intranets (e.g. Map of Medicine e-pathways), primary health care, community and home care organisations, education providers and New Zealand aged and community health providers. Recommendations: Recommendations for RACFs, aged care and health service providers and government Skin integrity and the evidence-practice gap in this area should be recognised as a major health issue for health service providers for older adults, with wounds experienced by up to 50% of residents in aged care settings (Edwards et al. 2010). Implementation of evidence based wound care through the Champions for Skin Integrity model in this and the pilot project has demonstrated the prevalence of wounds, wound healing times and wound infections can be halved. A national program and Centre for Evidence Based Wound Management should be established to: - expand the reach of the model to other aged care facilities and health service providers for older adults - sustain the uptake of models such as the Champions for Skin Integrity (CSI) model - ensure current resources, expertise and training are available for consumers and health care professionals to promote skin integrity for all older adults Evidence based resources for the CSI program and similar projects should be reviewed and updated every 3 – 4 years as per NH&MRC recommendations Leadership and change management training is fundamental to increasing staff capacity, at all levels, to promote within-organisation dissemination of skills and knowledge gained from projects providing evidence based training Recommendations for future national dissemination projects A formal program of opportunities for small groups of like projects to share information and resources, coordinate activities and synergise education programs interactively would benefit future national dissemination projects - Future workshop programs could explore an incentive program to optimise attendance and reduce ‘no shows’ - Future projects should build in the capacity and funding for increased follow-up with workshop attendees, to explore the reasons behind those who are unable to translate workshop learnings into the workplace and identify factors to address these barriers.
Resumo:
It is impracticable to upgrade the 18,900 Australian passive crossings as such crossings are often located in remote areas, where power is lacking and with low road and rail traffic. The rail industry is interested in developing innovative in-vehicle technology interventions to warn motorists of approaching trains directly in their vehicles. The objective of this study was therefore to evaluate the benefits of the introduction of such technology. We evaluated the changes in driver performance once the technology is enabled and functioning correctly, as well as the effects of an unsafe failure of the technology? We conducted a driving simulator study where participants (N=15) were familiarised with an in-vehicle audio warning for an extended period. After being familiarised with the system, the technology started failing, and we tested the reaction of drivers with a train approaching. This study has shown that with the traditional passive crossings with RX2 signage, the majority of drivers complied (70%) and looked for trains on both sides of the rail track. With the introduction of the in-vehicle audio message, drivers did not approach crossings faster, did not reduce their safety margins and did not reduce their gaze towards the rail tracks. However participants’ compliance at the stop sign decreased by 16.5% with the technology installed in the vehicle. The effect of the failure of the in-vehicle audio warning technology showed that most participants did not experience difficulties in detecting the approaching train even though they did not receive any warning message. This showed that participants were still actively looking for trains with the system in their vehicle. However, two participants did not stop and one decided to beat the train when they did not receive the audio message, suggesting potential human factors issues to be considered with such technology.
Resumo:
Developing nano/micro-structures which can effectively upgrade the intriguing properties of electrode materials for energy storage devices is always a key research topic. Ultrathin nanosheets were proved to be one of the potential nanostructures due to their high specific surface area, good active contact areas and porous channels. Herein, we report a unique hierarchical micro-spherical morphology of well-stacked and completely miscible molybdenum disulfide (MoS2) nanosheets and graphene sheets, were successfully synthesized via a simple and industrial scale spray-drying technique to take the advantages of both MoS2 and graphene in terms of their high practical capacity values and high electronic conductivity, respectively. Computational studies were performed to understand the interfacial behaviour of MoS2 and graphene, which proves high stability of the composite with high interfacial binding energy (−2.02 eV) among them. Further, the lithium and sodium storage properties have been tested and reveal excellent cyclic stability over 250 and 500 cycles, respectively, with the highest initial capacity values of 1300 mAh g−1 and 640 mAh g−1 at 0.1 A g−1.
Resumo:
There are currently 23,500 level crossings in Australia, broadly divided active level crossings with flashing lights; and passive level crossings controlled by stop and give way signs. The current strategy is to annually upgrade passive level crossings with active controls within a given budget, but the 5,900 public passive crossings are too numerous to be upgraded all. The rail industry is considering alternative options to treat more crossings. One of them is to use lower cost equipment with reduced safety integrity level, but with a design that would fail to a safe state: in case of the impossibility for the system to know whether a train is approaching, the crossing changes to a passive crossing. This is implemented by having a STOP sign coming in front of the flashing lights. While such design is considered safe in terms of engineering design, questions remain on human factors. In order to evaluate whether such approach is safe, we conducted a driving simulator study where participants were familiarized with the new active crossing, before changing the signage to a passive crossing. Our results show that drivers treated the new crossing as an active crossing after the novelty effect had passed. While most participants did not experience difficulties with the crossing being turned back to a passive crossing, a number of participants experienced difficulties stopping in time at the first encounter of such passive crossing. Worse, a number of drivers never realized the signage had changed, highlighting the link between the decision to brake and stop at an active crossing to the lights flashing. Such results show the potential human factor issues of changing an active crossing to a passive crossing in case of failure of the detection of the train.
Resumo:
There are currently 23,500 level crossings in Australia, broadly divided into one of two categories: active level crossings which are fully automatic and have boom barriers, alarm bells, flashing lights, and pedestrian gates; and passive level crossings, which are not automatic and aim to control road and pedestrianised walkways solely with stop and give way signs. Active level crossings are considered to be the gold standard for transport ergonomics when grade separation (i.e. constructing an over- or underpass) is not viable. In Australia, the current strategy is to annually upgrade passive level crossings with active controls but active crossings are also associated with traffic congestion, largely as a result of extended closure times. The percentage of time level crossings are closed to road vehicles during peak periods increases with the rise in the frequency of train services. The popular perception appears to be that once a level crossing is upgraded, one is free to wipe their hands and consider the job done. However, there may also be environments where active protection is not enough, but where the setting may not justify the capital costs of grade separation. Indeed, the associated congestion and traffic delay could compromise safety by contributing to the risk taking behaviour by motorists and pedestrians. In these environments it is important to understand what human factor issues are present and ask the question of whether a one size fits all solution is indeed the most ergonomically sound solution for today’s transport needs.
Resumo:
Provision of network infrastructure to meet rising network peak demand is increasing the cost of electricity. Addressing this demand is a major imperative for Australian electricity agencies. The network peak demand model reported in this paper provides a quantified decision support tool and a means of understanding the key influences and impacts on network peak demand. An investigation of the system factors impacting residential consumers’ peak demand for electricity was undertaken in Queensland, Australia. Technical factors, such as the customers’ location, housing construction and appliances, were combined with social factors, such as household demographics, culture, trust and knowledge, and Change Management Options (CMOs) such as tariffs, price,managed supply, etc., in a conceptual ‘map’ of the system. A Bayesian network was used to quantify the model and provide insights into the major influential factors and their interactions. The model was also used to examine the reduction in network peak demand with different market-based and government interventions in various customer locations of interest and investigate the relative importance of instituting programs that build trust and knowledge through well designed customer-industry engagement activities. The Bayesian network was implemented via a spreadsheet with a tick box interface. The model combined available data from industry-specific and public sources with relevant expert opinion. The results revealed that the most effective intervention strategies involve combining particular CMOs with associated education and engagement activities. The model demonstrated the importance of designing interventions that take into account the interactions of the various elements of the socio-technical system. The options that provided the greatest impact on peak demand were Off-Peak Tariffs and Managed Supply and increases in the price of electricity. The impact in peak demand reduction differed for each of the locations and highlighted that household numbers, demographics as well as the different climates were significant factors. It presented possible network peak demand reductions which would delay any upgrade of networks, resulting in savings for Queensland utilities and ultimately for households. The use of this systems approach using Bayesian networks to assist the management of peak demand in different modelled locations in Queensland provided insights about the most important elements in the system and the intervention strategies that could be tailored to the targeted customer segments.