889 resultados para team management
Resumo:
Construction is an information intensive industry in which the accuracy and timeliness of information is paramount. It observed that the main communication issue in construction is to provide a method to exchange data between the site operation, the site office and the head office. The information needs under consideration are time critical to assist in maintaining or improving the efficiency at the jobsite. Without appropriate computing support this may increase the difficulty of problem solving. Many researchers focus their research on the usage of mobile computing devices in the construction industry and they believe that mobile computers have the potential to solve some construction problems that leads to reduce overall productivity. However, to date very limited observation has been conducted in terms of the deployment of mobile computers for construction workers on-site. By providing field workers with accurate, reliable and timely information at the location where it is needed, it will support the effectiveness and efficiency at the job site. Bringing a new technology into construction industry is not only need a better understanding of the application, but also need a proper preparation of the allocation of the resources such as people, and investment. With this in mind, an accurate analysis is needed to provide clearly idea of the overall costs and benefits of the new technology. A cost benefit analysis is a method of evaluating the relative merits of a proposed investment project in order to achieve efficient allocation of resources. It is a way of identifying, portraying and assessing the factors which need to be considered in making rational economic choices. In principle, a cost benefit analysis is a rigorous, quantitative and data-intensive procedure, which requires identification all potential effects, categorisation of these effects as costs and benefits, quantitative estimation of the extent of each cost and benefit associated with an action, translation of these into a common metric such as dollars, discounting of future costs and benefits into the terms of a given year, and summary of all cost and benefit to see which is greater. Even though many cost benefit analysis methodologies are available for a general assessment, there is no specific methodology can be applied for analysing the cost and benefit of the application of mobile computing devices in the construction site. Hence, the proposed methodology in this document is predominantly adapted from Baker et al. (2000), Department of Finance (1995), and Office of Investment Management (2005). The methodology is divided into four main stages and then detailed into ten steps. The methodology is provided for the CRC CI 2002-057-C Project: Enabling Team Collaboration with Pervasive and Mobile Computing and can be seen in detail in Section 3.
Resumo:
The application of Information and Communication Technology (ICT) in construction industry has been recognised widely by some practitioners and researchers for the last several years. During the 1990s the international construction industry started using with the increasing confidence information and communication technology. The use of e-mail became usual and web-sites were established for marketing purposes. Intranets and extranets were also established to facilitate communication within companies and throughout their branches. One of the important applications of the ICT in construction industry was the use of mobile computing devices to achieve better communication and data transmission between construction sites and offices.
Resumo:
Purpose – The purpose of this paper is to provide a practicable systems-based approach to knowledge management (KM) in a project environment, to encourage organisations to unlock the value in their review processes. It relies on knowledge capture and storage at decision review points, to enrich individual, team and organisational learning during the project life cycle. The project's phases are typically represented horizontally with deliverables (objectives) or project "promises" as the desirable outcomes. The purpose of this paper is to give expression through introducing a vertical dimension to facilitate the KM process. A model is proposed that conceptualises project-specific knowledge drawing on and feeding into the organisation's knowledge management system (KMS) at tactical and strategic levels. Design/methodology/approach – This conceptual paper links concepts from systems theory with KM, to produce a model to identify, collate, and optimise project-based knowledge and integrate it into the management process. Findings – The application of the system theory approach enriches the knowledge generated by a project, and feeds it into the next phase of that project. At the same time, it contributes to the individual's and project team's KM, specifies possible courses of action, together with risks, costs and benefits and thus it expands the organisation's higher level KMS. Research limitations/implications – The concept suggests that the knowledge capture, storage and sharing process may best be undertaken holistically, in view of the systems relationships between the tasks. Systems theory structures this process. Research opportunities include studying the interfaces between levels of KM, in relation to the project's progress. Practical implications – Reconceptualisation of the project as a knowledge creation process may improve the project's progress as well as add to the individual's, project team's, and wider organisation's knowledge base. An example is given. Originality/value – This paper illuminates the broader potential of under-utilised opportunities in well-known management approaches to add dimension to the business project, of knowledge creation, storage and sharing.
Resumo:
Increasingly it has been argued that senior management teams (SMTs), comprising principals, deputy heads and other personnel, play a critical role in the governance of schools. In recent years, many researchers have drawn upon the tools of micropolitics to illuminate the relationships, dynamics and power plays between and amongst members of SMTs. The paper has two foci. Firstly, it overviews some of the seminal literature in the field of SMTs and micropolitics in an attempt to identify the working practices of and challenges facing members of SMTs. Secondly, it discusses an instrument, the TEAM Development Questionnaire, that emerged from a synthesis of this writing and research. The questionnaire presented here was especially devised to use with members of SMTs to help them (i) identify the dynamics amongst team members; and (ii) identify areas for the team to improve. A set of procedures for implementing the TEAM Development Questionnaire is provided to demonstrate its application to the field.
Resumo:
Communication is one team process factor that has received considerable research attention in the team literature. This literature provides equivocal evidence regarding the role of communication in team performance and yet, does not provide any evidence for when communication becomes important for team performance. This research program sought to address this evidence gap by a) testing task complexity and team member diversity (race diversity, gender diversity and work value diversity) as moderators of the team communication — performance relationship; and b) testing a team communication — performance model using established teams across two different task types. The functional perspective was used as the theoretical framework for operationalizing team communication activity. The research program utilised a quasi-experimental research design with participants from a large multi-national information technology company whose Head Office was based in Sydney, Australia. Participants voluntarily completed two team building exercises (a decision making and production task), and completed two online questionnaires. In total, data were collected from 1039 individuals who constituted 203 work teams. Analysis of the data revealed a small number of significant moderation effects, not all in the expected direction. However, an interesting and unexpected finding also emerged from Study One. Large and significant correlations between communication activity ratings were found across tasks, but not within tasks. This finding suggested that teams were displaying very similar profiles of communication on each task, despite the tasks having different communication requirements. Given this finding, Study Two sought to a) determine the relative importance of task versus team effects in explaining variance in team communication measures for established teams; b) determine if established teams had reliable and discernable team communication profiles and if so, c) investigate whether team communication profiles related to task performance. Multi-level modeling and repeated measures analysis of variance (ANOVA) revealed that task type did not have an effect on team communication ratings. However, teams accounted for 24% of the total variance in communication measures. Through cluster analysis, five reliable and distinct team communication profiles were identified. Consistent with the findings of the multi-level analysis and repeated measures ANOVA, teams’ profiles were virtually identical across the decision making and production tasks. A relationship between communication profile and performance was identified for the production task, although not for the decision making task. This research responds to calls in the literature for a better understanding of when communication becomes important for team performance. The moderators tested in this research were not found to have a substantive or reliable effect on the relationship between communication and performance. However, the consistency in team communication activity suggests that established teams can be characterized by their communication profiles and further, that these communication profiles may have implications for team performance. The findings of this research provide theoretical support for the functional perspective in terms of the communication – performance relationship and further support the team development literature as an explanation for the stability in team communication profiles. This research can also assist organizations to better understand the specific types of communication activity and profiles of communication that could offer teams a performance advantage.
Resumo:
This study was aimed at examining the safety climate and relational conflict within teams at the individual level. A sample of 372 respondents, divided into 50 teams, was used to test our hypothesis. It was proposed - and discovered - that team members’ individual differences in need for closure mitigated the negative relationship between perceptions of team safety climate and team relational conflict. The implications of our findings and the study’s limitations are discussed.
Resumo:
Sponsorship is increasingly important in a firm's communication mix. Research to date has focused on the impact of sponsorship on brand awareness and its subsequent consequences for image congruency and consumer attitudes towards sponsors' brands. A lesser studied area is the effect of sponsorship on consumers' purchase intentions and behaviours. We argue that existing models of sponsorship driven purchase behaviour fail to account for affective commitment, which mediates relationship between affiliation with the team and social identification with the team. We propose a modified framework describing the effect of sponsorship on purchase intentions in the context of low and high performing sports teams. The framework is tested using structural equations modelling; employing PLS estimation and data collected via online survey of AFL chat room participants. Results confirm the role of affective commitment in sport sponsorship purchase intentions and indicate that team success has a significant influence on fans' purchase behaviours.
Resumo:
Purpose – Building project management requires real time flow of information between all the project team members or the supply chain members. In the present scenario, when project participants are geographically separated, adoption of Information Communication Technology (ICT) enables such effective communication. But strategic adoption of ICT requires that all the supply chain members follow the accepted methods of communication or the communication protocols. The majority of the construction organizations are small and medium enterprises (SMEs). This research, therefore, proposes to focus on developing IT-enhanced communication protocols for building project management by SMEs. Design/methodology/approach – The research adopts a sequential mixed methods approach, where data collection and analysis are conducted in both the quantitative and qualitative phases of research. Findings – The protocols are proposed as a “Strategic Model for Enhancing ICT Diffusion in Building Projects”. The framework for the model is discussed at three levels of study, i.e industry, organization, and people. Practical implications – While the research was conducted in an Indian context, the research outcome is envisaged to be widely applicable in other countries with due considerations. Originality/value – The developed framework has implications for national level bodies and academic institutions, organizations, people or project managers and is applicable at the international level after due considerations.
Resumo:
Value Management (VM) has been proven to provide a structured framework, together with other supporting tools and techniques, that facilitate effective decision-making in many types of projects, thus achieving ‘best value’ for clients. One of the major success factors of VM in achieving better project objectives for clients is through the provision of beneficial input by multi-disciplinary team members being involved in critical decision-making discussions during the early stage of construction projects. This paper describes a doctoral research proposal based on the application of VM in design and build construction projects, especially focusing on the design stage. The research aims to study the effects of implementing VM in design and build construction projects, in particular how well the methodology addresses issues related to cost overruns resulting from poor coordination and overlooking of critical constructability issues amongst team members in construction projects in Malaysia. It is proposed that through contractors’ early involvement during the design stage, combined with the use of the VM methodology, particularly as a decision-making tool, better optimization of construction cost can be achieved, thus promoting more efficient and effective constructability. The main methods used in this research involve a thorough literature study, semi-structured interviews, and a survey of major stakeholders, a detailed case study and a VM workshop and focus group discussions involving construction professionals in order to explore and possibly develop a framework and a specific methodology for the facilitating successful application of VM within design and build construction projects.
Resumo:
Purpose - Building project management (BPM) requires effective coordination and collaboration between multiple project team organisations which can be achieved by real time information flow between all participants. In the present scenario, this can be achieved by the use of information communication technologies (ICT). The purpose of this paper is to present part of a research project conducted to study the causal relationships between factors affecting ICT adoption for BPM by small and medium enterprises. Design/methodology/approach - This paper discusses structural equation modelling (SEM) analysis conducted to test the causal relationships between quantitative factors. Data for quantitative analysis were gathered through a questionnaire survey conducted in the Indian construction industry. Findings - SEM analysis results help in demonstrating that an increased and matured use of ICT for general administration within the organisation would lead to: an improved ICT infrastructure within the organisation; development of electronic databases; and a staff that is confident of using information technology (IT) tools. In such a scenario, staff would use advanced software and IT technologies for project management (PM) processes and that would lead to an increased adoption of ICT for PM processes. But, for general administration also, ICT adoption would be enhanced if the organisation is interacting more with geographically separated agencies and senior management perceives that significant benefits would accrue by adoption of ICT. All the factors are inter-related and their effect cannot be maximized in isolation. Originality/value - The results provide direction to building project managements for strategically adopting the effective use of ICT within their organisations and for BPM general.
Resumo:
Proactive communication management instead of mortification in the glare of hostile media attention became the theme of a four-day training program for multi-cultural community leaders, the object of this research. The program in Brisbane from December 2009 through to February this year was conducted under auspices of a Community Media Link grant program shared by Griffith University and the Queensland Ethnic Communities Council, together with Journalism academics from the Queensland University of Technology. Twenty-eight participants from 23 organisations took part, with a team of nine facilitators from the host organisations, and guest presenters from the news media. This paper reviews the process, taking into account: its objectives, to empower participants by showing how Australian media operate and introducing participants to journalists; pedagogical thrust, where overview talks, with role play seminars with guest presenters from the media, were combined with practice in interviews and writing for media; and outcomes, assessed on the basis of participants’ responses. The research methodology is qualitative, in that the study is based on discussions to review the planning and experience of sessions, and anonymous, informal feed-back questionnaires distributed to the participants. Background literature on multiculturalism and community media was referred to in the study. The findings indicate positive outcomes for participants from this approach to protection of persons unversed in living in the Australian “mediatised” environment. Most affirmed that the “production side” perspective of the exercise had informed and motivated them effectively, such that henceforth they would venture far more into media management, in their community leadership roles.
Resumo:
Engineering graduates of today are required to adapt to a rapidly changing work environment. In particular, they are expected to demonstrate enhanced capabilities in both mono-disciplinary and multi-disciplinary teamwork environments. Engineering education needs, as a result, to further focus on developing group work capabilities amongst engineering graduates. Over the last two years, the authors trialed various group work strategies across two engineering disciplines. In particular, the effect of group formation on students' performance, task management, and social loafing was analyzed. A recently developed online teamwork management tool, Teamworker, was used to collect students' experience of the group work. Analysis showed that students who were allowed to freely allocate to any group were less likely to report loafing from other team members, than students who were pre-allocated to a group. It also showed that performance was more affected by the presence or absence of a leader in pre-allocated rather than free-allocated groups.
Resumo:
Delivering infrastructure projects involves many stakeholders. Their responsibilities and authorities vary over the course of the project lifecycle - from establishing the project parameters and performance requirements, to operating and maintaining the completed infrastructure. To ensure the successful delivery of infrastructure projects, it is important for the project management team to identify and manage the stakeholders and their requirements. This chapter discusses the management of stakeholders in delivering infrastructure projects, from their conception to completion. It includes managing the stakeholders for project selection and involving them to improve project constructability, operability and maintainability.
Resumo:
QUT Library and the High Performance Computing and Research Support (HPC) Team have been collaborating on developing and delivering a range of research support services, including those designed to assist researchers to manage their data. QUT’s Management of Research Data policy has been available since 2010 and is complemented by the Data Management Guidelines and Checklist. QUT has partnered with the Australian Research Data Service (ANDS) on a number of projects including Seeding the Commons, Metadata Hub (with Griffith University) and the Data Capture program. The HPC Team has also been developing the QUT Research Data Repository based on the Architecta Mediaflux system and have run several pilots with faculties. Library and HPC staff have been trained in the principles of research data management and are providing a range of research data management seminars and workshops for researchers and HDR students.