869 resultados para task manager


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Genetic and environmental sources of covariation among the P3(00) and online performance elicited in a delayed-response working memory task, and psychometric IQ assessed by the multidimensional aptitude battery, were examined in an adolescent twin sample. An association between frontal P3 latency and task performance (phenotypic r = -0.33; genotypic r = -0.49) was indicated, with genes (i.e. twin status) accounting for a large part of the covariation ( > 70%). In contrast, genes influencing P3 amplitude mediated only a small part (2%) of the total genetic variation in task performance. While task performance mediated 15% of the total genetic variation in IQ (phenotypic r = 0.22; genotypic r = 0.39) there was no association between P3 latency and IQ or P3 amplitude with IQ. The findings provide some insight into the inter-relationships among psychophysiological, performance and psychometric measures of cognitive ability, and provide support for a levels-of-processing genetic model of cognition where genes act on specific sub-components of cognitive processes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The conditions under which blink startle facilitation can be found in anticipation of a reaction time task were investigated to resolve inconsistent findings across previous studies. Four groups of participants (n = 64) were presented with two visual stimuli, one predicting a reaction time task (S+) and the second presented alone (S-). Participants were asked to make a speeded response to the offset of the S+ (S1 paradigm) or were asked to respond to a tactile stimulus presented at the offset of the S+ (S1-S2 paradigm). Half of the participants in each paradigm condition received performance feedback. Overall, blink latency shortening and magnitude facilitation were larger during S+ than during S-. More detailed analyses, however, found these differences to be reliable only in the Feedback conditions. Ratings of S+ pleasantness did not change across the experiment. Electrodermal responses to S+ were larger than to S- in all groups with differential electrodermal responding emerging earlier in the S1 paradigm. Taken together, the data support the notion that startle facilitation can occur during non-aversive Pavlovian conditioning. (C) 2002 Elsevier Science B.V. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study investigated the influence of a concurrent cognitive task on the compensatory stepping response in balance-impaired elders and the attentional demand of the stepping response. Kinetic, kinematic and neuromuscular measures of a forward recovery step were investigated in 15 young adults, 15 healthy elders and 13 balance-impaired elders in a single task (postural recovery only) and dual task (postural recovery and vocal reaction time task) situation. Results revealed that reaction times were longer in all subjects when performed concurrently with a compensatory step, they were longer for a step than an in-place response and longer for balance-impaired older adults compared with young adults. An interesting finding was that the latter group difference may be related to prioritization between the two tasks rather than attentional demand, as the older adults completed the step before the reaction time, whereas the young adults could perform both concurrently. Few differences in step characteristics were found between tasks, with the most notable being a delayed latency and reduced magnitude of the early automatic postural response in healthy and balance-impaired elders with a concurrent task. (C) 2002 Elsevier Science B.V. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

It has long been supposed that the interference observed in certain patterns of coordination is mediated, at least in part, by peripheral afference from the moving limbs. We manipulated the level of afferent input, arising from movement of the opposite limb, during the acquisition of a complex coordination task. Participants learned to generate flexion and extension movements of the right wrist, of 75degrees amplitude, that were a quarter cycle out of phase with a 1-Hz sinusoidal visual reference signal. On separate trials, the left wrist either was at rest, or was moved passively by a torque motor through 50degrees, 75degrees or 100degrees, in synchrony with the reference signal. Five acquisition sessions were conducted on successive days. A retention session was conducted I week later. Performance was initially superior when the opposite limb was moved passively than when it was static. The amplitude and frequency of active movement were lower in the static condition than in the driven conditions and the variation in the relative phase relation across trials was greater than in the driven conditions. In addition, the variability of amplitude, frequency and the relative phase relation during each trial was greater when the opposite limb was static than when driven. Similar effects were expressed in electromyograms. The most marked and consistent differences in the accuracy and consistency of performance (defined in terms of relative phase) were between the static condition and the condition in which the left wrist was moved through 50degrees. These outcomes were exhibited most prominently during initial exposure to the task. Increases in task performance during the acquisition period, as assessed by a number of kinematic variables, were generally well described by power functions. In addition, the recruitment of extensor carpi radialis (ECR), and the degree of co-contraction of flexor carpi radialis and ECR, decreased during acquisition. Our results indicate that, in an appropriate task context, afferent feedback from the opposite limb, even when out of phase with the focal movement, may have a positive influence upon the stability of coordination.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the picture-word interference task, naming responses are facilitated when a distractor word is orthographically and phonologically related to the depicted object as compared to an unrelated word. We used event-related functional magnetic resonance imaging (fMRI) to investigate the cerebral hemodynamic responses associated with this priming effect. Serial (or independent-stage) and interactive models of word production that explicitly account for picture-word interference effects assume that the locus of the effect is at the level of retrieving phonological codes, a role attributed recently to the left posterior superior temporal cortex (Wernicke's area). This assumption was tested by randomly presenting participants with trials from orthographically related and unrelated distractor conditions and acquiring image volumes coincident with the estimated peak hemodynamic response for each trial. Overt naming responses occurred in the absence of scanner noise, allowing reaction time data to be recorded. Analysis of this data confirmed the priming effect. Analysis of the fMRI data revealed blood oxygen level-dependent signal decreases in Wernicke's area and the right anterior temporal cortex, whereas signal increases were observed in the anterior cingulate, the right orbitomedial prefrontal, somatosensory, and inferior parietal cortices, and the occipital lobe. The results are interpreted as supporting the locus for the facilitation effect as assumed by both classes of theoretical model of word production. In addition, our results raise the possibilities that, counterintuitively, picture-word interference might be increased by the presentation of orthographically related distractors, due to competition introduced by activation of phonologically related word forms, and that this competition requires inhibitory processes to be resolved. The priming effect is therefore viewed as being sufficient to offset the increased interference. We conclude that information from functional imaging studies might be useful for constraining theoretical models of word production. (C) 2002 Elsevier Science (USA).

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This article explores the role of the European Union in the human rights protection, implementation and promotion in Serbia. It is clear that the EU demands on democratisation in the region of Western Balkans are crucial to achieve the respect for human rights. The human rights standards as part of the conditionality criteria of the EU is a clear message towards the countries aspiring membership. However, Serbia progress in the field has been difficult due to several internal constraints. This paper aims to uncover the democratisation process of Serbia on its path towards the EU, and its progress (or not) regarding human rights protection and implementation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The adoption of the “new public management” in the hospital sector brought about greater presence and power to professional managers in hospitals, thus increasing the risk of conflict in the doctor-manager relationship. Aiming to enrich the discussion on the factors that could be the bases for this conflict and considering the role of accounting, the study presented here corresponds, basically, to what we call “content analysis” of qualitative studies. The results demonstrate that the Portuguese doctors as the sample studied accept, in essence, the principles of enterprise management and recognize the use of accounting information in the scope of their functions as long as they are called to participate as legitimate actors, and authorities respect their desires to preserve a practice which they consider of quality.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A presente dissertação fundamenta-se na monitorização e análise de uma “Unidade de Tratamento de Ar” baseada em tecnologia exsicante evaporativa assistida por energia solar. Primeiramente é apresentado um conjunto de conceitos associados ao tema abordado, de modo a facilitar a compreensão dos fenómenos termodinâmicos envolvidos. Após a abordagem inicial que serve de consolidação, é feito o ponto da situação actual, quer em termos tecnológicos, quer em termos de instalações existentes. A etapa seguinte da dissertação descreve pormenorizadamente a instalação do LNEG e seus princípios de funcionamento, nesta fase também é contemplada a descrição sumária dos equipamentos, dos componentes e dos elementos de medição e controlo presentes no sistema. A metodologia seguida assenta fortemente em dois pontos; primeiro, a monitorização do sistema através do software “Agilent VEE Pro” e pela análise dos dados recolhidos com auxílio da folha de cálculo do LNEG, desenvolvida especialmente para este sistema. Em segundo lugar, a metodologia seguida será a imposta pela “Tarefa 38” de acordo com a Agência Internacional de Energia, no âmbito do programa de Aquecimento e Arrefecimento Solar o que permite a comparação de sistemas a nível internacional. Alias a “Tarefa 38” pretende desenvolver esta tecnologia, ao nível da concepção, estandardização, optimização das instalações, conceder o fácil acesso à informação e promover a comparabilidade de resultados. O desempenho global do sistema é bastante positivo, o bom comportamento do sistema é ilustrado na análise gráfica feita nos modos de aquecimento e arrefecimento. O grau de satisfação dos utilizadores é bom e o sistema demonstra capacidade para manter o conforto térmico dos espaços a climatizar de acordo com as normas e regulamentos em vigor. A utilização das energias renováveis nos dias de hoje, como por exemplo a energia solar é mais do que uma obrigação, é um dever.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

O trabalho que a seguir se apresenta tem como objectivo descrever a criação de um modelo que sirva de suporte a um sistema de apoio à decisão sobre o risco inerente à execução de projectos na área das Tecnologias de Informação (TI) recorrendo a técnicas de mineração de dados. Durante o ciclo de vida de um projecto, existem inúmeros factores que contribuem para o seu sucesso ou insucesso. A responsabilidade de monitorizar, antever e mitigar esses factores recai sobre o Gestor de Projecto. A gestão de projectos é uma tarefa difícil e dispendiosa, consome muitos recursos, depende de numerosas variáveis e, muitas vezes, até da própria experiência do Gestor de Projecto. Ao ser confrontado com as previsões de duração e de esforço para a execução de uma determinada tarefa, o Gestor de Projecto, exceptuando a sua percepção e intuição pessoal, não tem um modo objectivo de medir a plausibilidade dos valores que lhe são apresentados pelo eventual executor da tarefa. As referidas previsões são fundamentais para a organização, pois sobre elas são tomadas as decisões de planeamento global estratégico corporativo, de execução, de adiamento, de cancelamento, de adjudicação, de renegociação de âmbito, de adjudicação externa, entre outros. Esta propensão para o desvio, quando detectada numa fase inicial, pode ajudar a gerir melhor o risco associado à Gestão de Projectos. O sucesso de cada projecto terminado foi qualificado tendo em conta a ponderação de três factores: o desvio ao orçamentado, o desvio ao planeado e o desvio ao especificado. Analisando os projectos decorridos, e correlacionando alguns dos seus atributos com o seu grau de sucesso o modelo classifica, qualitativamente, um novo projecto quanto ao seu risco. Neste contexto o risco representa o grau de afastamento do projecto ao sucesso. Recorrendo a algoritmos de mineração de dados, tais como, árvores de classificação e redes neuronais, descreve-se o desenvolvimento de um modelo que suporta um sistema de apoio à decisão baseado na classificação de novos projectos. Os modelos são o resultado de um extensivo conjunto de testes de validação onde se procuram e refinam os indicadores que melhor caracterizam os atributos de um projecto e que mais influenciam o risco. Como suporte tecnológico para o desenvolvimento e teste foi utilizada a ferramenta Weka 3. Uma boa utilização do modelo proposto possibilitará a criação de planos de contingência mais detalhados e uma gestão mais próxima para projectos que apresentem uma maior propensão para o risco. Assim, o resultado final pretende constituir mais uma ferramenta à disposição do Gestor de Projecto.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Relatório de estágio realizado por: Tiago André Nogueira da Cruz Trabalho orientado pela Mestre Célia Sousa

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Introduction / Aims: Adopting the important decisions represents a specific task of the manager. An efficient manager takes these decisions during a sistematic process with well-defined elements, each with a precise order. In the pharmaceutical practice and business, in the supply process of the pharmacies, there are situations when the medicine distributors offer a certain discount, but require payment in a shorter period of time. In these cases, the analysis of the offer can be made with the help of the decision tree method, which permits identifying the decision offering the best possible result in a given situation. The aims of the research have been the analysis of the product offers of many different suppliers and the establishing of the most advantageous ways of pharmacy supplying. Material / Methods: There have been studied the general product offers of the following medical stores: A&G Med, Farmanord, Farmexim, Mediplus, Montero and Relad. In the case of medicine offers including a discount, the decision tree method has been applied in order to select the most advantageous offers. The Decision Tree is a management method used in taking the right decisions and it is generally used when one needs to evaluate the decisions that involve a series of stages. The tree diagram is used in order to look for the most efficient means to attain a specific goal. The decision trees are the most probabilistic methods, useful when adopting risk taking decisions. Results: The results of the analysis on the tree diagrams have indicated the fact that purchasing medicines with discount (1%, 10%, 15%) and payment in a shorter time interval (120 days) is more profitable than purchasing without a discount and payment in a longer time interval (160 days). Discussion / Conclusion: Depending on the results of the tree diagram analysis, the pharmacies would purchase from the selected suppliers. The research has shown that the decision tree method represents a valuable work instrument in choosing the best ways for supplying pharmacies and it is very useful to the specialists from the pharmaceutical field, pharmaceutical management, to medicine suppliers, pharmacy practitioners from the community pharmacies and especially to pharmacy managers, chief – pharmacists.