895 resultados para system performance evaluation
Resumo:
Objective Evaluating the performance of primary care services for the treatment of tuberculosis according to the assessment referential of health services (structure/process) in Cabedelo, a port city in the state of Paraíba. Method An evaluation quantitative, cross-sectional study, in which were carried out 117 interviews with health professionals using a structured instrument. The analysis was based on the construction of indicators using a standardized value for the reduced variable (z=1). Results The structural indicators showed regular performance for the following variables: professional training, access to record instruments and coordination with other services. The process indicators related to external actions and information about the disease had unsatisfactory performance. The directly observed treatment and the flows of reference/counter-reference had regular performance. Conclusion The focused professional qualification, the fragmentation of practices and the unsystematic home care constitute obstacles for carrying out actions aimed at providing expanded, continuous and resolute care.
Resumo:
Agency Performance Report
Resumo:
We study relative performance evaluation in executive compensation whenexecutives have private information about their ability. We assume that thejoint distribution of an individual firm s profit and market movements dependson the ability of the executive that runs the firm. In the equilibrium of theexecutive labor market, compensation schemes exploit this fact to sortexecutives of di ?erent abilities. This implies that executive compensation isincreasing in own performance, but may also be increasing in industryperformance-a sharp departure from standard relative performance evaluation.This result provides an explanation for the scarcity of relative performanceconsiderations in executive compensation documented by the empirical literature.
Resumo:
Agency Performance Plan, Iowa Public Employees’ Retirement System
Resumo:
Education and diagnostic tests capable of early detection represent our most effective means of preventing transmission of human immunodeficiency virus (HIV). The importance of early detection is underlined by studies demonstrating increased life expectancy following early initiation of antiviral treatment. The Elecsys(®) HIV combi PT assay is a fourth-generation antigen-antibody combination assay developed to allow earlier detection of seroconversion, and to have increased sensitivity and improved specificity. We aimed to determine how early the assay could detect infection compared with existing assays; whether all HIV variants could be detected; and the assay's specificity using samples from blood donors, routine specimens, and patients with potential cross-reacting factors. Samples were identified as positive by the Elecsys(®) assay 4.9 days after a positive polymerase chain reaction result (as determined by the panel supplier), which was earlier than the 5.3-7.1 days observed with comparators. The analytical sensitivity of the Elecsys(®) HIV combi PT assay for the HIV-1 p24 antigen was 1.05 IU/mL, which compares favorably with the comparator assays. In addition, the Elecsys(®) assay identified all screened HIV subtypes and displayed greater sensitivity to HIV-2 homologous antigen and antibodies to HIV-1 E and O and HIV-2 than the other assays. Overall, the specificity of the Elecsys(®) assay was 99.88 % using samples from blood donors and 99.81 % when analyzing unselected samples. Potential cross-reacting factors did not interfere with assay performance. The Elecsys(®) HIV combi PT assay is a sensitive and specific assay that has been granted the CE mark according to Directive 2009/886/EC.
Resumo:
Currently, no standard mix design procedure is available for CIR-emulsion in Iowa. The CIR-foam mix design process developed during the previous phase is applied for CIR-emulsion mixtures with varying emulsified asphalt contents. Dynamic modulus test, dynamic creep test, static creep test and raveling test were conducted to evaluate the short- and long-term performance of CIR-emulsion mixtures at various testing temperatures and loading conditions. A potential benefit of this research is a better understanding of CIR-emulsion material properties in comparison with those of CIR-foam material that would allow for the selection of the most appropriate CIR technology and the type and amount of the optimum stabilization material. Dynamic modulus, flow number and flow time of CIR-emulsion mixtures using CSS-h were generally higher than those of HFMS-2p. Flow number and flow time of CIR-emulsion using RAP materials from Story County was higher than those from Clayton County. Flow number and flow time of CIR-emulsion with 0.5% emulsified asphalt was higher than CIR-emulsion with 1.0% or 1.5%. Raveling loss of CIR-emulsion with 1.5% emulsified was significantly less than those with 0.5% and 1.0%. Test results in terms of dynamic modulus, flow number, flow time and raveling loss of CIR-foam mixtures are generally better than those of CIR-emulsion mixtures. Given the limited RAP sources used for this study, it is recommended that the CIR-emulsion mix design procedure should be validated against several RAP sources and emulsion types.
Resumo:
False identity documents constitute a potential powerful source of forensic intelligence because they are essential elements of transnational crime and provide cover for organized crime. In previous work, a systematic profiling method using false documents' visual features has been built within a forensic intelligence model. In the current study, the comparison process and metrics lying at the heart of this profiling method are described and evaluated. This evaluation takes advantage of 347 false identity documents of four different types seized in two countries whose sources were known to be common or different (following police investigations and dismantling of counterfeit factories). Intra-source and inter-sources variations were evaluated through the computation of more than 7500 similarity scores. The profiling method could thus be validated and its performance assessed using two complementary approaches to measuring type I and type II error rates: a binary classification and the computation of likelihood ratios. Very low error rates were measured across the four document types, demonstrating the validity and robustness of the method to link documents to a common source or to differentiate them. These results pave the way for an operational implementation of a systematic profiling process integrated in a developed forensic intelligence model.
Resumo:
Epoxy coatings have been used on the embedded reinforcing bars of bridge decks since the mid-1970s to mitigate deterioration caused by chloride-induced corrosion. The use of chloride-based deicers became common in the early 1960s and caused corrosion of conventional uncoated bars in bridge decks within 5 to 10 years of commencement of deicer applications. In response to this rapid deterioration, the National Bureau of Standards researched coatings to protect the reinforcement (National Bureau of Standards, 1975), resulting in the development of epoxy-coated reinforcing bars, which were used in bridge decks beginning in 1973. While corrosion-related deterioration has been prevalent on bridge decks with uncoated reinforcing bars in northern climates where the use of deicing salts is common, bridge decks constructed after 1973 with epoxy-coated reinforcing have shown good corrosion resistance with only limited exceptions. On the whole, previous laboratory and field studies regarding the performance of epoxy-coated reinforcing bars are very promising; however, some laboratory and field studies have yielded differing results. In recent years, maintenance personnel for the Iowa Department of Transportation (Iowa DOT) have reportedly performed patch repairs to some bridge decks reinforced with epoxy-coated bars. At one such bridge, the southbound US 65 bridge (Bridge No. 7788.5L065) over the Union Pacific Railroad near Bondurant in Polk County, Iowa, deck repairs were performed by Iowa DOT maintenance personnel in the Spring of 2010, based on our communications regarding this topic with Mr. Gordon Port of the Iowa DOT. These repairs were observed by engineers from the Iowa DOT Office of Bridges and Structures, who reported that significant corrosion was found at a number of epoxy-coated reinforcing bars uncovered during this patch work. These repairs were reportedly performed at spalls and delaminated areas corresponding to cracks over transverse reinforcing bars, and involved careful removal of the concrete from over the bars. Figures 1 through 4 contain photographs provided by Iowa DOT personnel showing the removal process (Figure 1), the conditions encountered (Figures 2 and 3), and close-up views of the corroded reinforcing (Figure 4). As a result of these observations, the Iowa Department of Transportation has requested this study to gain further understanding of the long-term performance of bridge decks reinforced with epoxy-coated bars. The two main objectives of this study are to determine the long-term effectiveness of the epoxy coatings and to determine the potential causes for the deterioration at locations where corrosion has occurred. Wiss, Janney, Elstner Associates, Inc. (WJE) and the Iowa DOT identified eight different bridge decks across Iowa for this study that were constructed using epoxy-coated reinforcing bars. A field investigation consisting of visual inspections, a delamination survey, a concrete cover survey, electrical testing for susceptibility to corrosion, and concrete sampling was conducted within a survey area deemed to be representative of the condition of each bridge deck. Laboratory testing, including chloride ion content testing, characterization of the extracted bars, petrographic examination of the concrete, and carbonation testing, was conducted on the core samples taken from each bridge deck.
Resumo:
Agency Performance Report
Resumo:
Agency Performance Report
Resumo:
Agency Performance Report
Resumo:
Agency Performance Report
Resumo:
Agency Performance Report
Resumo:
Agency Performance Report
Resumo:
Agency Performance Report