985 resultados para safety monitoring
Resumo:
Excessive speed on State and County highways is recognized as a serious problem by many Iowans. Speed increases both the risk and severity of accidents. Studies conducted by the FHWA and NHTSA have concluded that if average speeds were increased by five MPH, fatalities would increase by at least 2,200 annually. Along with the safety problems associated with excessive speed are important energy considerations. When the national speed limit was lowered to 55 MPH in 1974, a tremendous savings in fuel was realized. The estimated actual savings for automobiles amounted to 2.2 billion gallons, an average of 20.75 gallons for each of the 106 million automobiles registered in 1975. These benefits prompted the Federal-Aid Amendment of 1974 requiring annual State enforcement certification as a prerequisite for approval of Federal-aid highway projects. In 1978, the United States D.O.T. recommended to Congress significant changes in speed limit legislation designed to increase compliance with the national speed limit. The Highway Safety Act of 1978 provides for both withholding Federal-aid highway funds and awarding incentive grants based on speed compliance data submitted annually. The objective of this study was to develop and make operational, an automatic speed monitoring system which would have flexible capabilities of collecting accurate speed data on all road systems in Iowa. It was concluded that the Automatic Speed Monitoring Program in Iowa has been successful and needed data is being collected in the most economical manner possible.
Resumo:
"Metric Training For The Highway Industry", HR-376 was designed to produce training materials for the various divisions of the Iowa DOT, local government and the highway construction industry. The project materials were to be used to introduce the highway industry in Iowa to metric measurements in their daily activities. Five modules were developed and used in training over 1,000 DOT, county, city, consultant and contractor staff in the use of metric measurements. The training modules developed deal with the planning through operation areas of highway transportation. The materials and selection of modules were developed with the aid of an advisory personnel from the highway industry. Each module is design as a four hour block of instruction and a stand along module for specific types of personnel. Each module is subdivided into four chapters with chapter one and four covering general topics common to all subjects. Chapters two and three are aimed at hands on experience for a specific group and subject. This module includes: Module 4 - Transportation Planning and Traffic Monitoring. Hands on examples of applications of metric measurements in the development of planning reports and traffic data collection are included in this module.
Resumo:
Micro-electromechanical systems (MEMS) provide vast improvements over existing sensing methods in the context of structural health monitoring (SHM) of highway infrastructure systems, including improved system reliability, improved longevity and enhanced system performance, improved safety against natural hazards and vibrations, and a reduction in life cycle cost in both operating and maintaining the infrastructure. Advancements in MEMS technology and wireless sensor networks provide opportunities for long-term continuous, real-time structural health monitoring of pavements and bridges at low cost within the context of sustainable infrastructure systems. The primary objective of this research was to investigate the use of MEMS in highway structures for health monitoring purposes. This study focused on investigating the use of MEMS and their potential applications in concrete through a comprehensive literature review, a vendor survey, and a laboratory study, as well as a small-scale field study. Based on the comprehensive literature review and vendor survey, the latest information available on off-the-shelf MEMS devices, as well as research prototypes, for bridge, pavement, and traffic applications were synthesized. A commercially-available wireless concrete monitoring system based on radio-frequency identification (RFID) technology and off-the-shelf temperature and humidity sensors were tested under controlled laboratory and field conditions. The test results validated the ability of the RFID wireless concrete monitoring system in accurately measuring the temperature both inside the laboratory and in the field under severe weather conditions. In consultation with the project technical advisory committee (TAC), the most relevant MEMS-based transportation infrastructure research applications to explore in the future were also highlighted and summarized.
Resumo:
Therapeutic drug monitoring (TDM) and pharmacogenetic tests play a major role in minimising adverse drug reactions and enhancing optimal therapeutic response. The response to medication varies greatly between individuals, according to genetic constitution, age, sex, co-morbidities, environmental factors including diet and lifestyle (e.g. smoking and alcohol intake), and drug-related factors such as pharmacokinetic or pharmacodynamic drug-drug interactions. Most adverse drug reactions are type A reactions, i.e. plasma-level dependent, and represent one of the major causes of hospitalisation, in some cases leading to death. However, they may be avoidable to some extent if pharmacokinetic and pharmacogenetic factors are taken into consideration. This article provides a review of the literature and describes how to apply and interpret TDM and certain pharmacogenetic tests and is illustrated by case reports. An algorithm on the use of TDM and pharmacogenetic tests to help characterise adverse drug reactions is also presented. Although, in the scientific community, differences in drug response are increasingly recognised, there is an urgent need to translate this knowledge into clinical recommendations. Databases on drug-drug interactions and the impact of pharmacogenetic polymorphisms and adverse drug reaction information systems will be helpful to guide clinicians in individualised treatment choices.
Resumo:
Remote monitoring through the use of cameras is widely utilized for traffic operation, but has not been utilized widely for roadway maintenance operations. The Utah Department of Transportation (UDOT) has implemented a new remote monitoring system, referred to as a Cloud-enabled Remote Video Streaming (CRVS) camera system for snow removal-related maintenance operations in the winter. The purpose of this study was to evaluate the effectiveness of the use of the CRVS camera system in snow removal-related maintenance operations. This study was conducted in two parts: opinion surveys of maintenance station supervisors and an analysis on snow removal-related maintenance costs. The responses to the opinion surveys mostly displayed positive reviews of the use of the CRVS cameras. On a scale of 1 (least effective) to 5 (most effective), the average overall effectiveness given by the station supervisors was 4.3. An expedition trip for this study was defined as a trip that was made to just check the roadways if snow-removal was necessary. The average of the responses received from surveys was calculated to be a 33 percent reduction in expedition trips. For the second part of this study, an analysis was performed on the snow removal-related maintenance cost data provided by UDOT to see if the installation of a CRVS camera had an effect in reducing expedition trips. This expedition cost comparison was performed for 10 sets of maintenance stations within Utah. It was difficult to make any definitive inferences from the comparison of expedition costs over the years for which precipitation and expedition cost data were available; hence a statistical analysis was performed using the Mixed Model ANOVA. This analysis resulted in an average of 14 percent higher ratio of expedition costs at maintenance stations with a CRVS camera before the installation of the camera compared to the ratio of expedition costs after the installation of the camera. This difference was not proven to be statistically significant at the 95 percent confident level, but indicated that the installation of CRVS cameras was on the average helpful in reducing expedition costs and may be considered practically significant. It is recommended that more detailed and consistent maintenance cost records be prepared for accurate analysis of cost records for this type of study in the future.
Resumo:
OBJECTIVE: To assess the survival benefit and safety profile of low-dose (850 mg/kg) and high-dose (1350 mg/kg) phospholipid emulsion vs. placebo administered as a continuous 3-day infusion in patients with confirmed or suspected Gram-negative severe sepsis. Preclinical and ex vivo studies show that lipoproteins bind and neutralize endotoxin, and experimental animal studies demonstrate protection from septic death when lipoproteins are administered. Endotoxin neutralization correlates with the amount of phospholipid in the lipoprotein particles. DESIGN: A three-arm, randomized, blinded, placebo-controlled trial. SETTING: Conducted at 235 centers worldwide between September 2004 and April 2006. PATIENTS: A total of 1379 patients participated in the study, 598 patients received low-dose phospholipid emulsion, and 599 patients received placebo. The high-dose phospholipid emulsion arm was stopped, on the recommendation of the Independent Data Monitoring Committee, due to an increase in life-threatening serious adverse events at the fourth interim analysis and included 182 patients. MEASUREMENTS AND MAIN RESULTS: A 28-day all-cause mortality and new-onset organ failure. There was no significant treatment benefit for low- or high-dose phospholipid emulsion vs. placebo for 28-day all-cause mortality, with rates of 25.8% (p = .329), 31.3% (p = .879), and 26.9%, respectively. The rate of new-onset organ failure was not statistically different among groups at 26.3%, 31.3%, 20.4% with low- and high-dose phospholipid emulsion, and placebo, respectively (one-sided p = .992, low vs. placebo; p = .999, high vs. placebo). Of the subjects treated, 45% had microbiologically confirmed Gram-negative infections. Maximal changes in mean hemoglobin levels were reached on day 10 (-1.04 g/dL) and day 5 (-1.36 g/dL) with low- and high-dose phospholipid emulsion, respectively, and on day 14 (-0.82 g/dL) with placebo. CONCLUSIONS: Treatment with phospholipid emulsion did not reduce 28-day all-cause mortality, or reduce the onset of new organ failure in patients with suspected or confirmed Gram-negative severe sepsis.
Resumo:
The Iowa Prescription Monitoring Program (PMP) provides authorized prescribers and pharmacists with information regarding their patients’ use of controlled substances and is used as a tool in determining appropriate prescribing and treatment of patients without fear of contributing to a patient’s abuse of or dependence on addictive drugs or diversion of those drugs to illicit use. Iowa pharmacies are required to report to the Iowa PMP all Schedule II, III, and IV controlled substances dispensed by the pharmacy to ambulatory patients.
Resumo:
The Center for Transportation Research and Education (CTRE) issued a report in July 2003, based on a sample study of the application of remote sensed image land use change detection to the methodology of traffic monitoring in Blackhawk County, Iowa. In summary, the results indicated a strong correlation and a statistically significant regression coefficient between the identification of built-up land use change areas from remote sensed data and corresponding changes in traffic patterns, expressed as vehicle miles traveled (VMT). Based on these results, the Iowa Department of Transportation (Iowa DOT) requested that CTRE expand the study area to five counties in the southwest quadrant of the state. These counties are scheduled for traffic counts in 2004, and the Iowa DOT desired the data to 1) evaluate the current methodology used to place the devices; 2) potentially influence the placement of traffic counting devices in areas of high built-up land use change; and 3) determine if opportunities exist to reduce the frequency and/or density of monitoring activity in lower trafficked rural areas of the state. This project is focused on the practical application of built-up land use change data for placement of traffic count data recording devices in five southwest Iowa counties.
Resumo:
Maintenance of adequate oxygenation is a mainstay of intensive care, however, recommendations on the safety, accuracy, and the potential clinical utility of invasive and non-invasive tools to monitor brain and systemic oxygenation in neurocritical care are lacking. A literature search was conducted for English language articles describing bedside brain and systemic oxygen monitoring in neurocritical care patients from 1980 to August 2013. Imaging techniques e.g., PET are not considered. A total of 281 studies were included, the majority described patients with traumatic brain injury (TBI). All tools for oxygen monitoring are safe. Parenchymal brain oxygen (PbtO2) monitoring is accurate to detect brain hypoxia, and it is recommended to titrate individual targets of cerebral perfusion pressure (CPP), ventilator parameters (PaCO2, PaO2), and transfusion, and to manage intracranial hypertension, in combination with ICP monitoring. SjvO2 is less accurate than PbtO2. Given limited data, NIRS is not recommended at present for adult patients who require neurocritical care. Systemic monitoring of oxygen (PaO2, SaO2, SpO2) and CO2 (PaCO2, end-tidal CO2) is recommended in patients who require neurocritical care.
Resumo:
A new Dam Safety Act (494/2009) came into force on 1st October 2009 and a Government Decree on Dam Safety (319/2010) on 5th May 2010. This Dam Safety Guide replaces the Dam Safety Code of Practice (Publication of the Ministry of Agriculture and Forestry 7/1997), removed from circulation on 1st October 2009. The Dam Safety Guide is not binding on the dam owner; the purpose is to complement and elucidate the relevant law and and decree through examples and descriptions. The Guide takes up questions concerning dam design, for instance hydrological dimensioning and technical safety requirements, dam construction and use, the dam break hazard analysis and the dam owner’s emergency action plan, maintenance, use, monitoring as well as the annual and periodic inspections. Dams are classified according to the hazard they pose into class 1, 2 or 3 dams. The classification is not needed, if, according to the dam safety authority, the dam poses no danger. The owner of a classified dam must prepare a monitoring programme, to be approved by decision of the dam safety authority. To establish the hazard caused by a dam, the owner of a class 1 dam must prepare an analysis of the dam hazard to humans and property as well as to the environment. The dam safety authority may also require a dam break hazard analysis for a dam other than class 1 dam if deemed necessary for classification. The owner of a class 1 dam must prepare a plan of measures in case of emergency or operational failure. The plan shall present the dam owner’s state of preparedness to act on their own initiative in the situations described above. In each case, the rescue authorities make a separate assessment for the need to prepare a plan as set out in the Rescue Act. The dam owner must provide the information specified in the Dam Safety Decree to be entered into the dam safety information system. The dam safety authority and the owner of the dam must keep up-to-date printouts in their own dam safety files from the information system for each dam as well as other important documents connected with dam safety to ensure that these are readily available in case of disturbance.
Resumo:
The present study's objective was to analyze the procedures aimed at guaranteeing sanitary conditions when acquiring meat. The study was conducted with university restaurants of the Federal Institutions of Higher Education (IFES) located in the five regions of Brazil. Data were collected using a questionnaire and an evaluation list, which was available online to restaurant professionals. The results showed that restaurants chose one or two types of meat, the most frequent of which were beef and chicken. In restaurants managed by the IFES, the acquisition of raw material occurred by bidding. For vendor selection, the restaurants required product registration with the Inspection Service and requested regulation of the supplier by the Health Surveillance. Monitoring was carried out through a technical visit to the supplier and a review of the past records of the supplier. A higher percentage of restaurants in the Southeast region met appropriate sanitary and hygienic criteria for the receipt of meat, followed by the South, Midwest, Northeast and North. We conclude that restaurants meet most of the safety criteria set in the legislation. However, some weaknesses are evident in the physical and functional structure, the system of transportation of raw material and the records of control measures at the place of reception.
Resumo:
Imaging studies have shown reduced frontal lobe resources following total sleep deprivation (TSD). The anterior cingulate cortex (ACC) in the frontal region plays a role in performance monitoring and cognitive control; both error detection and response inhibition are impaired following sleep loss. Event-related potentials (ERPs) are an electrophysiological tool used to index the brain's response to stimuli and information processing. In the Flanker task, the error-related negativity (ERN) and error positivity (Pe) ERPs are elicited after erroneous button presses. In a Go/NoGo task, NoGo-N2 and NoGo-P3 ERPs are elicited during high conflict stimulus processing. Research investigating the impact of sleep loss on ERPs during performance monitoring is equivocal, possibly due to task differences, sample size differences and varying degrees of sleep loss. Based on the effects of sleep loss on frontal function and prior research, it was expected that the sleep deprivation group would have lower accuracy, slower reaction time and impaired remediation on performance monitoring tasks, along with attenuated and delayed stimulus- and response-locked ERPs. In the current study, 49 young adults (24 male) were screened to be healthy good sleepers and then randomly assigned to a sleep deprived (n = 24) or rested control (n = 25) group. Participants slept in the laboratory on a baseline night, followed by a second night of sleep or wake. Flanker and Go/NoGo tasks were administered in a battery at 1O:30am (i.e., 27 hours awake for the sleep deprivation group) to measure performance monitoring. On the Flanker task, the sleep deprivation group was significantly slower than controls (p's <.05), but groups did not differ on accuracy. No group differences were observed in post-error slowing, but a trend was observed for less remedial accuracy in the sleep deprived group compared to controls (p = .09), suggesting impairment in the ability to take remedial action following TSD. Delayed P300s were observed in the sleep deprived group on congruent and incongruent Flanker trials combined (p = .001). On the Go/NoGo task, the hit rate (i.e., Go accuracy) was significantly lower in the sleep deprived group compared to controls (p <.001), but no differences were found on false alarm rates (i.e., NoGo Accuracy). For the sleep deprived group, the Go-P3 was significantly smaller (p = .045) and there was a trend for a smaller NoGo-N2 compared to controls (p = .08). The ERN amplitude was reduced in the TSD group compared to controls in both the Flanker and Go/NoGo tasks. Error rate was significantly correlated with the amplitude of response-locked ERNs in control (r = -.55, p=.005) and sleep deprived groups (r = -.46, p = .021); error rate was also correlated with Pe amplitude in controls (r = .46, p=.022) and a trend was found in the sleep deprived participants (r = .39, p =. 052). An exploratory analysis showed significantly larger Pe mean amplitudes (p = .025) in the sleep deprived group compared to controls for participants who made more than 40+ errors on the Flanker task. Altered stimulus processing as indexed by delayed P3 latency during the Flanker task and smaller amplitude Go-P3s during the Go/NoGo task indicate impairment in stimulus evaluation and / or context updating during frontal lobe tasks. ERN and NoGoN2 reductions in the sleep deprived group confirm impairments in the monitoring system. These data add to a body of evidence showing that the frontal brain region is particularly vulnerable to sleep loss. Understanding the neural basis of these deficits in performance monitoring abilities is particularly important for our increasingly sleep deprived society and for safety and productivity in situations like driving and sustained operations.
Resumo:
Le but de cette étude était d’évaluer les qualifications de performance du système FlexiWare® chez le rat male Sprague Dawley et le singe Cynomolgus éveillés, ainsi que chez le chien Beagle éveillé et anesthésié, suite à l’administration de produits ayant une activité pharmacologique connue. Les produits utilisés incluaient l’albutérol administré par inhalation, la méthacholine, et le rémifentanil administrés par voie intraveineuse. Une solution saline administré par voie intraveneuse, a été utilisée comme substance témoin. Différentes variables ont servi à évaluer la réponse des animaux (rats, chien, singe). Ces dernières comprenaient la fréquence respiratoire (RR), le volume courant (TV), la ventilation minute (MV). Des paramètres additionnels ont été évalués chez le rat, soit les temps d’inspiration (IT) et d’expiration (ET), le temps du pic de débit expiratoire, les pics de débits inspiratoire et expiratoire, le ratio inspiratoire:expiratoire (I:E), le ratio inspiratoire sur respiration totale (I:TB), et l’écoulement expiratoire moyen (EF50). Les résultats obtenus ont démontré que le système FlexiWare® était suffisamment sensible et spécifique pour dépister, chez les espèces animales utilisées, les effets bronchodilateur, bronchoconstricteur et dépresseur central des substances testées. Il pourrait faire partie des méthodes (ICH 2000) utilisées en pharmacologie de sécurité lors de l’évaluation de substances pharmacologiques sur le système respiratoire des animaux de laboratoire. Les espèces animales utilisées ont semblé s’adapter aisément aux procédures de contention. Les paramètres évalués, RR, TV et MV ont permis de caractériser la réponse des animaux suite à l’administration de produits pharmacologiques à effets connus, judicieusement complétés par les variables de débit. L’ajout de paramètres du temps n’était pas primordiale pour détecter les effets des drogues, mais offre des outils complémentaires d’interpréter les changements physiologiques. Cependant, chez le rat conscient, la période d’évaluation ne devrait pas s’étendre au-delà d’une période de deux heures post traitement. Ces études constituent une évaluation des qualifications de performance de cet appareil et ont démontré de manière originale, la validation concurrentielle, en terme de précision (sensibilité et spécificité) et fiabilité pour différentes variables et sur différentes espèces.
Resumo:
A study was done to establish work practices and preventive measures for nurses handling antineoplasticdrugs (AND) and to determine the risk of developing AND-related symptoms. A descriptive cross sectional study was made. Workers from 5 health centers in Valencia, Venezuela, were selected. Demography, occupational and clinical history, shift, work practices, safety precautions, antineoplastic drugs used, residues disposal and life styles were obtained via a questionnaire. Most prevalent symptoms were adjusted for age, shift, and smoking. Age was significant for cough and dizziness; smoking was significant for abdomipo seleccionado de trabajadores que manejan FAN en cinco centros de salud de la ciudad de Valencia, Venezuela, con el propósito de evaluar de forma preliminar su riesgo potencial de desarrollar signos-síntomas derivados de este oficio; a su vez, establecer si existe la necesidad de continuar con una evaluación más profunda que permita hacer recomendaciones concluyentes para evitar sus efectos adversos. Metodología La población estuvo constituida por el personal de las unidades de oncología de cinco centros de salud de la ciudad de Valencia, Venezuela. La muestra la conformaron veinte trabajadores que pertenecen a dichos centros. La participación fue voluntaria y mediante firma de una carta de consentimiento. Recolección de datos Se realizó una entrevista a cada participante con información que hizo referencia a datos demográficos, historia ocupacional, turnos de trabajo, entrenamiento en medidas de seguridad para el manejo de este tipo de fármacos, actividades que realizan, uso de equipos de protección personal (EPP), sitio de manipulación de nal pain and shift was significant for nausea and cough. Nauseas were the most prevalent symptom (55%). Dizziness was directly associated with use of gowns and inversely half-face respirator. None of the studied centers had satisfactory working conditions. A follow up study should be made including physical exam and environmental and biological monitoring.