978 resultados para residential construction costs


Relevância:

80.00% 80.00%

Publicador:

Resumo:

The use of appropriate financial incentives within construction projects can contribute to strong alignment of project stakeholder motivation with project goals. However, effective incentive system design can be a challenging task and takes skillful planning by client managers in the early stages of a project. In response to a lack of information currently available to construction clients in this area, this paper explores the features of a successful incentive system and identifies key learnings for client managers to consider when designing incentives. Our findings, based on data from a large Australian case study, suggest that key stakeholders place greater emphasis on the project management processes that support incentives than on the incentive itself. Further, contractors need adequate time and information to accurately estimate construction costs prior to their tender price submission to ensure cost-focused incentive goals remain achievable. Thus, client managers should be designing incentives as part of a supportive procurement strategy to maximize project stakeholder motivation and prevent goal misalignment.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

LiteSteel Beam (LSB) is a new cold-formed steel beam produced by OneSteel Australian Tube Mills (OATM). The new beam is effectively a channel section with two rectangular hollow flanges and a slender web, and is manufactured using patented dual electric resistance welding and automated roll-forming technologies. OATM is promoting the use of LSBs as flexural members in residential construction. When LSBs are used as back to back built-up sections, they are likely to improve their moment capacity. However, the research project conducted on the flexural behaviour of back to back built-up LSBs showed that the detrimental effects of lateral distortional buckling in single LSB members appear to remain with back to back built-up LSB members. The ultimate moment capacity of back to back LSB member is also affected by lateral distortional buckling failure. Therefore an investigation was conducted with an aim to develop suitable strength improvement methods, which are likely to mitigate lateral distortional buckling effects and hence improve the flexural strengths of back to back LSB members. This paper presents the details of this investigation, the results and recommendations for the most suitable and cost-effective method, which significantly improves the moment capacities of back to back LSB members.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

New substation technology, such as non-conventional instrument transformers,and a need to reduce design and construction costs, are driving the adoption of Ethernet based digital process bus networks for high voltage substations. Protection and control applications can share a process bus, making more efficient use of the network infrastructure. This paper classifies and defines performance requirements for the protocols used in a process bus on the basis of application. These include GOOSE, SNMP and IEC 61850-9-2 sampled values. A method, based on the Multiple Spanning Tree Protocol (MSTP) and virtual local area networks, is presented that separates management and monitoring traffic from the rest of the process bus. A quantitative investigation of the interaction between various protocols used in a process bus is described. These tests also validate the effectiveness of the MSTP based traffic segregation method. While this paper focusses on a substation automation network, the results are applicable to other real-time industrial networks that implement multiple protocols. High volume sampled value data and time-critical circuit breaker tripping commands do not interact on a full duplex switched Ethernet network, even under very high network load conditions. This enables an efficient digital network to replace a large number of conventional analog connections between control rooms and high voltage switchyards.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper presents a unified view of the relationship between (1) quantity and (2) price generating mechanisms in estimating individual prime construction costs/prices. A brief review of quantity generating techniques is provided with particular emphasis on experientially based assumptive approaches and this is compared with the level of pricing data available for the quantities generated in terms of reliability of the ensuing prime cost estimates. It is argued that there is a tradeoff between the reliability of quantity items and reliability of rates. Thus it is shown that the level of quantity generation is optimised by maximising the joint reliability function of the quantity items and their associated rates. Some thoughts on how this joint reliability function can be evaluated and quantified follow. The application of these ideas is described within the overall strategy of the estimator's decision - "Which estimating technique shall I use for a given level of contract information? - and a case is made for the computer generation of estimates by several methods, with an indication of the reliability of each estimate, the ultimate choice of estimate being left to the estimator concerned. Finally, the potential for the development of automatic estimating systems within this framework is examined.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The overall aim of this research project was to provide a broader range of value propositions (beyond upfront traditional construction costs) that could transform both the demand side and supply side of the housing industry. The project involved gathering information about how building information is created, used and communicated and classifying building information, leading to the formation of an Information Flow Chart and Stakeholder Relationship Map. These were then tested via broad housing industry focus groups and surveys. The project revealed four key relationships that appear to operate in isolation to the whole housing sector and may have significant impact on the sustainability outcomes and life cycle costs of dwellings over their life cycle. It also found that although a lot of information about individual dwellings does already exist, this information is not coordinated or inventoried in any systematic manner and that national building information files of building passports would present value to a wide range of stakeholders.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Changes in the construction sector are creating opportunities in research to maximise the benefits of those changes and to continue the exciting developments in improved people skills, new processes and developing technologies. Many research centres around the world are investigating aspects of the current changes to drive their particular expertise forward. However, the CIB Integrated Design and Delivery Solutions (IDDS) priority research theme takes a higher-level view of the changes and then focuses down on a prioritised set of research targets. These targets have been investigated, re-focussed and validated over a period of four years through many workshops, conferences and meetings by a wide ranging group of representatives from approximately 90 industry and research organisations. The outcomes of such research, once put into practice should be significantly shortened timespans from conception of need to occupation of new or revised structures. As time is money, the owners will get their investments into productive use sooner, which means a shorter payback time. In addition, there will inevitably be a reduction in construction costs as productivity increases. The improvements in reliable delivery and improved quality currently being seen in relatively simplistic use of Building information Modelling (BIM) (compared to full IDDS) will inevitably continue its on-going trajectory of improvement. We should also consider the wider economic contribution to society that will stem from such improvements and, finally, and by no means unimportantly, the reliable modelling and delivery of sustainability at both the building and estate/ area scale will significantly improve carbon footprints and other sustainable outcomes. Whilst there are huge opportunities for early adopters, the primary risk will be the expansion of the gap between those working in this way and those who are not so advanced or who even refuse to progress . The opportunities to address the significant and widely varying wastes within the structure of the construction sector and within and across projects are huge and timely and industry is encouraged to become involved.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Changes in the construction sector are creating opportunities in research to maximise the benefits of those changes and to continue the exciting developments in improved people skills, new processes and developing technologies. There are many research centres around the world investigating aspects of the current changes to drive their particular expertise forward. However, the CIB Integrated Design and Delivery Solutions (IDDS) priority research theme takes a higher-level view of the changes and then focuses down on a prioritised set of research targets. These targets have been investigated, re-focussed and validated over a period of four years through many workshops, conferences and meetings by a wide ranging group of representatives from approximately 90 industry and research organisations. This roadmap prioritises and details the research to be performed, why and by whom. In particular, some 25 CIB Working Commissions and Task Groups are explained as having potential roles in the delivery of this research theme. We are extremely privileged to have been urged on by such distinguished construction professionals in their forewords and the case for research. The outcomes of such research, once put into practice should be significantly shortened timespans from conception of need to occupation of new or revised structures. As time is money, the owners will get their investments into productive use sooner, which means a shorter payback time. In addition, there will inevitably be a reduction in construction costs as productivity increases. The improvements in reliable delivery and improved quality currently being seen in relatively simplistic use of Building information Modelling (BIM) (compared to full IDDS) will inevitably continue its on-going trajectory of improvement. We should also consider the wider economic contribution to society that will stem from such improvements and, finally, and by no means unimportantly, the reliable modelling and delivery of sustainability at both the building and estate/ area scale will significantly improve carbon footprints and other sustainable outcomes. Whilst there are huge opportunities for early adopters, the primary risk will be the expansion of the gap between those working in this way and those who are not so advanced or who even refuse to progress1. However, a similar issue arises between industry, clients, educators and trainers; the latter have particular challenges, having existed for many years in a sector that has had relatively few technological changes. However, the opportunities to address the significant and widely varying wastes within the structure of the construction sector and within and across projects are huge and timely. Whilst this Roadmap is specifically targeted at the Standing Commissions and Task Groups of the CIB, it is hoped that there are elements for research and applied research across academia and industry.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Digital technology offers enormous benefits (economic, quality of design and efficiency in use) if adopted to implement integrated ways of representing the physical world in a digital form. When applied across the full extent of the built and natural world, it is referred to as the Digital Built Environment (DBE) and encompasses a wide range of approaches and technology initiatives, all aimed at the same end goal: the development of a virtual world that sufficiently mirrors the real world to form the basis for the smart cities of the present and future, enable efficient infrastructure design and programmed maintenance, and create a new foundation for economic growth and social well-being through evidence-based analysis. The creation of a National Data Policy for the DBE will facilitate the creation of additional high technology industries in Australia; provide Governments, industries and citizens with greater knowledge of the environments they occupy and plan; and offer citizen-driven innovations for the future. Australia has slipped behind other nations in the adoption and execution of Building Information Modelling (BIM) and the principal concern is that the gap is widening. Data driven innovation added $67 billion to the Australian economy in 20131. Strong open data policy equates to $16 billion in new value2. Australian Government initiatives such as the Digital Earth inspired “National Map” offer a platform and pathway to embrace the concept of a “BIM Globe”, while also leveraging unprecedented growth in open source / open data collaboration. Australia must address the challenges by learning from international experiences—most notably the UK and NZ—and mandate the use of BIM across Government, extending the Framework for Spatial Data Foundation to include the Built Environment as a theme and engaging collaboration through a “BIM globe” metaphor. This proposed DBE strategy will modernise the Australian urban planning and the construction industry. It will change the way we develop our cities by fundamentally altering the dynamics and behaviours of the supply chains and unlocking new and more efficient ways of collaborating at all stages of the project life-cycle. There are currently two major modelling approaches that contribute to the challenge of delivering the DBE. Though these collectively encompass many (often competing) approaches or proprietary software systems, all can be categorised as either: a spatial modelling approach, where the focus is generally on representing the elements that make up the world within their geographic context; and a construction modelling approach, where the focus is on models that support the life cycle management of the built environment. These two approaches have tended to evolve independently, addressing two broad industry sectors: the one concerned with understanding and managing global and regional aspects of the world that we inhabit, including disciplines concerned with climate, earth sciences, land ownership, urban and regional planning and infrastructure management; the other is concerned with planning, design, construction and operation of built facilities and includes architectural and engineering design, product manufacturing, construction, facility management and related disciplines (a process/technology commonly known as Building Information Modelling, BIM). The spatial industries have a strong voice in the development of public policy in Australia, while the construction sector, which in 2014 accounted for around 8.5% of Australia’s GDP3, has no single voice and because of its diversity, is struggling to adapt to and take advantage of the opportunity presented by these digital technologies. The experience in the UK over the past few years has demonstrated that government leadership is very effective in stimulating industry adoption of digital technologies by, on the one hand, mandating the use of BIM on public procurement projects while at the same time, providing comparatively modest funding to address the common issues that confront the industry in adopting that way of working across the supply chain. The reported result has been savings of £840m in construction costs in 2013/14 according to UK Cabinet Office figures4. There is worldwide recognition of the value of bringing these two modelling technologies together. Australia has the expertise to exercise leadership in this work, but it requires a commitment by government to recognise the importance of BIM as a companion methodology to the spatial technologies so that these two disciplinary domains can cooperate in the development of data policies and information exchange standards to smooth out common workflows. buildingSMART Australasia, SIBA and their academic partners have initiated this dialogue in Australia and wish to work collaboratively, with government support and leadership, to explore the opportunities open to us as we develop an Australasian Digital Built Environment. As part of that programme, we must develop and implement a strategy to accelerate the adoption of BIM processes across the Australian construction sector while at the same time, developing an integrated approach in concert with the spatial sector that will position Australia at the forefront of international best practice in this area. Australia and New Zealand cannot afford to be on the back foot as we face the challenges of rapid urbanisation and change in the global environment. Although we can identify some exemplary initiatives in this area, particularly in New Zealand in response to the need for more resilient urban development in the face of earthquake threats, there is still much that needs to be done. We are well situated in the Asian region to take a lead in this challenge, but we are at imminent risk of losing the initiative if we do not take action now. Strategic collaboration between Governments, Industry and Academia will create new jobs and wealth, with the potential, for example, to save around 20% on the delivery costs of new built assets, based on recent UK estimates.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Urban planning policies in Australia presuppose apartments as the new dominant housing type, but much of what the market has delivered is criticised as over-development, and as being generic, poorly-designed, environmentally unsustainable and unaffordable. Policy responses to this problem typically focus on planning regulation and construction costs as the primary issues needing to be addressed in order to increase the supply of quality, affordable apartment housing. In contrast, this paper uses Ball’s (1983) ‘structures of provision’ approach to outline the key processes informing apartment development and identifies a substantial gap in critical understanding of how apartments are developed in Australia. This reveals economic problems not typically considered by policymakers. Using mainstream economic analysis to review the market itself, the authors found high search costs, demand risk, problems with exchange, and lack of competition present key barriers to achieving greater affordability and limit the extent to which ‘speculative’ developers can respond to the preferences of would be owner-occupiers of apartments. The existing development model, which is reliant on capturing uplift in site value, suits investors seeking rental yields in the first instance and capital gains in the second instance, and actively encourages housing price inflation. This is exacerbated by lack of density restrictions, such as have existed in inner Melbourne for many years, which permits greater yields on redevelopment sites. The price of land in the vicinity of such redevelopment sites is pushed up as landholders' expectation of future yield is raised. All too frequently existing redevelopment sites go back onto the market as vendors seek to capture the uplift in site value and exit the project in a risk free manner...

Relevância:

80.00% 80.00%

Publicador:

Resumo:

PROBLEM Cost of delivering medium density apartments impedes supply of new and more affordable housing in established suburbs EXISTING FOCUS - Planning controls - Construction costs, esp labour - Regulation eg sustainability

Relevância:

80.00% 80.00%

Publicador:

Resumo:

A combined hot and cold smoking kiln has been constructed for use at Lake Turkana, Kenya. Used for cold smoking, the kiln's main advantages over the traditional kilns used in this area are its greater smoking capacity and lower firewood consumption. Having the option of using the same smoke house for cold and hot smoking reduces the total construction costs for an operator producing both types of smoke cured product. The hot smoking process was found to require markedly less firewood than cold smoking, a fact of considerable importance in desert or semi-desert areas with sparse vegetation.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Dissertação para obtenção do grau de Engenharia Civil na Área de Especialização de Edificações

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Civil

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para a obtenção do grau de Mestre em Engenharia Civil, na Área de Especialização de Vias de Comunicação e Transportes

Relevância:

80.00% 80.00%

Publicador:

Resumo:

O trabalho apresentado centra-se na determinação dos custos de construção de condutas de pequenos e médios diâmetros em Polietileno de Alta Densidade (PEAD) para saneamento básico, tendo como base a metodologia descrita no livro Custos de Construção e Exploração – Volume 9 da série Gestão de Sistemas de Saneamento Básico, de Lencastre et al. (1994). Esta metodologia descrita no livro já referenciado, nos procedimentos de gestão de obra, e para tal foram estimados custos unitários de diversos conjuntos de trabalhos. Conforme Lencastre et al (1994), “esses conjuntos são referentes a movimentos de terras, tubagens, acessórios e respetivos órgãos de manobra, pavimentações e estaleiro, estando englobado na parte do estaleiro trabalhos acessórios correspondentes à obra.” Os custos foram obtidos analisando vários orçamentos de obras de saneamento, resultantes de concursos públicos de empreitadas recentemente realizados. Com vista a tornar a utilização desta metodologia numa ferramenta eficaz, foram organizadas folhas de cálculo que possibilitam obter estimativas realistas dos custos de execução de determinada obra em fases anteriores ao desenvolvimento do projeto, designadamente numa fase de preparação do plano diretor de um sistema ou numa fase de elaboração de estudos de viabilidade económico-financeiros, isto é, mesmo antes de existir qualquer pré-dimensionamento dos elementos do sistema. Outra técnica implementada para avaliar os dados de entrada foi a “Análise Robusta de Dados”, Pestana (1992). Esta metodologia permitiu analisar os dados mais detalhadamente antes de se formularem hipóteses para desenvolverem a análise de risco. A ideia principal é o exame bastante flexível dos dados, frequentemente antes mesmo de os comparar a um modelo probabilístico. Assim, e para um largo conjunto de dados, esta técnica possibilitou analisar a disparidade dos valores encontrados para os diversos trabalhos referenciados anteriormente. Com os dados recolhidos, e após o seu tratamento, passou-se à aplicação de uma metodologia de Análise de Risco, através da Simulação de Monte Carlo. Esta análise de risco é feita com recurso a uma ferramenta informática da Palisade, o @Risk, disponível no Departamento de Engenharia Civil. Esta técnica de análise quantitativa de risco permite traduzir a incerteza dos dados de entrada, representada através de distribuições probabilísticas que o software disponibiliza. Assim, para por em prática esta metodologia, recorreu-se às folhas de cálculo que foram realizadas seguindo a abordagem proposta em Lencastre et al (1994). A elaboração e a análise dessas estimativas poderão conduzir à tomada de decisões sobre a viabilidade da ou das obras a realizar, nomeadamente no que diz respeito aos aspetos económicos, permitindo uma análise de decisão fundamentada quanto à realização dos investimentos.