890 resultados para public office building


Relevância:

90.00% 90.00%

Publicador:

Resumo:

Within the building energy saving strategies, BIPV (building integrated photovoltaic systems) present a promising potential based on the close relationship existing between these multifunctional systems and the overall building energy balance. Building integration of STPV (semi-transparent photovoltaic) elements affects deeply the building energy demand since it influences the heating, cooling and lighting loads as well as the local electricity generation. This work analyses over different window-to-wall ratios the overall energy performance of five STPV elements, each element having a specific degree of transparency, in order to assess the energy saving potential compared to a conventional solar control glass compliant with the local technical standard. The prior optical characterization, focused to measure the spectral properties of the elements, was experimentally undertaken. The obtained data were used to perform simulations based on a reference office building using a package of specific software tools (DesignBuilder, EnergyPlus, PVsyst, and COMFEN) to take proper account of the STPV peculiarities. To evaluate the global energy performance of the STPV elements a new Energy Balance Index was formulated. The results show that for intermediate and large façade openings the energy saving potential provided by the STPV solutions ranges between 18% and 59% compared to the reference glass.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

"January 1996."

Relevância:

90.00% 90.00%

Publicador:

Resumo:

"January 1994."

Relevância:

90.00% 90.00%

Publicador:

Resumo:

"July 1997."

Relevância:

90.00% 90.00%

Publicador:

Resumo:

"Sample outline of construction documents for general work for an office building." (1 v. (various pagings)), issued in 1961.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Bibliography: p. 35-36.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

In 2004, both Illinois EPA and U.S. EPA investigated the location of a former battery cracking and recycling operation in Gilberts. The main site is located immediately north of the intersection of Railroad and Mill Streets bounded to Galligan Road on the east and the Chicago and Northwestern Railway on the west. It is in an area that is mostly wooded near both industrial and residential properties. Lead acid batteries were cracked open to recover the lead. Some of the lead seeped into the ground along with acid contained in the batteries. Extensive environmental sampling last summer identified a six-acre area of gross contamination (mainly lead). Later, a second area of contamination was discovered to the southwest, where the Village of Gilberts Public Works building is now located, west of the railroad tracks - this is known as the Tower Hill Road site.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

L.J. Sarvis, architect. Miller-Davis, contractor. Built in 1942

Relevância:

90.00% 90.00%

Publicador:

Resumo:

L.J. Sarvis, architect. Miller-Davis, contractor. Built in 1942

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

None issued 1955

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Covers U.S. Capitol, Capitol Grounds, and surrounding government buildings.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Covers U.S. Capitol, Capitol Grounds, and surrounding government buildings.