977 resultados para off-road cycling
Resumo:
Federal Highway Administration, Office of Research and Development, Washington, D.C.
Resumo:
Federal Highway Administration, Washington, D.C.
Resumo:
Mode of access: Internet.
Resumo:
Virginia Department of Transportation, Richmond
Resumo:
Mode of access: Internet.
Resumo:
Federal Highway Administration, Washington, D.C.
Resumo:
Federal Highway Administration, Washington, D.C.
Resumo:
National Highway Traffic Safety Administration, Washington, D.C.
Resumo:
"PB2006-916202."
Resumo:
The Iowa Statewide Recreational Trails Plan was developed in response to the State Legislature's recognition of the increased public demand for quality outdoor recreational facilities and the numerous benefits associated with the development and usage of trail systems. The plan presents a statewide trails system that will serve as a basis for trail planning efforts throughout the state. Included are design guidelines for each of the major trail modes contained within the plan including bike, hiking, cross-country skiing, snowmobiling, off-road vehicles, and equestrian, as well as for locating trails within the highway right-of-way. Also included are estimates of implementation costs and financing alternatives. This report contains the complete plan. Separately bound documents include the Executive Summary and two additional appendices: (1) Trails Plan Resource Inventory and (2) Summary of Public Comments and Summary of Technical Advisory Committee Comments.
Resumo:
Anualmente, realizam-se no país inúmeras iniciativas de Todo-Terreno Turístico (TTT) onde são automaticamente registadas as coordenadas de Global Positioning System (GPS) por aplicações de dispositivos móveis. Este tipo de informação pode ser utilizada, quer para fins de divulgação turística, quer por outro tipo de entidades que necessitem de circular nesses caminhos rurais, tipicamente no meio da montanha. Entre outras, são registadas a posição, velocidade e altitude do veículo, o que permite obter informações relevantes, tais como, se o percurso se encontra transitável ou qual a velocidade recomendada. Por exemplo, durante os combates a incêndios, os bombeiros e proteção civil poderão saber se estes percursos são utilizáveis no planeamento dos combates a incêndios com reduzida probabilidade de complicações relativa ao acesso dos veículos, melhorando assim o tempo de resposta. O presente documento discute como poderá ser concebida uma aplicação web mapping, de código aberto, que permita a partilha, utilização e valorização de dados relativos aos percursos todo-terreno dos praticantes de TTT. O presente documento descreve como a aplicação desenvolvida no âmbito da dissertação de mestrado permite selecionar e ordenar possíveis trajetos que incluem os trajetos de TTT, apresentando as caraterísticas do terreno de modo a auxiliar a tomada de decisão por membros das corporações de Bombeiros. Será igualmente apresentada a interface atual da aplicação que inclui um mapa dinâmico e um gestor de pontos de referência.
Resumo:
Variability in the pollutant wash-off process is a concept which needs to be understood in-depth in order to better assess the outcomes of stormwater quality models, and thereby strengthen stormwater pollution mitigation strategies. Current knowledge about the wash-off process does not extend to a clear understanding of the influence of the initially available pollutant build-up on the variability of the pollutant wash-off load and composition. Consequently, pollutant wash-off process variability is poorly characterised in stormwater quality models, which can result in inaccurate stormwater quality predictions. Mathematical simulation of particulate wash-off from three urban road surfaces confirmed that the wash-off load of particle size fractions <150µm and >150µm after a storm event vary with the build-up of the respective particle size fractions available at the beginning of the storm event. Furthermore, pollutant load and composition associated with the initially available build-up of <150µm particles predominantly influence the variability in washed-off pollutant load and composition. The influence of the build-up of pollutants associated with >150µm particles on wash-off process variability is significant only for relatively shorter duration storm events.
Resumo:
When an older driver has a crash with tragic consequences, there are calls for stricter licensing controls to detect “unfit” drivers and take their licences away, typically focusing on those aged 75 or over. When the crash records for older drivers are compared across jurisdictions, however, there is no observable impact of any restrictions. This includes compulsory re-testing, which is strongly advocated by the public but is not supported by the research.
Resumo:
Women in fishing communities are increasingly moving from traditional, community based occupations to seeking employment in the labour market. While this is an opportunity for women, their employment is also largely in the male dominated fishing industry, where job segregation into ‘less skilled and low paid’ jobs for women define employment opportunities. However, engagement as members in local non-government networks help women to challenge these stereotypes. In South Africa, for instance, the recent legislation promoting opportunity for women in male dominated sectors of employment is an opportunity for women to earn wages equal to those of men.
Resumo:
Heavy metals, primarily zinc, copper, lead, and chromium, and Polycyclic Aromatic Hydrocarbons (PAHs) are the main hazardous constituents of road runoff. The main sources of these contaminants are vehicle emission, mostly through wear and leakage, although erosion of the road surface and de-icing salts are also recognised pollution sources. The bioavailability of these toxic compounds, and more importantly their potential biomagnification along food chains, could affect aquatic communities persistently exposed to road runoff. Several internationally approved abatement technologies are available for the management of road runoff on new motorway schemes. Recent studies conducted in Cork and Dublin, Ireland demonstrated the efficacy of infiltration trenches as abatement technologies in the removal of both heavy metals and PAHs prior to discharge; the technology was however inefficient in mitigating first flush events. Gully traps with sedimentation chambers, another technology investigated, demonstrated to have a substantially lower removal potential but appeared to be more effective in attenuating surges of contaminants attributed to first flush events. Consequently the employment of combined abatement techniques could efficiently minimise deviations from required effluent concentrations. The studies determined a relatively stationary accumulation of heavy metals and PAHs in sediments close to the point of discharge with a rapid decline in concentration in nearby downstream sediments (<50m). Further, Microtox® Solid Phase testing reported a negligible impact on assemblages exposed to contaminated sediments for all sites investigated. This paper describes pollutant loading from road runoff and mitigation measures from a freshwater deterioration in a water quality perspective. The results and analysis of field samples collected adjacent to a number of roads and motorways in Ireland is also presented. Finally sustainable drainage systems, abatement techniques and technologies available for onsite treatment of runoff are presented to improve and mitigate impacts of vehicular transport on the environment.