905 resultados para manufacture productivity
Resumo:
Background: Currently in the Australian higher education sector higher productivity from allied health clinical education placements are a contested issue. This paper will report results of a study that investigated output changes associated with occupational therapy and nutrition/dietetics clinical education placements in Queensland, Australia. Supervisors’ and students’ time use during placements and how this changes for supervisors compared to when students are not present in the workplace is also presented. Methodology/Principal Findings: A cohort design was used with students from four Queensland universities, and their supervisors employed by Queensland Health. There was an increasing trend in the number of occasions of service delivered when the students were present, and a statistically significant increase in the daily mean length of occasions of service delivered during the placement compared to pre-placement levels. For project-based placements that were not directly involved in patient care, supervisors’ project activity time decreased during placements, with students undertaking considerably more time in project activities. Conclusions/Significance: A novel method for estimating productivity and time use changes during clinical education programs for allied health disciplines has been applied. During clinical education placements there was a net increase in outputs, suggesting supervisors engage in longer consultations with patients for the purpose of training students, while maintaining patient numbers. Other activities are reduced. This paper is the first time these data have been shown and form a good basis for future assessments of the economic impact of student placements for allied health disciplines.
Resumo:
A co-precipitation process for large-scale manufacture of bismuth-based HTSC powders has been demonstrated. Powders manufactured by this process have a high phase purity and precisely reproducible stoichiometry. Controlled time and temperature variations are used to convert precursors to HTSC compounds and to obtain specific particle-size distributions. The process has been demonstrated for a variety of compositions in the BSCCO system. Electron microscopy X-ray diffraction, inductively coupled plasma spectroscopy and magnetic-susceptibility measurements are used to characterize the powders.
Resumo:
This work presents an assessment of the coprecipitation technique for the reliable production of high-temperature superconducting (HTS) copper-oxide powders in quantities scaled up to 1 kg. This process affords precise control of cation stoichiometry (< 4% relative), occurs rapidly (almost instantaneously) and can be suitably developed for large-scale (e.g. tonne) manufacture of HTS materials. The process is based upon a simple control of the chemistry of the cation solution and precipitation with oxalic acid. This coprecipitation method is applicable to all copper-oxides and has been demonstrated in this work using over thirty separate experiments for the following compositions: YBa2Cu3O7-δ, Y2BaCuO5 and YBa2Cu4O8. The precursor powders formed via this coprecipitation process are fine-grained (∼ 5-10 nm), chemically homogeneous at the nanometer scale and reactive, Conversion to phase-pure HTS powders can therefore occur in minutes at appropriate firing temperatures. © 1995.
Resumo:
Quantities of Y2BaCuO5 powder greater than 500g have been manufactured by a co-precipitation process. By suitable heat treatments, the particle size of these powders can be varied from 5µm to less than 500nm. Sub-micrometer size powders may, under some conditions, have a duller green colour which is attributed to <2% unreacted material. However, after re-grinding and re-firing of this powder, high-purity powders can be achieved without significant grain growth. Inductively coupled plasma (ICP) spectroscopy is used to measure the stoichiometry of the powders and X-ray diffraction is used to determine phase purity. In both cases, the bulk composition is consistent with Y2BaCuO5 and phase purity is considered better than 95%.
Resumo:
Many construction industry decision-makers believe there is a lack of off-site manufacture (OSM) adoption for non-residential construction in Australia. Identification of construction business process was considered imperative in order to assist decision-makers to increase OSM utilisation. The premise that domain knowledge can be re-used to provide an intervention point in the construction process led a team of researchers to construct simple base-line process models for the complete construction process, segmented into six phases. Sixteen domain knowledge industry experts were asked to review the construction phase base-line models to answer the question “Where in the process illustrated by this base-line model phase is an OSM task?”. Through an iterative and generative process a number of off-site manufacture intervention points were identified and integrated into the process models. The re-use of industry expert domain knowledge provided suggestions for new ways to do basic tasks thus facilitating changes to current practice. It is expected that implementation of the new processes will lead to systemic industry change and thus a growth in productivity due to increased adoption of OSM.
Resumo:
Aim This study aimed to demonstrate how supervisors and students use their time during the three domains of nutrition and dietetic clinical placement and to what extent patient care and non-patient activities change during placement compared to pre- and post- placement. Methods A cohort survey design was used with students from two Queensland universities, and their supervisors in 2010. Participants recorded their time use in either a paper-based or an electronic survey. Supervisors’ and students’ time-use was calculated as independent daily means according to time use categories reported over the length of the placement. Mean daily number of occasions of service, length of occasions of service, project and other time use in minutes was reported as productivity output indicators and the data imputed. A linear mixed modelling approach was used to describe the relationship between the stage of placement and time use in minutes. Results Combined students’ (n= 21) and supervisors’ (n=29) time use as occasions of service or length of occasions of service in patient care activities were significantly different pre, during and post placement. On project-based placements in food service management and community public health nutrition, supervisors’ project activity time significantly decreased during placements with students undertaking more time in project activities. Conclusions This study showed students do not reduce occasions of service in patient care and they enhance project activities in food service and community public health nutrition while on placement. A larger study is required to confirm these results.
Resumo:
This paper seeks to explain the lagging productivity in Singapore’s manufacturing noted in the statements of the Economic Strategies Committee Report 2010. Two methods are employed: the Malmquist productivity to measure total factor productivity (TFP) change and Simar and Wilson’s (2007) bootstrapped truncated regression approach which first derives bias-corrected efficiency estimates before being regressed against explanatory variables to help quantify sources of inefficiencies. The findings reveal that growth in total factor productivity was attributed to efficiency change with no technical progress. Sources of efficiency were attributed to quality of worker and flexible work arrangements while the use of foreign workers lowered efficiency.
Resumo:
This study models the joint production of desirable and undesirable output production (that is, CO2 emissions) of airlines. The Malmquist-Luenberger productivity index is employed to measure productivity growth when undesirable output production is regulated and unregulated. The results show that pollution abatement activities of airlines lowers productivity growth which suggests the traditional approach of measuring productivity growth, which ignores CO2 emissions, overstate "true" productivity growth.
Resumo:
It is well-known that the use of off-site manufacture (OSM) techniques can assist in timely completion of a construction project though the utilisation of such techniques may have other disadvantages. Currently, OSM uptake within the Australian construction industry is limited. To successfully incorporate OSM practices within a construction project, it is crucial to understand the impact of OSM adoption on the processes used during a construction project. This paper presents how a systematic process-oriented approach may be able to support OSM utilisation within a construction project. Process modelling, analysis and automation techniques which are well-known within the Business Process Management (BPM) discipline have been applied to develop a collection of construction process models that represent the end-to-end generic construction value chain. The construction value chain enables researchers to identify key activities, resources, data, and stakeholders involved in construction processes in each defined construction phase. The collection of construction process models is then used as a basis for identification of potential OSM intervention points in collaboration with domain experts from the Australian construction industry. This ensures that the resulting changes reflect the needs of various stakeholders within the construction industry and have relevance in practice. Based on the input from the domain experts, these process models are further refined and operational requirements are taken into account to develop a prototype process automation (workflow) system that can support and coordinate OSM-related process activities. The resulting workflow system also has the potential to integrate with other IT solutions used within the construction industry (e.g., BIM, Acconex). As such, the paper illustrates the role that process-oriented thinking can play in assisting OSM adoption within the industry.
Resumo:
Rigid lenses, which were originally made from glass (between 1888 and 1940) and later from polymethyl methacrylate or silicone acrylate materials, are uncomfortable to wear and are now seldom fitted to new patients. Contact lenses became a popular mode of ophthalmic refractive error correction following the discovery of the first hydrogel material – hydroxyethyl methacrylate – by Czech chemist Otto Wichterle in 1960. To satisfy the requirements for ocular biocompatibility, contact lenses must be transparent and optically stable (for clear vision), have a low elastic modulus (for good comfort), have a hydrophilic surface (for good wettability), and be permeable to certain metabolites, especially oxygen, to allow for normal corneal metabolism and respiration during lens wear. A major breakthrough in respect of the last of these requirements was the development of silicone hydrogel soft lenses in 1999 and techniques for making the surface hydrophilic. The vast majority of contact lenses distributed worldwide are mass-produced using cast molding, although spin casting is also used. These advanced mass-production techniques have facilitated the frequent disposal of contact lenses, leading to improvements in ocular health and fewer complications. More than one-third of all soft contact lenses sold today are designed to be discarded daily (i.e., ‘daily disposable’ lenses).
Resumo:
The 21st century will see monumental change. Either the human race will use its knowledge and skills and change the way it interacts with the environment, or the environment will change the way it interacts with its inhabitants. In the first case, the focus of this book, we would see our sophisticated understanding in areas such as physics, chemistry, engineering, biology, planning, commerce, business and governance accumulated over the last 1,000 years brought to bear on the challenge of dramatically reducing our pressure on the environment. The second case however is the opposite scenario, involving the decline of the planet’s ecosystems until they reach thresholds where recovery is not possible, and following which we have no idea what happens. For instance, if we fail to respond to Sir Nicolas Stern’s call to meet appropriate stabilisation trajectories for greenhouse gas emissions, and we allow the average temperature of our planets surface to increase by 4-6 degrees Celsius, we will see staggering changes to our environment, including rapidly rising sea level, withering crops, diminishing water reserves, drought, cyclones, floods… allowing this to happen will be the failure of our species, and those that survive will have a deadly legacy. In this update to the 1997 International Best Seller, Factor Four, Ernst von Weizsäcker again leads a team to present a compelling case for sector wide advances that can deliver significant resource productivity improvements over the coming century. The purpose of this book is to inspire hope and to then inform meaningful action in the coming decades to respond to the greatest challenge our species has ever faced – that of living in harmony with our planet and its other inhabitants.
Resumo:
When the acronym of ëBRICí was coined in 2001 by Jim OíNeill of Goldman Sachs, it was expected that economic growth rates in India, Brazil and Russia would eventually catch up with that of China. However, China has continued to outperform the other economies in the group, even after it was renamed ëBRICSí to reflect the inclusion of South Africa in 2010. The focus of this chapter is on one of the BRICS economies, namely India. Its aim is to examine from an economic perspective, why Indiaís performance has not lived up to expectations, and comment on the key challenges it faces in meeting them. We begin with some descriptive statistics regarding the progress of the Indian economy since 1990. While it has been growing at a rapid rate since the reforms it introduced in the1990s, there has been a slowdown in its overall GDP growth rates since 2008. The rate of growth experienced in the period 2003ñ07 was an average of 10.5 per cent. However, since the recession following the Global Financial Crisis (GFC) of 2008, the growth rate has fallen. From the period 2008ñ12 it has only registered an average growth rate of 6.5 per cent (World Bank, 2013). This chapter suggests that one of the major factors underpinning this slowdown is the performance of Indiaís agricultural sector. The importance of the agricultural sector is highlighted by the following stylized facts.