973 resultados para diesel-electric system


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Elétrica - FEIS

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Elétrica - FEIS

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The objective of this work is to conduct a comparative study between the fuse key and the single-phase seccionalizador, which are protective equipment used in an electricity distribution networks. This study has also the purpose to reduce the number of electrical power breakdown. Distribution networks are not free from faults, disturbances and failures, then the occurrence of adversities on the network, which may be transient or permanent faults, results in the interruption of electric power. Thus, there are protective systems of distribution networks, which aims to ensure that the electric system continues to function. The incidence of transient faults in the distribution network of this electricity company was used to generate immediate shutdown of customers due to the bad use of fuses as protective equipment by the reclosers. With the use of the fuse switch in the distribution network, there was the immediate shutdown of customers, however, using the single-phase seccionalizador as protective equipment by the reclosers, there are three attempts to restart the electricity power. As the attempts to restart the electricity power are able to eliminate a transient fault, not causing shutdown of any costumer, with the implementation of single-phase sectionalizers to replace the fuses, the number of company shutdowns due to transient faults was reduced by 47.6%

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The objective of this work is to conduct a comparative study between the fuse key and the single-phase seccionalizador, which are protective equipment used in an electricity distribution networks. This study has also the purpose to reduce the number of electrical power breakdown. Distribution networks are not free from faults, disturbances and failures, then the occurrence of adversities on the network, which may be transient or permanent faults, results in the interruption of electric power. Thus, there are protective systems of distribution networks, which aims to ensure that the electric system continues to function. The incidence of transient faults in the distribution network of this electricity company was used to generate immediate shutdown of customers due to the bad use of fuses as protective equipment by the reclosers. With the use of the fuse switch in the distribution network, there was the immediate shutdown of customers, however, using the single-phase seccionalizador as protective equipment by the reclosers, there are three attempts to restart the electricity power. As the attempts to restart the electricity power are able to eliminate a transient fault, not causing shutdown of any costumer, with the implementation of single-phase sectionalizers to replace the fuses, the number of company shutdowns due to transient faults was reduced by 47.6%

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Discute-se neste artigo a possibilidade que se abre ao Brasil, de – graças a seus imensos potenciais hídrico e eólico – produzir, de forma renovável e sustentável, toda a energia elétrica que consome atualmente e consumirá a partir de 2050, quando, segundo o IBGE, a população estará estabilizada em 215 milhões de habitantes.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

La situación actual del mercado energético en España y el imparable aumento de las tasas por parte de las eléctricas, está fomentando la búsqueda de fuentes de energía alternativas que permitan a la población poder abastecerse de electricidad, sin tener que pagar unos costes tan elevados. Para cubrir esta necesidad, la energía fotovoltaica y sobretodo el autoconsumo con inyección a red o balance neto, está adquiriendo cada vez más importancia dentro del mundo energético. Pero la penetración de esta tecnología en la Red Eléctrica Española tiene un freno, la desconfianza por parte del operador de la red, ya que la fotovoltaica es una fuente de energía intermitente, que puede introducir inestabilidades en el sistema en caso de alta penetración. Por ello se necesita ganar la confianza de las eléctricas, haciendo que sea una energía predecible, que aporte potencia a la red eléctrica cuando se le pida y que opere participando en la regulación de la frecuencia del sistema eléctrico. Para tal fin, el grupo de investigación de Sistemas Fotovoltaicos, perteneciente al IES de la UPM, está llevando a cabo un proyecto de investigación denominado PV CROPS, financiado por la Comisión Europea, y que tiene por objetivo desarrollar estas estrategias de gestión. En este contexto, el objetivo de este Proyecto Fin de Carrera consiste en implementar un Banco de Ensayos con Integración de Baterías en Sistemas FV Conectados a Red, que permita desarrollar, ensayar y validar estas estrategias. Aprovechando la disponibilidad para usar el Hogar Digital, instalado en la EUITT de la UPM, hemos montado el banco de ensayos en un laboratorio contiguo, y así, poder utilizar este Hogar como un caso real de consumos energéticos de una vivienda. Este banco de ensayos permitirá obtener información de la energía generada por la instalación fotovoltaica y del consumo real de la "casa" anexa, para desarrollar posteriormente estrategias de gestión de la electricidad. El Banco de Ensayos está compuesto por tres bloques principales, interconectados entre sí:  Subsistema de Captación de Datos y Comunicación. Encargado de monitorizar los elementos energéticos y de enviar la información recopilada al Subsistema de Control. Formado por analizadores de red eléctrica, monofásicos y de continua, y una pasarela orientada a la conversión del medio físico Ethernet a RS485.  Subsistema de Control. Punto de observación y recopilación de toda la información que proviene de los elementos energéticos. Es el subsistema donde se crearán y se implementarán estrategias de control energético. Compuesto por un equipo Pxie, controlador empotrado en un chasis de gama industrial, y un equipo PC Host, compuesto por una workstation y tres monitores.  Subsistema de Energía. Formado por los elementos que generan, controlan o consumen energía eléctrica, en el Banco de Ensayos. Constituido por una pérgola FV, un inversor, un inversor bidireccional y un bloque de baterías. El último paso ha sido llevar a cabo un Ejemplo de Aplicación Práctica, con el que hemos probado que el Banco de Ensayos está listo para usarse, es operativo y completamente funcional en operaciones de monitorización de generación energética fotovoltaica y consumo energético. ABSTRACT. The current situation of the energetic market in Spain and the unstoppable increase of the tax on the part of the electrical companies, is promoting the search of alternative sources of energy that allow to the population being able to be supplied of electricity, without having to pay so high costs. To meet this need, the photovoltaic power and above all the self-consumption with injection to network, it is increasingly important inside the energetic world. It allows to the individual not only to pay less for the electricity, in addition it allows to obtain benefits for the energy generated in his own home. But the penetration of this technology in the Electrical Spanish Network has an obstacle, the distrust on the part of the operator of the electrical network, due to the photovoltaic is an intermittent source of energy, which can introduce instabilities in the system in case of high penetration. Therefore it´s necessary to reach the confidence of the electricity companies, making it a predictable energy, which provides with power to the electrical network whenever necessary and that operates taking part in the regulation of the frequency of the electric system. For such an end, the group of system investigation Photovoltaic, belonging to the IES of the UPM, there is carrying out a project of investigation named PV CROPS, financed by the European Commission, and that has for aim to develop these strategies of management. In this context, the objective of this Senior Thesis consists in implementing a Bank of Tests with Integration of Batteries in Photovoltaic Systems Connected to Network, which allows developing, testing and validating these strategies. Taking advantage of the availability to use the Digital Home installed in the EUITT of the UPM, we have mounted the bank of tests in a contiguous laboratory to use this Home as a real case of energetic consumptions of a house. This bank of tests will allow obtaining information of the energy generated by the photovoltaic installation and information of the royal consumption of the attached "house", to develop later strategies of management of the electricity. The Bank of Tests is composed by three principal blocks, interconnected each other:  Subsystem of Gathering of data and Communication. In charge of monitoring the energetic elements and sending the information compiled to the Subsystem of Control. Formed by power analyzers, AC and DC, and a gateway for the conversion of the Ethernet physical medium to RS485.  Subsystem of Control. Point of observation and compilation of all the information that comes from the energetic elements. It is the subsystem where there will be created and there will be implemented strategies of energetic control. Composed of a Pxie, controller fixed in an industrial range chassis, and a PC Host, formed by a workstation and three monitors.  Subsystem of Energy. Formed by the elements of generating, controlling or consuming electric power, in the Bank of Tests. Made of photovoltaic modules, an inverter, a twoway inverter and a batteries block. The last step has been performing an Example of Practical Application we have proved that the Bank of Tests is ready to be used, it´s operative and fully functional in monitoring operations of energetic photovoltaic generation and energetic consumption.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Este proyecto trata de completar un estudio sobre la viabilidad de una instalación de turbina de eje vertical, en una azotea de un edificio de 6 plantas en el centro de la ciudad de Madrid. Está basado en la comunidad de vecinos de la calle de Lagasca 106 de Madrid, y se realiza de forma global, con objeto de que sirva como ejemplo a futuros estudios a realizar en esta área, incluyendo todas las dificultades y problemas que este tipo de proyectos muestran en su viabilidad. Los aspectos que vamos a abordar son: Demostración de que una turbina de eje vertical es más indicada e idónea para estos casos que una turbina de eje horizontal. Capacidad de generación eléctrica de la instalación que proponemos. Problemas asociados con la actual legislación. Problemas relacionados con la instalación eléctrica: el inversor de corriente, la decisión de utilizar un sistema de baterías, conectar el aerogenerador a la red o buscar un sistema mixto. La viabilidad económica de la instalación. ABSTRACT This project tries to complete a study on the viability of a vertical axis turbines installation in the roof of a “standard” 6 floors building in the center of Madrid. Besides, the project is based on the building situated in Lagasca 106, it pretends to be done in a “global” mode, in order to be an example of future projects, and include as many usual problems and items that this kind of projects could have to afford. These problems and issues are: the substantiation of the choice of the vertical axis turbine instead of a usual horizontal axis turbine, the model and the power capacity of this turbine. The turbines installation energy saving capacity. Problems associated to the legislation that we may to afford. And problems related to the electric installation, such us, transformer associated to the turbine, the decision of link the turbine with batteries or joining it directly to the building electric system. Also we have to set a programming system in order to monitor the different situations that the turbine has to work

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Forecasting the AC power output of a PV plant accurately is important both for plant owners and electric system operators. Two main categories of PV modeling are available: the parametric and the nonparametric. In this paper, a methodology using a nonparametric PV model is proposed, using as inputs several forecasts of meteorological variables from a Numerical Weather Forecast model, and actual AC power measurements of PV plants. The methodology was built upon the R environment and uses Quantile Regression Forests as machine learning tool to forecast AC power with a confidence interval. Real data from five PV plants was used to validate the methodology, and results show that daily production is predicted with an absolute cvMBE lower than 1.3%.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Este trabalho apresenta um modelo de otimização multiobjetivo aplicado ao projeto de concepção de submarinos convencionais (i.e. de propulsão dieselelétrica). Um modelo de síntese que permite a estimativa de pesos, volume, velocidade, carga elétrica e outras características de interesse para a o projeto de concepção é formulado. O modelo de síntese é integrado a um modelo de otimização multiobjetivo baseado em algoritmos genéticos (especificamente, o algoritmo NSGA II). A otimização multiobjetivo consiste na maximização da efetividade militar do submarino e na minimização de seu custo. A efetividade militar do submarino é representada por uma Medida Geral de Efetividade (OMOE) estabelecida por meio do Processo Analítico Hierárquico (AHP). O Custo Básico de Construção (BCC) do submarino é estimado a partir dos seus grupos de peso. Ao fim do processo de otimização, é estabelecida uma Fronteira de Pareto composta por soluções não dominadas. Uma dessas soluções é selecionada para refinamento preliminar e os resultados são discutidos. Subsidiariamente, esta dissertação apresenta discussão sucinta sobre aspectos históricos e operativos relacionados a submarinos, bem como sobre sua metodologia de projeto. Alguns conceitos de Arquitetura Naval, aplicada ao projeto dessas embarcações, são também abordados.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Section 16 not yet published.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper presents an assessment of the technical and economic performance of thermal processes to generate electricity from a wood chip feedstock by combustion, gasification and fast pyrolysis. The scope of the work begins with the delivery of a wood chip feedstock at a conversion plant and ends with the supply of electricity to the grid, incorporating wood chip preparation, thermal conversion, and electricity generation in dual fuel diesel engines. Net generating capacities of 1–20 MWe are evaluated. The techno-economic assessment is achieved through the development of a suite of models that are combined to give cost and performance data for the integrated system. The models include feed pretreatment, combustion, atmospheric and pressure gasification, fast pyrolysis with pyrolysis liquid storage and transport (an optional step in de-coupled systems) and diesel engine or turbine power generation. The models calculate system efficiencies, capital costs and production costs. An identical methodology is applied in the development of all the models so that all of the results are directly comparable. The electricity production costs have been calculated for 10th plant systems, indicating the costs that are achievable in the medium term after the high initial costs associated with novel technologies have reduced. The costs converge at the larger scale with the mean electricity price paid in the EU by a large consumer, and there is therefore potential for fast pyrolysis and diesel engine systems to sell electricity directly to large consumers or for on-site generation. However, competition will be fierce at all capacities since electricity production costs vary only slightly between the four biomass to electricity systems that are evaluated. Systems de-coupling is one way that the fast pyrolysis and diesel engine system can distinguish itself from the other conversion technologies. Evaluations in this work show that situations requiring several remote generators are much better served by a large fast pyrolysis plant that supplies fuel to de-coupled diesel engines than by constructing an entire close-coupled system at each generating site. Another advantage of de-coupling is that the fast pyrolysis conversion step and the diesel engine generation step can operate independently, with intermediate storage of the fast pyrolysis liquid fuel, increasing overall reliability. Peak load or seasonal power requirements would also benefit from de-coupling since a small fast pyrolysis plant could operate continuously to produce fuel that is stored for use in the engine on demand. Current electricity production costs for a fast pyrolysis and diesel engine system are 0.091/kWh at 1 MWe when learning effects are included. These systems are handicapped by the typical characteristics of a novel technology: high capital cost, high labour, and low reliability. As such the more established combustion and steam cycle produces lower cost electricity under current conditions. The fast pyrolysis and diesel engine system is a low capital cost option but it also suffers from relatively low system efficiency particularly at high capacities. This low efficiency is the result of a low conversion efficiency of feed energy into the pyrolysis liquid, because of the energy in the char by-product. A sensitivity analysis has highlighted the high impact on electricity production costs of the fast pyrolysis liquids yield. The liquids yield should be set realistically during design, and it should be maintained in practice by careful attention to plant operation and feed quality. Another problem is the high power consumption during feedstock grinding. Efficiencies may be enhanced in ablative fast pyrolysis which can tolerate a chipped feedstock. This has yet to be demonstrated at commercial scale. In summary, the fast pyrolysis and diesel engine system has great potential to generate electricity at a profit in the long term, and at a lower cost than any other biomass to electricity system at small scale. This future viability can only be achieved through the construction of early plant that could, in the short term, be more expensive than the combustion alternative. Profitability in the short term can best be achieved by exploiting niches in the market place and specific features of fast pyrolysis. These include: •countries or regions with fiscal incentives for renewable energy such as premium electricity prices or capital grants; •locations with high electricity prices so that electricity can be sold direct to large consumers or generated on-site by companies who wish to reduce their consumption from the grid; •waste disposal opportunities where feedstocks can attract a gate fee rather than incur a cost; •the ability to store fast pyrolysis liquids as a buffer against shutdowns or as a fuel for peak-load generating plant; •de-coupling opportunities where a large, single pyrolysis plant supplies fuel to several small and remote generators; •small-scale combined heat and power opportunities; •sales of the excess char, although a market has yet to be established for this by-product; and •potential co-production of speciality chemicals and fuel for power generation in fast pyrolysis systems.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Dissertação para obtenção do grau de Mestre em Engenharia Electrotécnica Ramo de energia

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Aiming to analyze the monitoring of the atmospheric discharges incidence, the concession area of Companhia Forca e Luz do Oeste (CFLO) - Western Power and Light Company, located in the district of Guarapuava, state of Parana was chosen for a study developed in 2003, from January to December. After the air masses dynamics description, it was possible to identify the occurrence of atmospheric discharges and to compare them to the energy interruptions. To that end, atmospheric discharges density maps were created within the CFLO concession area for a later analysis of their influence in the electric energy supply. The monitoring of the atmospheric discharges and the comparison between this phenomenon and the occurrence of interruptions in the electric energy supply enabled this study. Results showed that such events are directly related, and that the rural area of the region under study underwent a major interference.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The use of renewable energies as a response to the EU targets defined for 2030 Climate Change and Energy has been increasing. Also non-dispatchable and intermittent renewable energies like wind and solar cannot generally match supply and demand, which can also cause some problems in the grid. So, the increased interest in energy storage has evolved and there is nowadays an urgent need for larger energy storage capacity. Compressed Air Energy Storage (CAES) is a proven technology for storing large quantities of electrical energy in the form of high-pressure air for later use when electricity is needed. It exists since the 1970’s and is one of the few energy storage technologies suitable for long duration (tens of hours) and utility scale (hundreds to thousands of MW) applications. It is also one of the most cost-effective solutions for large to small scale storage applications. Compressed Air Energy Storage can be integrated and bring advantages to different levels of the electric system, from the Generation level, to the Transmission and Distribution levels, so in this paper a revisit of CAES is done in order to better understand what and how it can be used for our modern needs of energy storage.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The large penetration of intermittent resources, such as solar and wind generation, involves the use of storage systems in order to improve power system operation. Electric Vehicles (EVs) with gridable capability (V2G) can operate as a means for storing energy. This paper proposes an algorithm to be included in a SCADA (Supervisory Control and Data Acquisition) system, which performs an intelligent management of three types of consumers: domestic, commercial and industrial, that includes the joint management of loads and the charge/discharge of EVs batteries. The proposed methodology has been implemented in a SCADA system developed by the authors of this paper – the SCADA House Intelligent Management (SHIM). Any event in the system, such as a Demand Response (DR) event, triggers the use of an optimization algorithm that performs the optimal energy resources scheduling (including loads and EVs), taking into account the priorities of each load defined by the installation users. A case study considering a specific consumer with several loads and EVs is presented in this paper.