990 resultados para construction productivity


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The aim of this paper is to identify and classify the numerous managerial issues encountered in the management of personnel in confined site construction. For the purpose of this research, a confined construction site is defined as a site where permanent works fit the site footprint, extending to levels above and/or below ground level, leaving spatial restrictions for other operations (e.g. plant and material movements, materials storage and temporary accommodation etc.) and require effective resource co-ordination beyond normal on-site management input. A literature review and analysis, case studies incorporating interviews and focus groups along with a questionnaire survey were used in order to gain a comprehensive insight into the issues in the management of personnel in a confined construction site environment. The following are the top five leading issues highlighted in the management of personnel in confined site construction; (1) Accidents due to an untidy site, (2) One contractor holding up another because of the lack of space, (3) A risk to personnel because of vehicular traffic on-site, (4) Difficult to facilitate several contractors at one work location, and (5) Numerous personnel working within the one space. In today’s modern environment, spatial restrictions are quickly becoming the norm in the industry. Therefore, the management of personnel on-site becomes progressively more difficult with the decrease in available space on-site. Where such environments exist, acknowledging the numerous issues highlighted above, aids site management in the supervision and co-ordination of personnel on-site, thus reducing accidents, increasing productivity and increase profit margins, in spatially restricted environments. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of personnel on a confined construction site is achievable. By identifying the numerous issues, on-site management can proactively mitigate such issues through adopting counteractive measures and through successful identification of the traits identified.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The overall aim of this research is to identify and catalogue the numerous managerial strategies for effective management of health and safety on a confined, urban, construction site. A mixed methods methodology was adopted using interviews and focus group discussions on three selected case studies of confined construction sites. In addition to these, a questionnaire survey was used based on the findings from the interviews and the focus group discussions. The top five key strategies include (1) Employ safe system of work plans to mitigate personnel health and safety issues; (2) Inform personnel, before starting on-site, of the potential issues using site inductions; (3) Effective communication among site personnel; (4) Draft and implement an effective design site layout prior to starting on-site; and (5) Use of banksman (traffic co-ordinator) to segregate personnel from vehicular traffic. The construction sector is one of the leading industries in accident causation and with the continued development and regeneration of our urban centres, confined site construction is quickly becoming the norm - an environment which only fuels accident creation within the construction sector. This research aids on-site management that requires direction and assistance in the identification and implementation of key strategies for the management of health and safety, particularly in confined construction site environments.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Construction Design and Management (CDM) Regulations (2007) is one of the most important set of health and safety regulations in the construction industry today. The aim of this research is to examine critical success factors for CDM compliance in small to medium size contractors in the UK construction industry. The objectives of the research include the identification of critical barriers in doing so along with the identification of success factors where CDM is incorporated. A mixed method approach is adopted in the identification and categorisation of the various factors encompassing a literature review, interviews and questionnaire survey. The key finding which emerge is the lack of knowledge and understanding with regards the CDM regulations with the recommendation to encourage small and medium contractor compliance through illustrating the benefits attainable. The practicality of the research is evident based on the significant uptake in the CDM by larger contractors, yet the research indicates that further insight and guidance is required to educate and inform those working within small to medium sized contractors in the UK. Where such acknowledgement and compliance is adopted, it is envisaged that this sector will benefit from reduced incidents and accidents, increased productivity while ultimately leading to a safer and more productive industry as a whole.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Considering the confined and complex nature of urban construction projects, labor productivity is one of the key factors attributing to project success. With the proliferation of sub-contracted labor, there is a necessity to consider the ramifications of this practice to the sector. This research aims to outline how project managers can optimise productivity levels of sub-contracted labor in urban construction projects, by addressing the barriers that most restrict these efficiency levels. A qualitative research approach is employed, incorporating semi-structured interviews based on three case studies from an urban context. The results are scrutinised using mind mapping software and accompanying analytical techniques. The findings from this research indicate that the effective on-site management of sub-contracted labor has a significant impact on the degree of success of an urban development project. The two core barriers to sub-contracted labor productivity are; 1) ineffective supervision of sub-contracted labor, and 2) lack of skilled sub-contracted labor. The implication of this research is that on-site project management play an integral role in the level of productivity achieved by sub-contracted labor in urban development projects. Therefore, on-site management situated in urban, confined construction sites, are encouraged to take heed of the findings herein and address the barriers documented. The value of this research is obtained through consideration of the critical factors; construction management professionals can mitigate such barriers, in order to optimise subcontracted labor productivity on-site.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

L’adénovirus possède plusieurs caractéristiques faisant de ce virus un candidat de choix pour la construction de vecteurs utiles dans les études de génomique fonctionnelle. Dans la majorité de ces applications, on a recours à un vecteur adénoviral de première génération délété de sa région E1. L’utilisation de vecteurs adénoviraux comprend deux maillons faibles : la construction du vecteur et la production subséquente de ce dernier. Le développement de méthodes alternatives est donc nécessaire pour renforcer ces deux maillons, permettant ainsi une utilisation étendue de ces vecteurs. Ce développement va s’articuler sur deux axes : l’ingénierie du vecteur de transfert pour la construction de l’adénovirus recombinant et l’ingénierie d’une lignée cellulaire pour la production du vecteur. En utilisant un vecteur de transfert adénoviral co-exprimant, à partir d’un promoteur régulable à la tétracycline, la protéase de l’adénovirus et une protéine de fluorescence verte (GFP) par l’intermédiaire d’un site d’entrée ribosomal interne (IRES), notre groupe a établi que la sélection positive, via l’expression ectopique de la protéase, est un processus efficace pour la création de librairie d’adénovirus recombinants. Par contre, la diversité atteinte dans ce premier système est relativement faible, environ 1 adénovirus recombinant par 1 000 cellules. Le travail effectué dans le cadre de cette thèse vise à construire un nouveau transfert de vecteur dans lequel l’expression de la protéase sera indépendante de celle du transgène permettant ainsi d’optimiser l’expression de la protéase. Ce travail d’optimisation a permis de réduire le phénomène de transcomplémentation du virus parental ce qui a fait grimper la diversité à 1 virus recombinant par 75 cellules. Ce système a été mis à l’épreuve en générerant une librairie adénovirale antisens dirigée contre la GFP. La diversité de cette librairie a été suffisante pour sélectionner un antisens réduisant de 75% l’expression de la GFP. L’amplification de ce vecteur adénoviral de première génération doit se faire dans une lignée cellulaire exprimant la région E1 telle que les cellules 293. Par contre, un adénovirus de première génération se répliquant dans les cellules 293 peut échanger, par recombinaison homologue, son transgène avec la région E1 de la cellule créant ainsi un adénovirus recombinant réplicatif (RCA), compromettant ainsi la pureté des stocks. Notre groupe a déjà breveté une lignée cellulaire A549 (BMAdE1) exprimant la région E1, mais qui ne peut pas recombiner avec le transgène du virus. Par contre, le niveau de réplication de l’adénovirus dans les BMAdE1 est sous-optimal, à peine 15-30% du niveau obtenu dans les cellules 293. Le travail fait dans le cadre de cette thèse a permis de mettre en évidence qu’une expression insuffisante d’E1B-55K était responsable de la mauvaise réplication du virus dans les BMAdE1. Nous avons produit de nouveaux clones à partir de la lignée parentale via une transduction avec un vecteur lentiviral exprimant E1B-55K. Nous avons confirmé que certains clones exprimaient une plus grande quantité d’E1B-55K et que ces clones amplifiaient de manière plus efficace un vecteur adénoviral de première génération. Ce clone a par la suite été adapté à la culture en suspension sans sérum.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Sectoral shifts, such as shrinkage of low labour productivity and the low-wage construction sector, can lead to apparent increased aggregate average labour productivity and average wages, especially when capital intensity differs across sectors. For 11 main sectors and 13 manufacturing sub-sectors, we quantify the compositional effects on productivity, wages and unit labour costs (ULCs) based and real effective exchange rates (REER), for 24 EU countries. Compositional effects are greatest in Ireland, where the pharmaceutical sector drives the growth of output and productivity, but other sectors have suffered greatly and have not yet recovered. Our new ULC-REER measurements, which are free from compositional effects, correlate well with export performance. Among the countries facing the most severe external adjustment challenges, Lithuania, Portugal and Ireland have been the most successful based on five indicators, and Latvia, Estonia and Greece the least successful. There is evidence of downward wage flexibility in some countries, but wage cuts have corrected just a small fraction of pre-crisis wage rises and came with massive reductions in employment even in the business sector excluding construction and real estate, highlighting the difficulty of adjusting wages downward.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

As a background document for Bruegel Policy Contribution 2012/11 ‘Compositional effects on productivity, labour cost and export adjustment’, this working paper presents detailed results for 24 EU countries on: • The sectoral changes in the economy; • The unit labour costs (ULC) based real effective exchange rate (REER) and its main components; • Export performance. • The ULC-REERs are calculated: • For the total economy, the business sector (excluding agriculture, construction and real estate activities), and some main sectors; • Using both actual aggregates and fixed-weight aggregates, as the latter are free from the impacts of compositional changes; • Against 30 trading partners and against three subsets of trading partners: euro-area, non-euro area EU, non-EU.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Planning is a vital element of project management but it is still not recognized as a process variable. Its objective should be to outperform the initially defined processes, and foresee and overcome possible undesirable events. Detailed task-level master planning is unrealistic since one cannot accurately predict all the requirements and obstacles before work has even started. The process planning methodology (PPM) has thus been developed in order to overcome common problems of the overwhelming project complexity. The essential elements of the PPM are the process planning group (PPG), including a control team that dynamically links the production/site and management, and the planning algorithm embodied within two continuous-improvement loops. The methodology was tested on a factory project in Slovenia and in four successive projects of a similar nature. In addition to a number of improvement ideas and enhanced communication, the applied PPM resulted in 32% higher total productivity, 6% total savings and created a synergistic project environment.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Generally poor productivity, delays, low profitability and exceeded budgets are Common problems in modern construction management, however it seems that a basic obstacle lies far deeper in the understanding of a firm's fundamental mission, its existence. The main objective of this paper therefore is to examine the operational living of a construction firm and by doing that to reveal the key problem or the solution for a construction firm - its organization. A firm as a social system in which interactions between its constitutive components (employees) are surordinated to its maintenance (keeping a system alive) is an autopoietic social system. Two domains of external perturbations are uncovered to which a construction firm has to adapt (market driven and project driven perturbations). Constructed conceptual model of an autopoietic organization is based upon two necessary and sufficient operational domains that a firm has to create in order to become an autopoietic, adaptive social system. The first one is a domain of interactions between employees and other operationally external systems, which is representing an idea-generating domain of interactions. The second is employee's autonomous operational domain, which embodies employee's autonomy and individuality and represents a necessary condition for the establishment of an idea-generating domain. Finally, it is recognized that interactions within these four domains keep a construction firm alive.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Temperature, relative humidity, and air quality all affect the sensory system via thermo receptors in the skin and the olfactory system. Air quality is mainly defined by the contaminants in the air. However, the most persistent memory of any space is often its odor. Strong, emotional, and past experiences are awakened by the olfactory sense. Odors can also influence cognitive processes that affect creative task performance, as well as personal memories and moods. Besides nitrogen and oxygen, the air contains particles and many chemicals that affect the efficiency of the oxygenation process in the blood, and ultimately the air breathed affects thinking and concentration. It is important to show clients the value of spending more capital on high-quality buildings that promote good ventilation. The process of achieving indoor-air quality is a continual one throughout the design, construction, commissioning, and facilities management processes. This paper reviews the evidence.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The overall significance of the construction and building services sector internationally cannot be overemphasised. In the UK, the industry currently accounts for 10% gross domestic product (GDP) and employs 2 million people, which is more than 1 in 14 of the total workforce. However, regardless of its output (approximately £65 billion annually) there has been a steady decline in the number of trade entrants into the construction and building services sector. Consequently, the available ‘pool of labour’ is inadequately resourced; productivity is low; the existing labour force is overstressed; there is an increase in site deaths; and a long-term labour shortage is envisaged. Today, the evidence seems to suggest that multiskilling is a tentative redress for ameliorating the skills crisis in the construction and building sectors. A 43-year time-series of data on 23 manpower attributes was evaluated as part of this investigation. The developed linear regression models show that the concept of multiskilling obeys the ‘law of diminishing returns'. That is, a weak relation was found between construction output and a three or more combination of manpower attributes. An optimisation model is prescribed for traditional trades.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The link between competitiveness and sustained prosperity of a nation, industry or firm, is a well established argument and serves as the basis for making policy decisions and directing strategic change. The importance of construction industry competitiveness is currently receiving considerable attention from countries such as Finland, Sweden and the UK. This paper critically reviews the existing measures of competitiveness, challenges productivity and profitability as the dominant measures of construction industry competitiveness and introduces a more holistic set of measures that addresses the needs of investors, employees, clients and overall society. The research also reports upon the application of this more holistic set of measures for measuring competitiveness and presents results for the Swedish construction industry. The paper principally sets out to present the preliminary findings of an ongoing research project, which will eventually compare the competitiveness of the Swedish construction industry with that of Finland and the UK.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The construction sector is under growing pressure to increase productivity and improve quality, most notably in reports by Latham (1994, Constructing the Team, HMSO, London) and Egan (1998, Rethinking Construction, HMSO, London). A major problem for construction companies is the lack of project predictability. One method of increasing predictability and delivering increased customer value is through the systematic management of construction processes. However, the industry has no methodological mechanism to assess process capability and prioritise process improvements. Standardized Process Improvement for Construction Enterprises (SPICE) is a research project that is attempting to develop a stepwise process improvement framework for the construction industry, utilizing experience from the software industry, and in particular the Capability Maturity Model (CMM), which has resulted in significant productivity improvements in the software industry. This paper introduces SPICE concepts and presents the results from two case studies conducted on design and build projects. These studies have provided further in-sight into the relevance and accuracy of the framework, as well as its value for the construction sector.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper discusses the development of the Virtual Construction Simulator (VCS) 3 - a simulation game-based educational tool for teaching construction schedule planning and management. The VCS3 simulation game engages students in learning the concepts of planning and managing construction schedules through goal driven exploration, employed strategies, and immediate feedback. Through the planning and simulation mode, students learn the difference between the as-planned and as-built schedules resulting from varying factors such as resource availability, weather and labor productivity. This paper focuses on the development of the VCS3 and its construction physics model. Challenges inherent in the process of identifying variables and their relationships to reliably represent and simulate the dynamic nature of planning and managing of construction projects are also addressed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

With the increase in e-commerce and the digitisation of design data and information,the construction sector has become reliant upon IT infrastructure and systems. The design and production process is more complex, more interconnected, and reliant upon greater information mobility, with seamless exchange of data and information in real time. Construction small and medium-sized enterprises (CSMEs), in particular,the speciality contractors, can effectively utilise cost-effective collaboration-enabling technologies, such as cloud computing, to help in the effective transfer of information and data to improve productivity. The system dynamics (SD) approach offers a perspective and tools to enable a better understanding of the dynamics of complex systems. This research focuses upon system dynamics methodology as a modelling and analysis tool in order to understand and identify the key drivers in the absorption of cloud computing for CSMEs. The aim of this paper is to determine how the use of system dynamics (SD) can improve the management of information flow through collaborative technologies leading to improved productivity. The data supporting the use of system dynamics was obtained through a pilot study consisting of questionnaires and interviews from five CSMEs in the UK house-building sector.