982 resultados para building simulation


Relevância:

60.00% 60.00%

Publicador:

Resumo:

The Light Steel Framing building technology was introduced in Brazil in the late 1990s for the construction of residential houses. Because the design system was imported from the United States and is optimised to work well in that temperate climate, some modi fi cations must be made to adapt it for the Brazilian climate. The objective of this paper was to assess the impact of thermal bridging across enclosure elements on the thermal performance of buildings designed with Light Steel Framing in Brazil. The numerical simulation program EnergyPlus and a speci fi c method that considered the effects of metallic structures in the hourly simulations were used for the analysis. Two air-conditioned commercial buildings were used as case studies. The peak thermal load increased approximately 10% when an interior metal frame was included in the numerical simulations compared to non-metallic structures. Even when a metal frame panel was used only for vertical elements in the facade of a building with a conventional concrete structure, the simulations showed a 5% increase in annual energy use.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The representation of the thermal behaviour of the building is achieved through a relatively simple dynamic model that takes into account the effects due to the thermal mass of the building components. The model of a intra-floor apartment has been built in the Matlab-Simulink environment and considers the heat transmission through the external envelope, wall and windows, the internal thermal masses, (i.e. furniture, internal wall and floor slabs) and the sun gain due to opaque and see-through surfaces of the external envelope. The simulations results for the entire year have been compared and the model validated, with the one obtained with the dynamic building simulation software Energyplus.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Energy auditing can be an important contribution for identification and assessment of energy conservation measures (ECMs) in buildings. Numerous tools and software have been developed, with varying degree of precision and complexity and different areas of use.   This paper evaluates PHPP as a versatile, easy-to-use energy auditing tool and gives examples of how it has been compared to a dynamic simulation tool, within the EU-project iNSPiRe. PHPP is a monthly balance energy calculation tool based on EN13790. It is intended for assisting the design of Passive Houses and energy renovation projects and as guidance in the choice of appropriate ECMs.   PHPP was compared against the transient simulation software TRNSYS for a single family house and a multi-family house. It should be mentioned that dynamic building simulations might strongly depend on the model assumptions and simplifications compared to reality, such as ideal heating or real heat emission system. Setting common boundary conditions for both PHPP and TRNSYS, the ideal heating and cooling loads and demands were compared on monthly and annual basis for seven European locations and buildings with different floor area, S/V ratio, U-values and glazed area of the external walls.   The results show that PHPP can be used to assess the heating demand of single-zone buildings and the reduction of heating demand with ECMs with good precision. The estimation of cooling demand is also acceptable if an appropriate shading factor is applied in PHPP. In general, PHPP intentionally overestimates heating and cooling loads, to be on the safe side for system sizing. Overall, the agreement with TRNSYS is better in cases with higher quality of the envelope as in cold climates and for good energy standards. As an energy auditing tool intended for pre-design it is a good, versatile and easy-to-use alternative to more complex simulation tools.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Increased focus on energy cost savings and carbon footprint reduction efforts improved the visibility of building energy simulation, which became a mandatory requirement of several building rating systems. Despite developments in building energy simulation algorithms and user interfaces, there are some major challenges associated with building energy simulation; an important one is the computational demands and processing time. In this paper, we analyze the opportunities and challenges associated with this topic while executing a set of 275 parametric energy models simultaneously in EnergyPlus using a High Performance Computing (HPC) cluster. Successful parallel computing implementation of building energy simulations will not only improve the time necessary to get the results and enable scenario development for different design considerations, but also might enable Dynamic-Building Information Modeling (BIM) integration and near real-time decision-making. This paper concludes with the discussions on future directions and opportunities associated with building energy modeling simulations.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Quality control is considered from the simulator's perspective through comparative simulation of an ultra energy-efficient building with EE4-DOE2.1E and EnergyPlus. The University of Calgary's Leadership in Energy and Environmental Design Platinum Child Development Centre, with a 66% certified energy cost reduction rating, was the case study building. A Natural Resources Canada incentive program required use of EE4 interface with DOE2.1E simulation engine for energy modelling. As DOE2.1E lacks specific features to simulate advanced systems such as radiant cooling in the CDC, an EnergyPlus model was developed to further evaluate these features. The EE4-DOE2.1E model was used for quality control during development of the base EnergyPlus model and simulation results were compared. Advanced energy systems then added to the EnergyPlus model generated small difference in estimated total annual energy use. The comparative simulation process helped identify the main input errors in the draft EnergyPlus model. The comparative use of less complex simulation programs is recommended for quality control when producing more complex models. © 2009 International Building Performance Simulation Association (IBPSA).

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper presents a description of a new agent based elevator sub-model developed as part of the buildingEXODUS software intended for both evacuation and circulation applications. A description of each component of the newly developed model is presented, including the elevator kinematics and associated pedestrian behaviour. The elevator model is then used to investigate a series of full building evacuation scenarios based on a hypothetical 50 floor building with four staircases and a population of 7,840 agents. The analysis explores the relative merits of using up to 32 elevators (arranged in four banks) and various egress strategies to evacuate the entire building population. Findings from the investigation suggest that the most efficient evacuation strategy utilises a combination of elevators and stairs to empty the building and clear the upper half of the building in minimum time. Combined stair elevator evacuation times have been shown to be as much as 50% faster than stair only evacuation times.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The coupled heat, air and moisture transfer between building envelopes and indoor air is complicated, and has a significant influence on the indoor environment and the energy performance of buildings. In the paper, a model for predicting coupled multi-zone hygrothermal-airflow transfer is presented. Both heat and moisture transfer in the building envelope and multi-zone indoor airflow are simultaneously considered; their interactions are modeled. The coupled system model is implemented into Matlab–Simulink, and is validated by using a series of testing tools and experiments. The new program is applied to investigate the moisture transfer effect on indoor air humidity and building energy consumption in different climates (hot-humid, temperate and hot-dry climates). The results show that not accounting for hygrothermal effects in modeling will result in overestimation of energy costs for hot and humid climate situations and possible over sizing of plant leading to inefficient operation.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Design summer years representing near-extreme hot summers have been used in the United Kingdom for the evaluation of thermal comfort and overheating risk. The years have been selected from measured weather data basically representative of an assumed stationary climate. Recent developments have made available ‘morphed’ equivalents of these years by shifting and stretching the measured variables using change factors produced by the UKCIP02 climate projections. The release of the latest, probabilistic, climate projections of UKCP09 together with the availability of a weather generator that can produce plausible daily or hourly sequences of weather variables has opened up the opportunity for generating new design summer years which can be used in risk-based decision-making. There are many possible methods for the production of design summer years from UKCP09 output: in this article, the original concept of the design summer year is largely retained, but a number of alternative methodologies for generating the years are explored. An alternative, more robust measure of warmth (weighted cooling degree hours) is also employed. It is demonstrated that the UKCP09 weather generator is capable of producing years for the baseline period, which are comparable with those in current use. Four methodologies for the generation of future years are described, and their output related to the future (deterministic) years that are currently available. It is concluded that, in general, years produced from the UKCP09 projections are warmer than those generated previously. Practical applications: The methodologies described in this article will facilitate designers who have access to the output of the UKCP09 weather generator (WG) to generate Design Summer Year hourly files tailored to their needs. The files produced will differ according to the methodology selected, in addition to location, emissions scenario and timeslice.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The Chartered Institute of Building Service Engineers (CIBSE) produced a technical memorandum (TM36) presenting research on future climate impacting building energy use and thermal comfort. One climate projection for each of four CO2 emissions scenario were used in TM36, so providing a deterministic outlook. As part of the UK Climate Impacts Programme (UKCIP) probabilistic climate projections are being studied in relation to building energy simulation techniques. Including uncertainty in climate projections is considered an important advance to climate impacts modelling and is included in the latest UKCIP data (UKCP09). Incorporating the stochastic nature of these new climate projections in building energy modelling requires a significant increase in data handling and careful statistical interpretation of the results to provide meaningful conclusions. This paper compares the results from building energy simulations when applying deterministic and probabilistic climate data. This is based on two case study buildings: (i) a mixed-mode office building with exposed thermal mass and (ii) a mechanically ventilated, light-weight office building. Building (i) represents an energy efficient building design that provides passive and active measures to maintain thermal comfort. Building (ii) relies entirely on mechanical means for heating and cooling, with its light-weight construction raising concern over increased cooling loads in a warmer climate. Devising an effective probabilistic approach highlighted greater uncertainty in predicting building performance, depending on the type of building modelled and the performance factors under consideration. Results indicate that the range of calculated quantities depends not only on the building type but is strongly dependent on the performance parameters that are of interest. Uncertainty is likely to be particularly marked with regard to thermal comfort in naturally ventilated buildings.