928 resultados para aircraft maintenance


Relevância:

40.00% 40.00%

Publicador:

Resumo:

"4 January 1983."

Relevância:

40.00% 40.00%

Publicador:

Resumo:

"11 January 1983."

Relevância:

40.00% 40.00%

Publicador:

Resumo:

"2 July 1979."

Relevância:

40.00% 40.00%

Publicador:

Resumo:

"4 January 1983."

Relevância:

40.00% 40.00%

Publicador:

Resumo:

"April 1958."

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Photoprinted.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Aircraft Operators Companies (AOCs) are always willing to keep the cost of a flight as low as possible. These costs could be modelled using a function of the fuel consumption, time of flight and fixed cost (over flight cost, maintenance, etc.). These are strongly dependant on the atmospheric conditions, the presence of winds and the aircraft performance. For this reason, much research effort is being put in the development of numerical and graphical techniques for defining the optimal trajectory. This paper presents a different approach to accommodate AOCs preferences, adding value to their activities, through the development of a tool, called aircraft trajectory simulator. This tool is able to simulate the actual flight of an aircraft with the constraints imposed. The simulator is based on a point mass model of the aircraft. The aim of this paper is to evaluate 3DoF aircraft model errors with BADA data through real data from Flight Data Recorder FDR. Therefore, to validate the proposed simulation tool a comparative analysis of the state variables vector is made between an actual flight and the same flight using the simulator. Finally, an example of a cruise phase is presented, where a conventional levelled flight is compared with a continuous climb flight. The comparison results show the potential benefits of following user-preferred routes for commercial flights.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"7 June 1988."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Cancels Advisory circular 140-7B, dated April 30, 1981.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper reports on the development of elements of an e-supply chain management system for managing maintenance, repair and overhaul (MRO) relationships in the aerospace industry. A standard systems development methodology has been followed to produce a process model (i.e. the AMSCR model); an information model (i.e. business rules) and a computerised information management capability (i.e. automated optimisation). The proof of concept for this web-based MRO supply chain system has been established through the collaboration with a sample of the different types of supply chain members. The proven benefit is a reduction in the stock-holding costs for the whole supply chain whilst also minimising non-flying time of the aircraft that the supply chain supports. This type of system is now vital in an industry that has continuously decreasing profit margins, which in turn means pressure to reduce servicing times and increase the interval between maintenance actions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose - To develop a systems strategy for supply chain management in aerospace maintenance, repair and overhaul (MRO). Design/methodology/approach - A standard systems development methodology has been followed to produce a process model (i.e. the AMSCR model); an information model (i.e. business rules) and a computerised information management capability (i.e. automated optimisation). Findings - The proof of concept for this web-based MRO supply chain system has been established through collaboration with a sample of the different types of supply chain members. The proven benefits comprise new potential to minimise the stock holding costs of the whole supply chain whilst also minimising non-flying time of the aircraft that the supply chain supports. Research limitations/implications - The scale of change needed to successfully model and automate the supply chain is vast. This research is a limited-scale experiment intended to show the power of process analysis and automation, coupled with strategic use of management science techniques, to derive tangible business benefit. Practical implications - This type of system is now vital in an industry that has continuously decreasing profit margins; which in turn means pressure to reduce servicing times and increase the mean time between them. Originality/value - Original work has been conducted at several levels: process, information and automation. The proof-of-concept system has been applied to an aircraft MRO supply chain. This is an area of research that has been neglected, and as a result is not well served by current systems solutions. © Emerald Group Publishing Limited.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A special inventory problem is presented: aircraft spares that are repaired and returned to spares, called rotable inventory. Rotable inventory is not consumed so does not change in the medium term, but is rotated through operational, maintenance and stock phases. The objective for inventory performance is fleet Service Level (SL), which effects aircraft dispatch performance. A model is proposed where the fleet SL drives combined stock levels such that cost is optimized. By holding greater numbers of lower-cost items and holding lower levels of more expensive items, it is possible to achieve substantial cost savings while maintaining performance. This approach is shown to be an advance over the current literature and is tested with case data, with conclusive results.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

With increasing prevalence and capabilities of autonomous systems as part of complex heterogeneous manned-unmanned environments (HMUEs), an important consideration is the impact of the introduction of automation on the optimal assignment of human personnel. The US Navy has implemented optimal staffing techniques before in the 1990's and 2000's with a "minimal staffing" approach. The results were poor, leading to the degradation of Naval preparedness. Clearly, another approach to determining optimal staffing is necessary. To this end, the goal of this research is to develop human performance models for use in determining optimal manning of HMUEs. The human performance models are developed using an agent-based simulation of the aircraft carrier flight deck, a representative safety-critical HMUE. The Personnel Multi-Agent Safety and Control Simulation (PMASCS) simulates and analyzes the effects of introducing generalized maintenance crew skill sets and accelerated failure repair times on the overall performance and safety of the carrier flight deck. A behavioral model of four operator types (ordnance officers, chocks and chains, fueling officers, plane captains, and maintenance operators) is presented here along with an aircraft failure model. The main focus of this work is on the maintenance operators and aircraft failure modeling, since they have a direct impact on total launch time, a primary metric for carrier deck performance. With PMASCS I explore the effects of two variables on total launch time of 22 aircraft: 1) skill level of maintenance operators and 2) aircraft failure repair times while on the catapult (referred to as Phase 4 repair times). It is found that neither introducing a generic skill set to maintenance crews nor introducing a technology to accelerate Phase 4 aircraft repair times improves the average total launch time of 22 aircraft. An optimal manning level of 3 maintenance crews is found under all conditions, the point at which any additional maintenance crews does not reduce the total launch time. An additional discussion is included about how these results change if the operations are relieved of the bottleneck of installing the holdback bar at launch time.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In aircraft components maintenance shops, components are distributed amongst repair groups and their respective technicians based on the type of repair, on the technicians skills and workload, and on the customer required dates. This distribution planning is typically done in an empirical manner based on the group leader’s past experience. Such a procedure does not provide any performance guarantees, leading frequently to undesirable delays on the delivery of the aircraft components. Among others, a fundamental challenge faced by the group leaders is to decide how to distribute the components that arrive without customer required dates. This paper addresses the problems of prioritizing the randomly arriving of aircraft components (with or without pre-assigned customer required dates) and of optimally distributing them amongst the technicians of the repair groups. We proposed a formula for prioritizing the list of repairs, pointing out the importance of selecting good estimators for the interarrival times between repair requests, the turn-around-times and the man hours for repair. In addition, a model for the assignment and scheduling problem is designed and a preliminary algorithm along with a numerical illustration is presented.