869 resultados para World Heritage
Resumo:
Environmental impacts caused during Australia's comparatively recent settlement by Europeans are evident. Governments (both Commonwealth and States) have been largely responsible for requiring landholders – through leasehold development conditions and taxation concessions – to conduct clearing that is now perceived as damage. Most governments are now demanding resource protection. There is a measure of bewilderment (if not resentment) among landholders because of this change. The more populous States, where most overall damage has been done (i.e. Victoria and New South Wales), provide most support for attempts to stop development in other regions where there has been less damage. Queensland, i.e. the north-eastern quarter of the continent, has been relatively slow to develop. It also holds the largest and most diverse natural environments. Tree clearing is an unavoidable element of land development, whether to access and enhance native grasses for livestock or to allow for urban developments (with exotic tree plantings). The consequences in terms of regulations are particularly complex because of the dynamic nature of vegetation. The regulatory terms used in current legislation – such as 'Endangered' and 'Of concern' – depend on legally-defined, static baselines. Regrowth and fire damage are two obvious causes of change. A less obvious aspect is succession, where ecosystems change naturally over long timeframes. In the recent past, the Queensland Government encouraged extensive tree-clearing e.g. through the State Brigalow Development Scheme (mostly 1962 to 1975) which resulted in the removal of some 97% of the wide-ranging mature forests of Acacia harpophylla. At the same time, this government controls National Parks and other reservations (occupying some 4% of the State's 1.7 million km2 area) and also holds major World Heritage Areas (such as the Great Barrier Reef and the Wet Tropics Rainforest) promulgated under Commonwealth legislation. This is a highly prescriptive approach, where the community is directed on the one hand to develop (largely through lease conditions) and on the other to avoid development (largely by unusable reserves). Another approach to development and conservation is still possible in Queensland. For this to occur, however, a more workable and equitable solution than has been employed to date is needed, especially for the remote lands of this State. This must involve resident landholders, who have the capacity (through local knowledge, infrastructure and daily presence) to undertake most costeffectively sustainable land-use management (with suitable attention to ecosystems requiring special conservation effort), that is, provided they have the necessary direction, encouragement and incentive to do so.
Resumo:
We describe the design, development and learnings from the first phase of a rainforest ecological sensor network at Springbrook - part of a World Heritage precinct in South East Queensland. This first phase is part of a major initiative to develop the capability to provide reliable, long-term monitoring of rainforest ecosystems. We focus in particular on our analysis around energy and communication challenges which need to be solved to allow for reliable, long-term deployments in these types of environments.
Resumo:
The feral pig, Sus scrofa, is a widespread and abundant invasive species in Australia. Feral pigs pose a significant threat to the environment, agricultural industry, and human health, and in far north Queensland they endanger World Heritage values of the Wet Tropics. Historical records document the first introduction of domestic pigs into Australia via European settlers in 1788 and subsequent introductions from Asia from 1827 onwards. Since this time, domestic pigs have been accidentally and deliberately released into the wild and significant feral pig populations have become established, resulting in the declaration of this species as a class 2 pest in Queensland. The overall objective of this study was to assess the population genetic structure of feral pigs in far north Queensland, in particular to enable delineation of demographically independent management units. The identification of ecologically meaningful management units using molecular techniques can assist in targeting feral pig control to bring about effective long-term management. Molecular genetic analysis was undertaken on 434 feral pigs from 35 localities between Tully and Innisfail. Seven polymorphic and unlinked microsatellite loci were screened and fixation indices (FST and analogues) and Bayesian clustering methods were used to identify population structure and management units in the study area. Sequencing of the hyper-variable mitochondrial control region (D-loop) of 35 feral pigs was also examined to identify pig ancestry. Three management units were identified in the study at a scale of 25 to 35 km. Even with the strong pattern of genetic structure identified in the study area, some evidence of long distance dispersal and/or translocation was found as a small number of individuals exhibited ancestry from a management unit outside of which they were sampled. Overall, gene flow in the study area was found to be influenced by environmental features such as topography and land use, but no distinct or obvious natural or anthropogenic geographic barriers were identified. Furthermore, strong evidence was found for non-random mating between pigs of European and Asian breeds indicating that feral pig ancestry influences their population genetic structure. Phylogenetic analysis revealed two distinct mitochondrial DNA clades, representing Asian domestic pig breeds and European breeds. A significant finding was that pigs of Asian origin living in Innisfail and south Tully were not mating randomly with European breed pigs populating the nearby Mission Beach area. Feral pig control should be implemented in each of the management units identified in this study. The control should be coordinated across properties within each management unit to prevent re-colonisation from adjacent localities. The adjacent rainforest and National Park Estates, as well as the rainforest-crop boundary should be included in a simultaneous control operation for greater success.
Resumo:
Sundarbans, a Ramsar and World Heritage site, is the largest single block of tidal halophytic mangrove forest in the world covering parts of Bangladesh and India. Natural mangroves were very common along the entire coast of Bangladesh. However, all other natural mangrove forests, including the Chakaria Sundarbans with 21,000 hectares of mangrove, have been cleared for shrimp cultivation. Against this backdrop, the Forest Department of Bangladesh has developed project design documents for a project called ‘Collaborative REDD+ Improved Forest Management (IFM) Sundarbans Project’ (CRISP) to save the only remaining natural mangrove forest of the country. This project, involving conservation of 412,000 ha of natural mangrove forests, is expected to generate, over a 30-year period, a total emissions reduction of about 6.4 million tons of CO2. However, the successful implementation of this project involves a number of critical legal and institutional issues. It may involve complex legal issues such as forest ownership, forest use rights, rights of local people and carbon rights. It may also involve institutional reforms. Ensuring good governance of the proposed project is very vital considering the failure of the Asian Development Bank (ADB) funded and Bangladesh Forest Department managed ‘Sundarbans Biodiversity Conservation Project’. Considering this previous experience, this paper suggests that a comprehensive legal and institutional review and reform is needed for the successful implementation of the proposed CRISP project. This paper argues that without ensuring local people’s rights and their participation, no project can be successful in the Sundarbans. Moreover, corruption of local and international officials may be a serious hurdle in the successful implementation of the project.
Resumo:
Sundarbans, a Ramsar and World Heritage site, is the largest single block of tidal halophytic mangrove forest in the world covering parts of Bangladesh and India. Natural mangroves were very common along the entire coast of Bangladesh. However, all other natural mangrove forests, including the Chakaria Sundarbans with 21,000 hectares of mangrove, have been cleared for shrimp cultivation. Against this backdrop, the Forest Department of Bangladesh has developed project design documents for a project called ‘Collaborative REDD+ Improved Forest Management (IFM) Sundarbans Project’ (CRISP) to save the only remaining natural mangrove forest of the country. This project, involving conservation of 412,000 ha of natural mangrove forests, is expected to generate, over a 30-year period, a total emissions reduction of about 6.4 million tons of CO2. However, the successful implementation of this project involves a number of critical legal and institutional issues. It may involve complex legal issues such as forest ownership, forest use rights, rights of local people and carbon rights. It may also involve institutional reforms. Ensuring good governance of the proposed project is very vital considering the failure of the Asian Development Bank (ADB) funded and Bangladesh Forest Department managed ‘Sundarbans Biodiversity Conservation Project’. Considering this previous experience, this paper suggests that a comprehensive legal and institutional review and reform is needed for the successful implementation of the proposed CRISP project. This paper argues that without ensuring local people’s rights and their participation, no project can be successful in the Sundarbans. Moreover, corruption of local and international officials may be a serious hurdle in the successful implementation of the project.
Resumo:
Feral pigs occur throughout tropical far north Queensland, Australia and are a significant threat to biodiversity and World Heritage values, agriculture and are a vector of infectious diseases. One of the constraints on long-lasting, local eradication of feral pigs is the process of reinvasion into recently controlled areas. This study examined the population genetic structure of feral pigs in far north Queensland to identify the extent of movement and the scale at which demographically independent management units exist. Genetic analysis of 328 feral pigs from the Innisfail to Tully region of tropical Queensland was undertaken. Seven microsatellite loci were screened and Bayesian clustering methods used to infer population clusters. Sequence variation at the mitochondrial DNA control region was examined to identify pig breed. Significant population structure was identified in the study area at a scale of 25 to 35 km, corresponding to three demographically independent management units (MUs). Distinct natural or anthropogenic barriers were not found, but environmental features such as topography and land use appear to influence patterns of gene flow. Despite the strong, overall pattern of structure, some feral pigs clearly exhibited ancestry from a MU outside of that from which they were sampled indicating isolated long distance dispersal or translocation events. Furthermore, our results suggest that gene flow is restricted among pigs of domestic Asian and European origin and non-random mating influences management unit boundaries. We conclude that the three MUs identified in this study should be considered as operational units for feral pig control in far north Queensland. Within a MU, coordinated and simultaneous control is required across farms, rainforest areas and National Park Estates to prevent recolonisation from adjacent localities.
Resumo:
The Climate Change Adaptation for Natural Resource Management (NRM) in East Coast Australia Project aims to foster and support an effective “community of practice” for climate change adaptation within the East Coast Cluster NRM regions that will increase the capacity for adaptation to climate change through enhancements in knowledge and skills and through the establishment of long‐term collaborations. It is being delivered by six consortium research partners: * The University of Queensland (project lead) * Griffith University * University of the Sunshine Coast * CSIRO * New South Wales Office of Environment and Heritage * Queensland Department of Science, IT, Innovation and the Arts (Queensland Herbarium). The project relates to the East Coast Cluster, comprising the six coastal NRM regions and regional bodies between Rockhampton and Sydney: * Fitzroy Basin Association (FBA) * Burnett‐Mary Regional Group (BMRG) * SEQ Catchments (SEQC) * Northern Rivers Catchment Management Authority (CMA) (NRCMA) * Hunter‐Central Rivers CMA (HCRCMA) * Hawkesbury Nepean CMA (HNCMA). The aims of this report are to summarise the needs of the regional bodies in relation to NRM planning for climate change adaptation, and provide a basis for developing the detailed work plan for the research consortium. Two primary methods were used to identify the needs of the regional bodies: (1) document analysis of the existing NRM/ Catchment Action Plans (CAPs) and applications by the regional bodies for funding under Stream 1 of the Regional NRM Planning for Climate Change Fund, and; (2) a needs analysis workshop, held in May 2013 involving representatives from the research consortium partners and the regional bodies. The East Coast Cluster includes five of the ten largest significant urban areas in Australia, world heritage listed natural environments, significant agriculture, mining and extensive grazing. The three NSW CMAs have recently completed strategic level CAPs, with implementation plans to be finalised in 2014/2015. SEQC and FBA are beginning a review of their existing NRM Plans, to be completed in 2014 and 2015 respectively; while BMRG is aiming to produce a NRM and Climate Variability Action Strategy. The regional bodies will receive funding from the Australian Government through the Regional NRM Planning for Climate Change Fund (NRM Fund) to improve regional planning for climate change and help guide the location of carbon and biodiversity activities, including wildlife corridors. The bulk of the funding will be available for activities in 2013/2014, with smaller amounts available in subsequent years. Most regional bodies aim to have a large proportion of the planning work complete by the end of 2014. In addition, NSW CMAs are undergoing major structural change and will be incorporated into semi‐autonomous statutory Local Land Services bodies from 2014. Boundaries will align with local government boundaries and there will be significant change in staff and structures. The regional bodies in the cluster have a varying degree of climate knowledge. All plans recognise climate change as a key driver of change, but there are few specific actions or targets addressing climate change. Regional bodies also have varying capacity to analyse large volumes of spatial or modelling data. Due to the complex nature of natural resource management, all regional bodies work with key stakeholders (e.g. local government, industry groups, and community groups) to deliver NRM outcomes. Regional bodies therefore require project outputs that can be used directly in stakeholder engagement activities, and are likely to require some form of capacity building associated with each of the outputs to maximise uptake. Some of the immediate needs of the regional bodies are a summary of information or tools that are able to be used immediately; and a summary of the key outputs and milestone dates for the project, to facilitate alignment of planning activities with research outputs. A project framework is useful to show the linkages between research elements and the relevance of the research to the adaptive management cycle for NRM planning in which the regional bodies are engaged. A draft framework is proposed to stimulate and promote discussion on research elements and linkages; this will be refined during and following the development of the detailed project work plan. The regional bodies strongly emphasised the need to incorporate a shift to a systems based resilience approach to NRM planning, and that approach is included in the framework. The regional bodies identified that information on climate projections would be most useful at regional and subregional scale, to feed into scenario planning and impact analysis. Outputs should be ‘engagement ready’ and there is a need for capacity building to enable regional bodies to understand and use the projections in stakeholder engagement. There was interest in understanding the impacts of climate change projections on ecosystems (e.g. ecosystem shift), and the consequent impacts on the production of ecosystem services. It was emphasised that any modelling should be able to be used by the regional bodies with their stakeholders to allow for community input (i.e. no black box models). The online regrowth benefits tool was of great interest to the regional bodies, as spatial mapping of carbon farming opportunities would be relevant to their funding requirements. The NSW CMAs identified an interest in development of the tool for NSW vegetation types. Needs relating to socio‐economic information included understanding the socio‐economic determinants of carbon farming uptake and managing community expectations. A need was also identified to understand the vulnerability of industry groups as well as community to climate change impacts, and in particular understanding how changes in the flow of ecosystem services would interact with the vulnerability of these groups to impact on the linked ecologicalsocio‐economic system. Responses to disasters (particularly flooding and storm surge) and recovery responses were also identified as being of interest. An ecosystem services framework was highlighted as a useful approach to synthesising biophysical and socioeconomic information in the context of a systems based, resilience approach to NRM planning. A need was identified to develop processes to move towards such an approach to NRM planning from the current asset management approach. Examples of best practice in incorporating climate science into planning, using scenarios for stakeholder engagement in planning and processes for institutionalising learning were also identified as cross‐cutting needs. The over‐arching theme identified was the need for capacity building for the NRM bodies to best use the information available at any point in time. To this end a planners working group has been established to support the building of a network of informed and articulate NRM agents with knowledge of current climate science and capacity to use current tools to engage stakeholders in NRM planning for climate change adaptation. The planners working group would form the core group of the community of practice, with the broader group of stakeholders participating when activities aligned with their interests. In this way, it is anticipated that the Project will contribute to building capacity within the wider community to effectively plan for climate change adaptation.
Resumo:
This study focuses on designing a community environment education center (CEEC) for Chillingham, as a hub for community transition to sustainability, redressing social fragmentation, youth unemployment, a high eco-footprint and economic rural decline due to globalisation. The ecologically sustainable development framework was delivered by integrating environment education and community development through project-based experiential learning. The development of Chillingham Community Centre involved case study research and incorporated participatory design charrettes, transformative learning, eco-positive development and community-public-private partnerships. This process evolved from community strategic planning in a small rural village buffering world heritage rainforests impacted by a rapidly expanding urban conurbation on Australia’s east coast. This community space encompasses socio-environmental flows connecting people to each other and the ecoscape to grow natural capital, community cohesion and empower eco-governance. Modelling passive solar design, on-site renewable energy/water/nutrient cycling, community garden/market and environment education programs sowed the seeds for a green local economy, demonstrating community capacity to participate in transition to sustainability. A small rural community can demonstrate to other communities that a CEEC enables people to meet their socio-environmental and economic needs locally and sustainably. The ecologically sustainable solution is holistic, all settlements need to be richly biodiverse, locally specific and globally wise.
Resumo:
Histories of past communities are embedded in landscapes around the world but many are suffering from material change or neglect of their fabric. This study was aimed at discovering and representing the authentic intangible experience of two historic landscapes for conservation purposes. A 2500 year old site in Yangzhou, China and a 2000 year old site on St Helena Island in Moreton Bay were found to be managed under two culturally different regimes of authenticity. This research has contributed to challenging the notion that there is only one way to conserve authenticity in historic landscapes of the Asia Pacific.
Resumo:
The unique combination of landscapes and processes that are present and operate on Fraser Island (K'gari) create a dynamic setting that is capable of recording past environmental events, climate variations and former landscapes. Likewise, its geographic position makes Fraser Island sensitive to those events and processes. Based on optically stimulated luminescence dating, the records archived within the world's largest sand island span a period that has the potential to exceed 750 ka and contain specific records that are of extremely high resolution over the past 40,000 years. This is due to the geographic position of Fraser Island, which lies in the coastal subtropical region of Queensland Australia. Fraser Island is exposed to the open ocean currents of the Coral Sea on the east coast and the waters of Hervey Bay on its western margin and is positioned to receive moisture from the Indo-Australian monsoon, southeast trade winds and experiences occasional tropical and ex-tropical cyclones. We review literature that presents the current level of understanding of sea level change, ecological variation and environmental change on Fraser Island. The previous works illustrate the importance of Fraser Island and may link processes, environments and climates on Fraser Island with global records.
Resumo:
Learning from Venice is a philosophical learning diary on what a highly original city can teach urban aesthetics. Throughout history, classical cities have been interpreted and experienced in various ways. But aesthetics has never been accentuated as much as today. Venice has been an important center of commerce, a naval power, and it has had a lot of influence in arts and culture. But in our days it is a tourist trap and a cluster of so called world heritage. The development of tourism is the main reason for the fact that many old cities have become venues for leisure and entertainment, sometimes so that everyday life itself has been pushed to the margins. There is a lot one can learn by studying the history of the aesthetic appreciation of a city. Sometimes the way a city has been enjoyed has changed following the development of traffic. In Venice water buses have replaced the slow and silent gondolas, and since the building of the railway tourists have been approaching the city from a new direction, so that her façade which was built for seafarers has almost become forgotten. There are also themes of change and mobility which are peculiarly Venetian. What is the nature of a city where there are more tourists than inhabitants? And how does one experience a city where water dominates? These questions, and many more, are discussed in Learning from Venice, and side by side with applied aesthetics, the work of philosophers like Walter Benjamin, Gianni Vattimo, and John Dewey, among many others, enter a dialogue with this extraordinary city. Themes discussed include also e.g. walking, surface and depth, Venice as kitsch, and Venice as a museum.
Resumo:
Since 1997 the Finnish Jabal Haroun Project (FJHP) has studied the ruins of the monastery and pilgrimage complex (Gr. oikos) of Aaron located on a plateau of the Mountain of Prophet Aaron, Jabal an-Nabi Harûn, ca. 5 km to the south-west of the UNESCO World Heritage site of Petra in Jordan. The state of conservation and the damaging processes affecting the stone structures of the site are studied in this M.A. thesis. The chapel was chosen as an example, as it represents the phasing and building materials of the entire site. The aim of this work is to act as a preliminary study with regards to the planning of long-term conservation at the site. The research is empirical in nature. The condition of the stones in the chapel walls was mapped using the Illustrated Glossary on Stone Deterioration, by the ICOMOS International Scientific Committee for Stone. This glossary combines several standards and systems of damage mapping used in the field. Climatic conditions (temperature and RH %) were monitored for one year (9/2005-8/2006) using a HOBO Microstation datalogger. The measurements were compared with contemporary measurements from the nearest weather station in Wadi Musa. Salts in the stones were studied by taking samples from the stone surfaces by scraping and with the “Paper Pulp”-method; with a poultice of wet cellulose fiber (Arbocel BC1000) and analyzing what main types of salts were to be found in the samples. The climatic conditions on the mountain were expected to be rapidly changing and to differ clearly from conditions in the neighboring areas. The rapid changes were confirmed, but the values did not differ as much as expected from those nearby: the 12 months monitored had average temperatures and were somewhat drier than average. Earlier research in the area has shown that the geological properties of the stone material influence its deterioration. The damage mapping showed clearly, that salts are also a major reason for stone weathering. The salt samples contained several salt combinations, whose behavior in the extremely unstable climatic conditions is difficult to predict. Detailed mapping and regular monitoring of especially the structures, that are going remain exposed, is recommended in this work.
Resumo:
Several species of marine mammals are at risk of extinction from being captured as bycatch in commercial fisheries. Various approaches have been developed and implemented to address this bycatch problem, including devices and gear changes, time and area closures and fisheries moratoria. Most of these solutions are difficult to implement effectively, especially for artisanal fisheries in developing countries and remote regions. Re-zoning of the Great Barrier Reef World Heritage Area (GBRWHA) in 2004 closed 33% of the region to extractive activities, including commercial fishing. However, the impact of re-zoning and the associated industry restructuring on a threatened marine mammal, the dugong (Dugong dugon), is difficult to quantify. Accurate information on dugong bycatch in commercial nets is unavailable because of the large geographic extent of the GBRWHA, the remoteness of the region adjacent to the Cape York Peninsula where most dugongs occur and the artisanal nature of the fishery. In the face of this uncertainty, a spatial risk-assessment approach was used to evaluate the re-zoning and associated industry restructuring for their ability to reduce the risk of dugong bycatch from commercial fisheries netting. The new zoning arrangements appreciably reduced the risk of dugong bycatch by reducing the total area where commercial netting is permitted. Netting is currently not permitted in 67% of dugong habitats of high conservation value, a 56% improvement over the former arrangements. Re-zoning and industry restructuring also contributed to a 22% decline in the spatial extent of conducted netting. Spatial risk assessment approaches that evaluate the risk of mobile marine mammals from bycatch are applicable to other situations where there is limited information on the location and intensity of bycatch, including remote regions and developing countries where resources are limited.
Resumo:
The Wet Tropics bioregion of north Queensland has been identified as an area of global significance. The world-heritage-listed rainforests have been invaded by feral pigs (Sus scrofa) that are perceived to cause substantial environmental damage. A community perception exists of an annual altitudinal migration of the feral-pig population. The present study describes the movements of 29 feral pigs in relation to altitudinal migration (highland, transitional and lowland areas). Feral pigs were sedentary and stayed within their home range throughout a 4-year study period. No altitudinal migration was detected; pigs moved no more than a mean distance of 1.0 km from the centre of their calculated home ranges. There was no significant difference between the mean (+/- 95% confidence interval) aggregate home ranges for males (8.7 +/- 4.3 km², n = 15) and females (7.2 +/- 1.8 km², n = 14). No difference in home range was detected among the three altitudinal areas: 7.2 +/- 2.4 km² for highland, 6.2 +/- 3.9 km² for transitional and 9.9 +/- 5.3 km² for lowland areas. The aggregate mean home range for all pigs in the present study was 8.0 +/- 2.4 km². The study also assessed the influence seasons had on the home range of eight feral pigs on the rainforest boundary; home ranges did not significantly vary in size between the tropical wet and dry seasons, although the mean home range in the dry season (7.7 +/- 6.9 km²) was more than twice the home range in the wet season (2.9 +/- 0.8 km²). Heavier pigs tended to have larger home ranges. The results of the present study suggest that feral pigs are sedentary throughout the year so broad-scale control techniques need to be applied over sufficient areas to encompass individual home ranges. Control strategies need a coordinated approach if a long-term reduction in the pig population is to be achieved.
Resumo:
The north Queensland banana industry is under pressure from government and community expectations to exhibit good environmental stewardship. The industry is situated on the high-rainfall north Queensland coast adjacent to 2 natural icons, the Great Barrier Reef to the east and World Heritage-listed rain forest areas to the west. The main environmental concern is agricultural industry pollutants harming the Great Barrier Reef. In addition to environmental issues the banana industry also suffers financial pressure from declining margins and production loss from tropical cyclones. As part of a broader government strategy to reduce land-based pollutants affecting the Great Barrier Reef, the formation of a pilot banana producers group to address these environmental and economic pressures was facilitated. Using an integrated farming systems approach, we worked collaboratively with these producers to conduct an environmental risk assessment of their businesses and then to develop best management practices (BMP) to address environmental concerns. We also sought input from technical experts to provide increased rigour for the environmental risk assessment and BMP development. The producers' commercial experience ensured new ideas for improved sustainable practices were constantly assessed through their profit-driven 'filter' thus ensuring economic sustainability was also considered. Relying heavily on the producers' knowledge and experience meant the agreed sustainable practices were practical, relevant and financially feasible for the average-sized banana business in the region. Expert input and review also ensured that practices were technically sound. The pilot group producers then implemented and adapted selected key practices on their farms. High priority practices addressed by the producers group included optimizing nitrogen fertilizer management to reduce runoff water nitrification, developing practical ground cover management to reduce soil erosion and improving integrated pest management systems to reduce pesticide use. To facilitate wider banana industry understanding and adoption of the BMP's developed by the pilot group, we conducted field days at the farms of the pilot group members. Information generated by the pilot group has had wider application to Australian horticulture and the process has been subsequently used with the north Queensland sugar industry. Our experiences have shown that integrated farming systems methodologies are useful in addressing complex issues like environmental and economic sustainability. We have also found that individual horticulture businesses need on-going technical support for change to more sustainable practices. One-off interventions have little impact, as farm improvement is usually an on-going incremental process. A key lesson from this project has been the need to develop practical, farm scale economic tools to clarify and demonstrate the financial impact of alternative management practices. Demonstrating continued profitability is critical to encourage widespread industry adoption of environmentally sustainable practices