929 resultados para Whole life cycle cost


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Sustainable development is about making societal investments. These investments should be in synchronization with the natural environment, trends of social development, as well as organisational and local economies over a long time span. Traditionally in the eyes of clients, project development will need to produce the required profit margins, with some degrees of consideration for other impacts. This is being changed as all citizens of our society are becoming more aware of concepts and challenges such as the climate change, greenhouse footprints, and social dimensions of sustainability, and will in turn demand answers to these issues in built facilities. A large number of R&D projects have focused on the technical advancement and environmental assessment of products and built facilities. It is equally important address the cost/benefit issue, as developers in the world would not want to loose money by investing in built assets. For infrastructure projects, due to its significant cost of development and lengthy delivery time, presenting the full money story of going green is of vital importance. Traditional views of life-cycle costing tend to focus on the pure economics of a construction project. Sustainability concepts are not broadly integrated with the current LCCA in the construction sector. To rectify this problem, this paper reports on the progress to date of developing and extending contemporary LCCA models in the evaluation of road infrastructure sustainability. The suggested new model development is based on sustainability indicators identified through previous research, and incorporating industry verified cost elements of sustainability measures. The on-going project aims to design and a working model for sustainability life-cycle costing analysis for this type of infrastructure projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Designing practical rules for controlling invasive species is a challenging task for managers, particularly when species are long-lived, have complex life cycles and high dispersal capacities. Previous findings derived from plant matrix population analyses suggest that effective control of long-lived invaders may be achieved by focusing on killing adult plants. However, the cost-effectiveness of managing different life stages has not been evaluated. We illustrate the benefits of integrating matrix population models with decision theory to undertake this evaluation, using empirical data from the largest infestation of mesquite (Leguminosae: Prosopis spp) within Australia. We include in our model the mesquite life cycle, different dispersal rates and control actions that target individuals at different life stages with varying costs, depending on the intensity of control effort. We then use stochastic dynamic programming to derive cost-effective control strategies that minimize the cost of controlling the core infestation locally below a density threshold and the future cost of control arising from infestation of adjacent areas via seed dispersal. Through sensitivity analysis, we show that four robust management rules guide the allocation of resources between mesquite life stages for this infestation: (i) When there is no seed dispersal, no action is required until density of adults exceeds the control threshold and then only control of adults is needed; (ii) when there is seed dispersal, control strategy is dependent on knowledge of the density of adults and large juveniles (LJ) and broad categories of dispersal rates only; (iii) if density of adults is higher than density of LJ, controlling adults is most cost-effective; (iv) alternatively, if density of LJ is equal or higher than density of adults, management efforts should be spread between adults, large and to a lesser extent small juveniles, but never saplings. Synthesis and applications.In this study, we show that simple rules can be found for managing invasive plants with complex life cycles and high dispersal rates when population models are combined with decision theory. In the case of our mesquite population, focussing effort on controlling adults is not always the most cost-effective way to meet our management objective.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Chinese rare minnow (Gobiocypris rarus), a freshwater teleost,. was exposed to diethylstilbestrol (DES) at 0.05, 0.5, 1 and 5 mug/L from fertilized eggs for up to mature period under flow-through condition. Several endpoints that related to development, reproductive fitness and transgenerational effects were evaluated. It was found that body length and body weight were significantly reduced and vitellogenin (Via) levels were significantly increased for fish exposed to DES. Histological examination showed that the sex ratios of F-0 fish skewed to female and about 2% of the fish exposed to 0.05 mug/L DES developed testes-ova. The reproductive success, as determined from data on egg production, was reduced in female fish exposed to 0.05, 0.5, 1 and 5 mug/L DES. The lowest-observed-effect concentrations (LOEC) for chances of sex ratios, reproductive success and histology alteration of F-0 are 0.05 mug/L. In the offspring, transgenerational effects on egg hatching rate. egg fertilization and Vtg levels of juvenile individuals were not observed. However. survival of F, generation fry significantly declined. The analysis of sex steroid levels revealed a significant decrease of testosterone (T) in the whole body homogenates (WBH) of male progeny and somewhat elevation of estradiol (E-T) in the WBH of female offspring. These findings indicate that exposure to DES causes a variety of developmental, reproductive and transgenerational effects. (C) 2004 Elsevier B.V. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Comfort is, in essence, satisfaction with the environment, and with respect to the indoor environment it is primarily satisfaction with the thermal conditions and air quality. Improving comfort has social, health and economic benefits, and is more financially significant than any other building cost. Despite this, comfort is not strictly managed throughout the building lifecycle. This is mainly due to the lack of an appropriate system to adequately manage comfort knowledge through the construction process into operation. Previous proposals to improve knowledge management have not been successfully adopted by the construction industry. To address this, the BabySteps approach was devised. BabySteps is an approach, proposed by this research, which states that for an innovation to be adopted into the industry it must be implementable through a number of small changes. This research proposes that improving the management of comfort knowledge will improve comfort. ComMet is a new methodology proposed by this research that manages comfort knowledge. It enables comfort knowledge to be captured, stored and accessed throughout the building life-cycle and so allowing it to be re-used in future stages of the building project and in future projects. It does this using the following: Comfort Performances – These are simplified numerical representations of the comfort of the indoor environment. Comfort Performances quantify the comfort at each stage of the building life-cycle using standard comfort metrics. Comfort Ratings - These are a means of classifying the comfort conditions of the indoor environment according to an appropriate standard. Comfort Ratings are generated by comparing different Comfort Performances. Comfort Ratings provide additional information relating to the comfort conditions of the indoor environment, which is not readily determined from the individual Comfort Performances. Comfort History – This is a continuous descriptive record of the comfort throughout the project, with a focus on documenting the items and activities, proposed and implemented, which could potentially affect comfort. Each aspect of the Comfort History is linked to the relevant comfort entity it references. These three components create a comprehensive record of the comfort throughout the building lifecycle. They are then stored and made available in a common format in a central location which allows them to be re-used ad infinitum. The LCMS System was developed to implement the ComMet methodology. It uses current and emerging technologies to capture, store and allow easy access to comfort knowledge as specified by ComMet. LCMS is an IT system that is a combination of the following six components: Building Standards; Modelling & Simulation; Physical Measurement through the specially developed Egg-Whisk (Wireless Sensor) Network; Data Manipulation; Information Recording; Knowledge Storage and Access.Results from a test case application of the LCMS system - an existing office room at a research facility - highlighted that while some aspects of comfort were being maintained, the building’s environment was not in compliance with the acceptable levels as stipulated by the relevant building standards. The implementation of ComMet, through LCMS, demonstrates how comfort, typically only considered during early design, can be measured and managed appropriately through systematic application of the methodology as means of ensuring a healthy internal environment in the building.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Western manufacturing companies are developing innovative ways of delivering value that competes with the low cost paradigm. One such strategy is to deliver not only products, but systems that are closely aligned with the customer value proposition. These systems are comprised of integrated products and services, and are referred to as Product-Service Systems (PSS). A key challenge in PSS is supporting the design activity. In one sense, PSS design is a further extension of concurrent engineering that requires front-end input from the additional downstream sources of product service and maintenance. However, simply developing products and service packages is not sufficient: the new design challenge is the integrated system. This paper describes the development of a PSS data structure that can support this integrated design activity. The data structure is implemented in a knowledge base using the Protégé knowledge base editor.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In recent years, there has been growing emphasis on the need to provide transparency in the costs of engineering programmes, leading to growing emphasis on Whole Life Cost (WLC) modelling techniques. This has arisen largely due to the increased interested in longer timescale projects and programmes, combined with the emergence of system-of-systems and network enabled capability concepts. This change in the implementation and management of large scale projects has necessitated the development of alternative methods of evaluating performance. This work seeks to address the shortfalls in current costing methodologies when applied to these highly flexible environments, and to propose a conceptual model for dealing with the encountered complexities. The approach has a fundamental role and potential significance in the future of whole life costing for Network Enabled Capability (NEC) but can also offer a potential paradigm shift for costing in traditional engineering environments.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper is concerned with assessing the building’s the energy efficiency and qualities of a modular design for the education industry, in order assess the long economic benefits. The research includes a life-cycle energy and cost analysis of the school building design, predicting the impact on the operational cost of the building as a result of the addition of photovoltaic panels. The paper also includes a comparative study between the ECO Modular Solutions building, and a current standard prefabricated school building, quantifying the savings in CO2 emissions and savings in cost.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Fibre-Reinforced Plastics (FRPs) have been used in civil aerospace vehicles for decades. The current state-of-the-art in airframe design and manufacture results in approximately half the airframe mass attributable to FRP materials. The continual increase in the use of FRP materials over metallic alloys is attributable to the material's superior specific strength and stiffness, fatigue performance and corrosion resistance. However, the full potential of these materials has yet to be exploited as analysis methods to predict physical failure with equal accuracy and robustness are not yet available. The result is a conservative approach to design, but one that can bring benefit via increased inspection intervals and reduced cost over the vehicle life. The challenge is that the methods used in practice are based on empirical tests and real relationships and drivers are difficult to see in this complex process and so the trade-off decision is challenging and uncertain. The aim of this feasibility study was to scope a viable process which could help develop some rules and relationships based on the fundamental mechanics of composite material and the economics of production and operation, which would enhance understanding of the role and impact of design allowables across the life of a composite structure.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Major construction clients are increasingly looking to procure built facilities on the basis of added value, rather than capital cost. Recent advances in the procurement of construction projects have emphasised a whole-life value approach to meeting the client’s objectives, with strategies put in place to encourage long-term commitment and through-life service provision. Construction firms are therefore increasingly required to take on responsibility for the operation and maintenance of the construction project on the client’s behalf - with the emphasis on value and service. This inevitably throws up a host of challenges, not the least of which is the need for construction firms to manage and accommodate the new emphasis on service. Indeed, these ‘service-led’ projects represent a new realm of construction projects where the rationale for the project is driven by client’s objectives with some aspect of service provision. This vision of downstream service delivery increases the number of stakeholders, adds to project complexity and challenges deeply-ingrained working practices. Ultimately it presents a major challenge for the construction sector. This paper sets out to unravel some of the many implications that this change brings with it. It draws upon ongoing research investigating how construction firms can adapt to a more service-orientated built environment and add value in project-based environments. The conclusions lay bare the challenges that firms face when trying to compete on the basis of added-value and service delivery. In particular, how it affects deeply-ingrained working practices and established relationships in the sector.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

There is potential to reduce both operational and embodied greenhouse gas emission from buildings. To date the focus has been on reducing the operational element, although given the urgency of carbon reductions, it may be more beneficial to consider upfront embodied carbon reductions. This paper describes a case study on the whole life carbon cycle of a warehouse building in Swindon, UK. It examines the relationship between embodied carbon (Ec) and operational carbon (Oc), the proportions of Ec from the structural and non-structural elements, carbon benchmarking of the structure, the value of ‘cradle to site’ or ‘cradle to grave’ assessments and the significance of the timing of emissions during the life of the building. The case study indicates that Ec was dominant for the building and that the structure was responsible for more than half of the Ec. Weighting of future emissions appears to be an important factor to consider. The PAS 2050 reduction factors had only a modest effect but weighting to allow for future decarbonisation of the national grid energy supply had a large effect. This suggests that future operational carbon emissions are being overestimated compared to embodied.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Forests are a store of carbon and an eco-system that continually removes carbon dioxide from the atmosphere. If they are sustainably managed, the carbon store can be maintained at a constant level, while the trees removed and converted to timber products can form an additional long term carbon store. The total carbon store in the forest and associated ‘wood chain’ therefore increases over time, given appropriate management. This increasing carbon store can be further enhanced with afforestation. The UK’s forest area has increased continually since the early 1900s, although the rate of increase has declined since its peak in the late 1980s, and it is a similar picture in the rest of Europe. The increased sustainable use of timber in construction is a key market incentive for afforestation, which can make a significant contribution to reducing carbon emissions. The case study presented in this paper demonstrates the carbon benefits of a Cross Laminated Timber (CLT) solution for a multi-storey residential building in comparison with a more conventional reinforced concrete solution. The embodied carbon of the building up to completion of construction is considered, together with the stored carbon during the life of the building and the impact of different end of life scenarios. The results of the study show that the total stored carbon in the CLT structural frame is 1215tCO2 (30tCO2 per housing unit). The choice of treatment at end of life has a significant effect on the whole life embodied carbon of the CLT frame, which ranges from -1017 tCO2e for re-use to +153tCO2e for incinerate without energy recovery. All end of life scenarios considered result in lower total CO2e emissions for the CLT frame building compared with the reinforced concrete frame solution.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Whole-life thinking for engineers working on the built environment has become more important in a fast changing world.Engineers are increasingly concerned with complex systems, in which the parts interact with each other and with the outside world in many ways – the relationships between the parts determine how the system behaves. Systems thinking provides one approach to developing a more robust whole life approach. Systems thinking is a process of understanding how things influence one another within a wider perspective. Complexity, chaos, and risk are endemic in all major projects. New approaches are needed to produce more reliable whole life predictions. Best value, rather than lowest cost can be achieved by using whole-life appraisal as part of the design and delivery strategy.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Aluminium die casting is a process used to transform molten aluminium material into automotive gearbox housings, wheels and electronic components, among many other uses. It is used because it is a very efficient method of achieving near net shape with the required mechanical properties. Life Cycle Assessment (LCA) is a technique used to determine the environmental impacts of a product or process. The Life Cycle Inventory (LCI) is the initial phase of an LCA and describes which emissions will occur and which raw materials are used during the life of a product or during a process. This study has improved the LCI technique by adding in manufacturing and other costs to the ISO standardised methods. Although this is not new, the novel application and allocation methods have been developed independently. The improved technique has then been applied to Aluminium High Pressure Die Casting. In applying the improved LCI to this process, the cost in monetary terms and environmental emissions have been determined for a particular component manufactured by this process. A model has been developed in association with an industry partner so this technique can be repeatedly applied and used in the prediction of costs and emissions. This has been tested with two different products. Following this, specialised LCA software modelling of the aluminium high pressure die casting process was conducted. The variations in the process have shown that each particular component will have different costs and emissions and it is not possible to generalise the process by modelling only one component. This study has concentrated on one process within die casting but the techniques developed can be used across any variations in the die casting process.