A novel constructive heuristic algorithm to the network expansion planning problem is presented the basic idea comes from Garver's work applied to the transportation model, nevertheless the proposed algorithm is for the DC model. Tests results with most known systems in the literature are carried out to show the efficiency of the method.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

With ever increasing demand for electric energy, additional generation and associated transmission facilities has to be planned and executed. In order to augment existing transmission facilities, proper planning and selective decisions are to be made whereas keeping in mind the interests of several parties who are directly or indirectly involved. Common trend is to plan optimal generation expansion over the planning period in order to meet the projected demand with minimum cost capacity addition along with a pre-specified reliability margin. Generation expansion at certain locations need new transmission network which involves serious problems such as getting right of way, environmental clearance etc. In this study, an approach to the citing of additional generation facilities in a given system with minimum or no expansion in the transmission facility is attempted using the network connectivity and the concept of electrical distance for projected load demand. The proposed approach is suitable for large interconnected systems with multiple utilities. Sample illustration on real life system is presented in order to show how this approach improves the overall performance on the operation of the system with specified performance parameters.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In recent decades, all over the world, competition in the electric power sector has deeply changed the way this sector’s agents play their roles. In most countries, electric process deregulation was conducted in stages, beginning with the clients of higher voltage levels and with larger electricity consumption, and later extended to all electrical consumers. The sector liberalization and the operation of competitive electricity markets were expected to lower prices and improve quality of service, leading to greater consumer satisfaction. Transmission and distribution remain noncompetitive business areas, due to the large infrastructure investments required. However, the industry has yet to clearly establish the best business model for transmission in a competitive environment. After generation, the electricity needs to be delivered to the electrical system nodes where demand requires it, taking into consideration transmission constraints and electrical losses. If the amount of power flowing through a certain line is close to or surpasses the safety limits, then cheap but distant generation might have to be replaced by more expensive closer generation to reduce the exceeded power flows. In a congested area, the optimal price of electricity rises to the marginal cost of the local generation or to the level needed to ration demand to the amount of available electricity. Even without congestion, some power will be lost in the transmission system through heat dissipation, so prices reflect that it is more expensive to supply electricity at the far end of a heavily loaded line than close to an electric power generation. Locational marginal pricing (LMP), resulting from bidding competition, represents electrical and economical values at nodes or in areas that may provide economical indicator signals to the market agents. This article proposes a data-mining-based methodology that helps characterize zonal prices in real power transmission networks. To test our methodology, we used an LMP database from the California Independent System Operator for 2009 to identify economical zones. (CAISO is a nonprofit public benefit corporation charged with operating the majority of California’s high-voltage wholesale power grid.) To group the buses into typical classes that represent a set of buses with the approximate LMP value, we used two-step and k-means clustering algorithms. By analyzing the various LMP components, our goal was to extract knowledge to support the ISO in investment and network-expansion planning.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper, an efficient genetic algorithm (GA) is presented to solve the problem of multistage and coordinated transmission expansion planning. This is a mixed integer nonlinear programming problem, difficult for systems of medium and large size and high complexity. The GA presented has a set of specialized genetic operators and an efficient form of generation of the initial population that finds high quality suboptimal topologies for large size and high complexity systems. In these systems, multistage and coordinated planning present a lower investment than static planning. Tests results are shown in one medium complexity system and one large size high complexity system.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Transmission expansion planning (TEP) is a non-convex optimization problem that can be solved via different heuristic algorithms. A variety of classical as well as heuristic algorithms in literature are addressed to solve TEP problem. In this paper a modified constructive heuristic algorithm (CHA) is proposed for solving such a crucial problem. Most of research papers handle TEP problem by linearization of the non-linear mathematical model while in this research TEP problem is solved via CHA using non-linear model. The proposed methodology is based upon Garver's algorithm capable of applying to a DC model. Simulation studies and tests results on the well known transmission network such as: Garver and IEEE 24-bus systems are carried out to show the significant performance as well as the effectiveness of the proposed algorithm. © 2011 IEEE.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study presents a new method for determining the transmission network usage by loads and generators, which can then be used for transmission cost/loss allocation in an explainable and justifiable manner. The proposed method is based on solid physical grounds and circuit theory. It relies on dividing the currents through the network into two components; the first one is attributed to power flows from generators to loads, whereas the second one is because of the generators only. Unlike almost all the available methods, the proposed method is assumption free and hence it is more accurate than similar methods even those having some physical basis. The proposed method is validated through a transformer analogy, and theoretical derivations. The method is verified through application to the IEEE 30 bus system and the IEEE 118 test system. The results obtained verified many desirable features of the proposed method. Being more accurate in determining the network usage, in an explainable transparent manner, and in giving accurate cost signals, indicating the best locations to add loads and generation, are among the many desirable features.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Large scale combinatorial problems such as the network expansion problem present an amazingly high number of alternative configurations with practically the same investment, but with substantially different structures (configurations obtained with different sets of circuit/transformer additions). The proposed parallel tabu search algorithm has shown to be effective in exploring this type of optimization landscape. The algorithm is a third generation tabu search procedure with several advanced features. This is the most comprehensive combinatorial optimization technique available for treating difficult problems such as the transmission expansion planning. The method includes features of a variety of other approaches such as heuristic search, simulated annealing and genetic algorithms. In all test cases studied there are new generation, load sites which can be connected to an existing main network: such connections may require more than one line, transformer addition, which makes the problem harder in the sense that more combinations have to be considered.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Reliability is an integral component of modern power system design, planning and management. This paper uses the Markov approach to substation reliability evaluation using dedicated reliability software. This technique was applied to yield reliability indices for an existing and important substation in the POWERLINK QUEENSLAND 275 kV transmission network. Reliability indices were also determined for several reinforcement alternatives for this substation with the aim of improving substation reliability. The economic feasibility of achieving higher levels of reliability was also taken into account.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Aurizon, Australia's largest rail freight operator, is introducing the Static Frequency Converter (SFC) technology into its electric railway network as part of the Bauhinia Electrification Project. The introduction of SFCs has significant implications on the protection systems of the 50kV traction network. The traditional distance protection calculation method does not work in this configuration because of the effect that the SFC in combination with the remote grid has on the apparent impedance, and was substantially reviewed. The standard overcurrent (OC) protection scheme is not suitable due to the minimum fault level being below the maximum load level and was revised to incorporate directionality and under-voltage inhibit. Delta protection was reviewed to improve sensitivity. A new protection function was introduced to prevent back-feeding faults in the transmission network through the grid connection. Protection inter-tripping was included to ensure selectivity between the SFC protection and the system downstream.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

With the liberalisation of electricity market it has become very important to determine the participants making use of the transmission network.Transmission line usage computation requires information of generator to load contributions and the path used by various generators to meet loads and losses. In this study relative electrical distance (RED) concept is used to compute reactive power contributions from various sources like generators, switchable volt-amperes reactive(VAR) sources and line charging susceptances that are scattered throughout the network, to meet the system demands. The transmission line charge susceptances contribution to the system reactive flows and its aid extended in reducing the reactive generation at the generator buses are discussed in this paper. Reactive power transmission cost evaluation is carried out in this study. The proposed approach is also compared with other approaches viz.,proportional sharing and modified Y-bus.Detailed case studies with base case and optimised results are carried out on a sample 8-bus system. IEEE 39-bus system and a practical 72-bus system, an equivalent of Indian Southern grid are also considered for illustration and results are discussed.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The main objective of on-line dynamic security assessment is to take preventive action if required or decide remedial action if a contingency actually occurs. Stability limits are obtained for different contingencies. The mode of instability is one of the outputs of dynamic security analysis. When a power system becomes unstable, it splits initially into two groups of generators, and there is a unique cutset in the transmission network known as critical cutset across which the angles become unbounded. The knowledge of critical cutset is additional information obtained from dynamic security assessment, which can be used for initiating preventive control actions, deciding emergency control actions, and adaptive out-of-step relaying. In this article, an analytical technique for the fast prediction of the critical cutset by system simulation for a short duration is presented. Case studies on the New England ten-generator system are presented. The article also suggests the applications of the identification of critical cutsets.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

There is a lot of pressure on all the developed and second world countries to produce low emission power and distributed generation (DG) is found to be one of the most viable ways to achieve this. DG generally makes use of renewable energy sources like wind, micro turbines, photovoltaic, etc., which produce power with minimum green house gas emissions. While installing a DG it is important to define its size and optimal location enabling minimum network expansion and line losses. In this paper, a methodology to locate the optimal site for a DG installation, with the objective to minimize the net transmission losses, is presented. The methodology is based on the concept of relative electrical distance (RED) between the DG and the load points. This approach will help to identify the new DG location(s), without the necessity to conduct repeated power flows. To validate this methodology case studies are carried out on a 20 node, 66kV system, a part of Karnataka Transco and results are presented.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Com o passar do tempo, a demanda elétrica de diversas áreas varia tornando necessária a construção de novos geradores elétricos e a expansão da rede de transmissão de energia elétrica. Nesta dissertação, focamos no problema de expansão da rede de transmissão, assumindo que novos geradores estão construídos para suprir as novas demandas. Essa expansão exige altos investimentos que precisam ser cuidadosamente planejados. O problema pode ser modelado como um problema de otimização não linear inteira mista e pertence à classe dos problemas NP-difíceis. Desta forma, uma abordagem heurística pode ser adequada para a sua solução pois pode vir a fornecer boas soluções em tempo computacional aceitável. Esta dissertação se propõe a apresentar um estudo do problema de planejamento da expansão de redes de transmissão de energia elétrica estático e multiestágio. Mostramos o que já existe na literatura para o que é chamado de problema sem redimensionamento e as inovações feitas por nós para o problema com redimensionamento. Quanto aos métodos de solução, utilizamos a metaheurística GRASP para o problema estático e combinamos o GRASP com o procedimento Backward-Forward quando falamos em problema multiestágio. Nesta dissertação comparamos os resultados computacionais obtidos com resultados encontrados na literatura.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

In a liberalized electricity market, the Transmission System Operator (TSO) plays a crucial role in power system operation. Among many other tasks, TSO detects congestion situations and allocates the payments of electricity transmission. This paper presents a software tool for congestion management and transmission price determination in electricity markets. The congestion management is based on a reformulated Optimal Power Flow (OPF), whose main goal is to obtain a feasible solution for the re-dispatch minimizing the changes in the dispatch proposed by the market operator. The transmission price computation considers the physical impact caused by the market agents in the transmission network. The final tariff includes existing system costs and also costs due to the initial congestion situation and losses costs. The paper includes a case study for the IEEE 30 bus power system.