914 resultados para Task scheduling in computational grid
Resumo:
This study examined whether providing an auditory warning would facilitate attention switching abilities in older adults during dual-tasking. Fifteen young and 16 older adults performed a tracking task while recovering their balance from a support surface translation. For half of the trials, an auditory warning was presented to inform participants of the upcoming translation. Performance was quantified through electromyographic (EMG) recordings of the lower limb muscles, while the ability to switch attention between tasks was determined by tracking task error. Providing warning of an upcoming loss of balance resulted in both young and older adults increasing their leg EMG activity by 10-165% (p<0.05) in preparation for the upcoming translation. However, no differences in the timing of attention switching were observed with or without the warning (p=0.424). Together, these findings suggest that providing a perturbation warning has minimal benefits in improving attention switching abilities for balance recovery in healthy older adults.
Resumo:
Converging evidence has demonstrated learning advantages when an individual is instructed to focus their attention externally. However, many of the motor tasks utilized in past research had clear external objectives (i.e., putting accuracy), creating a compatible relationship between an external focus of attention (i.e., outcome) and an external task objective (i.e., putting accuracy). The present study examined whether or not the consistency of instructions and task objective would differentially impact the acquisition of a golf putting task. Participants performed a putting task in a control condition or in one of four experimental conditions resulting from the factorial interaction of task instructions (internal or external) and task objective (internal or external). The retention and transfer data revealed that participants who received an external task objective demonstrated superior outcome scores. Participants who received technique information paired with outcome information demonstrated superior technique scores.
Resumo:
Graphical tracking is a technique for crop scheduling where the actual plant state is plotted against an ideal target curve which encapsulates all crop and environmental characteristics. Management decisions are made on the basis of the position of the actual crop against the ideal position. Due to the simplicity of the approach it is possible for graphical tracks to be developed on site without the requirement for controlled experimentation. Growth models and graphical tracks are discussed, and an implementation of the Richards curve for graphical tracking described. In many cases, the more intuitively desirable growth models perform sub-optimally due to problems with the specification of starting conditions, environmental factors outside the scope of the original model and the introduction of new cultivars. Accurate specification for a biological model requires detailed and usually costly study, and as such is not adaptable to a changing cultivar range and changing cultivation techniques. Fitting of a new graphical track for a new cultivar can be conducted on site and improved over subsequent seasons. Graphical tracking emphasises the current position relative to the objective, and as such does not require the time consuming or system specific input of an environmental history, although it does require detailed crop measurement. The approach is flexible and could be applied to a variety of specification metrics, with digital imaging providing a route for added value. For decision making regarding crop manipulation from the observed current state, there is a role for simple predictive modelling over the short term to indicate the short term consequences of crop manipulation.
Resumo:
A lot sizing and scheduling problem prevalent in small market-driven foundries is studied. There are two related decision levels: (I the furnace scheduling of metal alloy production, and (2) moulding machine planning which specifies the type and size of production lots. A mixed integer programming (MIP) formulation of the problem is proposed, but is impractical to solve in reasonable computing time for non-small instances. As a result, a faster relax-and-fix (RF) approach is developed that can also be used on a rolling horizon basis where only immediate-term schedules are implemented. As well as a MIP method to solve the basic RF approach, three variants of a local search method are also developed and tested using instances based on the literature. Finally, foundry-based tests with a real-order book resulted in a very substantial reduction of delivery delays and finished inventory, better use of capacity, and much faster schedule definition compared to the foundry`s own practice. (c) 2006 Elsevier Ltd. All rights reserved.
Resumo:
By comparing the behavior of three Acromyrmex (Hymenoptera, Formicidae) species during foraging on artificial trails of different lengths, we observed the occurrence of task partitioning and its relation to the food distance from the nest. Task partitioning was verified by leaf cache formation along the trail and leaf direct transferring among workers. There was significant difference between the number of leaf fragments carried directly to the fungus chamber and those transferred direct or indirectly, via cache, depending upon the trail length. Task partitioning could be a strategy used by leaf-cutting ants that allows the workers to use food sources far from their nests.
Resumo:
A lot sizing and scheduling problem prevalent in small market-driven foundries is studied. There are two related decision levels: (1) the furnace scheduling of metal alloy production, and (2) moulding machine planning which specifies the type and size of production lots. A mixed integer programming (MIP) formulation of the problem is proposed, but is impractical to solve in reasonable computing time for non-small instances. As a result, a faster relax-and-fix (RF) approach is developed that can also be used on a rolling horizon basis where only immediate-term schedules are implemented. As well as a MIP method to solve the basic RF approach, three variants of a local search method are also developed and tested using instances based on the literature. Finally, foundry-based tests with a real-order book resulted in a very substantial reduction of delivery delays and finished inventory, better use of capacity, and much faster schedule definition compared to the foundry's own practice. © 2006 Elsevier Ltd. All rights reserved.
Resumo:
In dealing with computer networks, these allow the flow of information through the resources of various equipment's. This work describes the implementation through the encapsulation of Protocol DNP3, usually employed in Smart Grid communication, in a simulator of discrete events. The NS-2 is a simulator in open source of network events, that facilitate the development of communication networks scenarios considering the protocols involved, in wireless or wired technologies. The objective of this work is to develop the DNP3 protocol encapsulation over a TCP/IP in the in the discrete event Simulator NS-2, allowing an analysis of behavior of a middle or large network sized in Smart Grid applications. © 2013 IEEE.
Resumo:
Pós-graduação em Ciência da Computação - IBILCE
Resumo:
Lightpath scheduling is an important capability in next-generation wavelength-division multiplexing (WDM) optical networks to reserve resources in advance for a specified time period while provisioning end-to-end lightpaths. In this study, we propose an approach to support dynamic lightpath scheduling in such networks. To minimize blocking probability in a network that accommodates dynamic scheduled lightpath demands (DSLDs), resource allocation should be optimized in a dynamic manner. However, for the network users who desire deterministic services, resources must be reserved in advance and guaranteed for future use. These two objectives may be mutually incompatible. Therefore, we propose a two-phase dynamic lightpath scheduling approach to tackle this issue. The first phase is the deterministic lightpath scheduling phase. When a lightpath request arrives, the network control plane schedules a path with guaranteed resources so that the user can get a quick response with the deterministic lightpath schedule. The second phase is the lightpath re-optimization phase, in which the network control plane re-provisions some already scheduled lightpaths. Experimental results show that our proposed two-phase dynamic lightpath scheduling approach can greatly reduce WDM network blocking.