867 resultados para Safety, Construction management, Statistics


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Genetic algorithms (GAs) have been introduced into site layout planning as reported in a number of studies. In these studies, the objective functions were defined so as to employ the GAs in searching for the optimal site layout. However, few studies have been carried out to investigate the actual closeness of relationships between site facilities; it is these relationships that ultimately govern the site layout. This study has determined that the underlying factors of site layout planning for medium-size projects include work flow, personnel flow, safety and environment, and personal preferences. By finding the weightings on these factors and the corresponding closeness indices between each facility, a closeness relationship has been deduced. Two contemporary mathematical approaches - fuzzy logic theory and an entropy measure - were adopted in finding these results in order to minimize the uncertainty and vagueness of the collected data and improve the quality of the information. GAs were then applied to searching for the optimal site layout in a medium-size government project using the GeneHunter software. The objective function involved minimizing the total travel distance. An optimal layout was obtained within a short time. This reveals that the application of GA to site layout planning is highly promising and efficient.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

From its roots in strategic management theory, stakeholder management has been adopted by the construction management academic community and applied as a valid paradigm around which research work has been generated aiming to improve project effi ciencies and effectiveness. However, academics have argued that stakeholder management should move away from purely theoretical discussions and engage more with the realities of construction project work. This paper re-appraises the stakeholder management concept for the construction domain by re-thinking some of the fundamental principles and ideals present within the more general stakeholder theory literature. It engages with issues which researchers have arguably failed to acknowledge and calls for a re-evaluation of construction stakeholder management research by presenting a review around four distinctive themes: the moral obligations of engaging with stakeholders against the business and efficiency driven imperatives of construction organisations; the contrast between theoretical abstractions and empirically grounded research; the tensions between theoretical convergence versus calls for multiple and divergent perspectives on stakeholder management and the practicalities of conducting stakeholder management in the construction domain. Such a critical re-appraisal of stakeholder management thinking both generates new lines of enquiry and promises to help inform and shape current and future industry practice.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Local, tacit and normally unspoken OHS (occupational health and safety) knowledge and practices can too easily be excluded from or remain below the industry horizon of notice, meaning that they remain unaccounted for in formal OHS policy and practice. In this article we stress the need to more systematically and routinely tap into these otherwise ‘hidden’ communication channels, which are central to how everyday safe working practices are achieved. To demonstrate this approach this paper will draw on our ethnographic research with a gang of migrant curtain wall installers on a large office development project in the north of England. In doing so we reflect on the practice-based nature of learning and sharing OHS knowledge through examples of how workers’ own patterns of successful communication help avoid health and safety problems. These understandings, we argue, can be advanced as a basis for the development of improved OHS measures, and of organizational knowing and learning.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

How does the work of designers impact on the safety of operatives at the construction site? Safety research and policy emphasize the importance of designing for safe construction, yet the interface between design and construction is poorly understood: accidents have multiple causes making it hard to establish causal links between design choices and safety outcomes. An in-depth case study of a major station project examines how professionals on the construction site perceive and manage the safety challenges of a building design. Analyses reveal understandings that, on the project studied, design has an impact on safety because of: (1) the timing of design work, where the volume of late design changes increased the difficulty of planning safe procedures, e.g. for working at height, lifting heavy items, refurbishing and demolishing old buildings; and (2) inputs from design stakeholders with insufficient practical knowledge of construction and operation required unplanned work-arounds, e.g. to coordinate different sub-systems, provide maintenance access, and manage loads during construction. These findings suggest that safety suffers where projects are under-designed, and that alongside regulation, there is a need for robust management attention to the contractual structures, incentives, processes and tools that enable clients and designers to understand material practices of construction and operation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The fifth edition of this best-selling textbook has been thoroughly revised to provide the most up-to-date and comprehensive coverage of the legislation, administration and management of construction contracts. It now includes comparison of working with JCT, NEC3 and FIDIC contracts, throughout. In line with new thinking in construction management research, this authoritative guide is essential reading for every construction undergraduate and is an extremely useful source of reference for practitioners.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The topic of occupational health and safety (OHS) has been investigated for many years and continues to be a concept often researched today. Generally speaking OHS research has been centered around food safety, construction safety, transportation safety, fire safety, drug and alcohol testing, health and medical management, and industrial hygiene to name a few. However, the concept of OHS concerning female commercial sex workers (FCSWs) has rarely been investigated, often neglected, seldom discussed and is lacking in sound research. Although regarded as the "oldest profession", commercial sex work (CSW) has consistently been ignored, disregarded and under-researched due to the illegality and stigmatization of prostitution. This paper reviews occupational safety and health issues faced by FCSWs in Tema and Accra, Ghana, through in-depth interviews, visits to women's homes, field work, informal conversations and participant observations with FCSWs over a period of two months. Facets of OHS that emerged among FCSWs included sexually transmissible infections, risks associated with harassment and violence from police and clients, alcohol and drug use, irregular hospital visits and/or lack of hospital visits, immigration issues, legal and policing risks. We argue that CSW be viewed as an occupation in great need of interventions to reduce workplace risks and improve the health and safety of FCSWs^

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Within the last century the interest in wind-induced loads over civil engineering structures has become more and more important, the reason being that the development of new construction techniques and materials has allowed engineers and architects to design new structures far from the traditional concepts, and in many cases wind actions over these singular structures are not included in the existing codes of practice. In this paper the windinduced static loads over bridges constructed by the double cantilever method during erection stages are considered. The aerodynamic load over a double cantilever bridge under a yawing-angled wind produces a yawing (torsional) moment on the bridge deck, which can lead to undesirable rotation of the deck about the supporting pier. The effects of the wind yaw angle and the length of the deck are analysed. The wind action caused by the presence of sliding concrete forms at the ends of the deck is also studied.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

National Highway Traffic Safety Administration, Washington, D.C.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study was geared at assessing the employability skills provision within a construction project management degree programme through a questionnaire survey. Students were required to assess their level of ability in relation to the most common skills and competencies most sought after by construction project management graduate employers. The study identified team-working ability as the most sought after skill by the employers investigated followed by verbal communication, written communication and leadership ability. It was found that students were very confident of their ability in 12 of the 14 identified skills and competencies. But ironically, leadership, an important skill sought by employers is one that majority of the students felt most insecure in their ability. The study concludes that the BSc programme equips students with these employability skills and competencies, but more effort is needed to make the leadership development opportunities in the programme more conspicuous. With recommendations on how to achieve this proffered.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The sudden change in environmental munificence level in the construction sector
during the period 2007 – 2015 provides a natural experiment to investigate strategic
and operating actions of firms, particularly during an environmental jolt. Statistics on
business failures corroborate that neither academics nor practitioners have succeeded
in guiding strategic action during periods of environmental jolt. Despite the recent
increase of turnaround research in the general management domain, its use in the
construction management realm remains underexplored. To address this research
gap, five exploratory case studies of an ongoing PhD study were used to examine the
turnaround strategies of construction contractors during a period of economic
contraction and growth. The findings show that, although retrenchment is often
considered to be a short-term strategy, this is clearly not the case; with the majority of
contractors maintaining the strategy for 6-7 years. During the same period,
internationalization became critical, with the turnaround process shifting towards
strategic reorientation that altered the firms' market domain. The case studies further
suggest that strategic and operational actions resonate quite well with contemporary
practice-based approaches to strategy making. The findings provide valuable
assistance for construction contractors in dealing with organisational decline and in
developing a successful turnaround response.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

O estágio desenvolvido na empresa de construção Manuel da Graça Peixito, incidiu sobre Direcção e Gestão de Obra na execução de um projecto de reconversão urbanística a aplicar na AUGI 42 localizada no Casal do Sapo em Sesimbra. As áreas urbanas de génese ilegal, denominadas de AUGI, surgiram no inicio da década de 60, como um fenómeno que surgiu de forma a colmatar a carência no parque habitacional das periferias das grandes áreas metropolitanas do território nacional. O ambiente urbano gerado pela existência das AUGI, muitas vezes de proporções de grande dimensão, evidencia inúmeras carências e problemas a níveis sociais, económicos, urbanísticos e legais. A gestão de obra é uma actividade essencial na execução da obra e no planeamento de todas as tarefas a realizar com o melhor tratamento económico e financeiro. A direcção de obra tem como principais funções a selecção de recursos humanos, escolha e montagem dos órgãos de apoio logístico, a aquisição atempada e negociação de materiais. O Gestor e Director de Obra é colocado num ciclo operacional de optimização de recursos e eficiências, em que as duas funções, gestão e direcção de obra, são complementares e a abordagem do contexto interactivo do controlo da obra, em termos da produção, da gestão económica e financeira, da gestão do tempo, do cumprimento das normas de saúde e segurança no trabalho e no assegurar da qualidade, são claramente identificadas, enquanto veículo indispensável do cumprimento do contrato de empreitada. O processo de reconversão urbanística aplicado na AUGI 42 teve como estrutura de proposta a seguinte base: primeiro na recolha de dados relativo à AUGI 42 e na definição de um planeamento do faseamento numa estratégia de execução da empreitada; segundo na constituição e caracterização da execução de variadas infra-estruturas (rede de drenagem de esgotos domésticos e pluviais, rede de abastecimento de águas, rede de telecomunicações, rede eléctrica, rede de gás, rede viária e arranjos de espaços exteriores). Este processo e consequente proposta surgem como um contributo fundamental na melhoria da qualidade de vida das populações, como também da funcionalidade do sistema urbano que compõe as AUGI.