943 resultados para Repeated Averages of Real-Valued Functions
Resumo:
The numerical implementation of the complex image approach for the Green's function of a mixed-potential integralequation formulation is examined and is found to be limited to low values of k(0) rho (in this context k(0) rho = 2 pirho/ lambda(0), where rho is the distance between the source and the field points of the Green's function and lambda(0) is the free space wavelength). This is a clear limitation for problems of large dimension or high frequency where this limit is easily exceeded. This paper examines the various strategies and proposes a hybrid method whereby most of the above problems can be avoided. An efficient integral method that is valid for large k(0) rho is combined with the complex image method in order to take advantage of the relative merits of both schemes. It is found that a wide overlapping region exists between the two techniques allowing a very efficient and consistent approach for accurately calculating the Green's functions. In this paper, the method developed for the computation of the Green's function is used for planar structures containing both lossless and lossy media.
Resumo:
Program compilation can be formally defined as a sequence of equivalence-preserving transformations, or refinements, from high-level language programs to assembler code, Recent models also incorporate timing properties, but the resulting formalisms are intimidatingly complex. Here we take advantage of a new, simple model of real-time refinement, based on predicate transformer semantics, to present a straightforward compilation formalism that incorporates real-time constraints. (C) 2002 Elsevier Science B.V. All rights reserved.
Resumo:
The present study aimed to 1) examine the relationship between laboratory-based measures and high-intensity ultraendurance (HIU) performance during an intermittent 24-h relay ultraendurance mountain bike race (similar to20 min cycling, similar to60min recovery), and 2) examine physiological and performance based changes throughout the HIU event. Prior to the HIU event, four highly-trained male cyclists (age = 24.0 +/- 2.1 yr; mass = 75.0 +/- 2.7 kg; (V)over dot O-2peak = 70 +/- 3 ml.kg(-1).min(-1)) performed 1) a progressive exercise test to determine peak Volume of oxygen uptake ((V)over dot O-2peak), peak power output (PPO), and ventilatory threshold (T-vent), 2) time-to-fatigue tests at 100% (TF100) and 150% of PPO (TF150), and 3) a laboratory simulated 40-km time trial (TT40). Blood lactate (Lac(-)), haematocrit and haemoglobin were measured at 6-h intervals throughout the HIU event, while heart rate (HR) was recorded continuously. Intermittent HIU performance, performance HR, recovery HR, and Lac declined (P < 0.05), while plasma volume expanded (P < 0.05) during the HIU event. TF100 was related to the decline in lap time (r = -0.96; P < 0.05), and a trend (P = 0.081) was found between TF150 and average intermittent HIU speed (r = 0.92). However, other measures (V)over dot O-2peak, PPO, T-vent, and TT40) were not related to HIU performance. Measures of high-intensity endurance performance (TF100, TF150) were better predictors of intermittent HIU performance than traditional laboratory-based measures of aerobic capacity.
Resumo:
The study of electricity markets operation has been gaining an increasing importance in last years, as result of the new challenges that the electricity markets restructuring produced. This restructuring increased the competitiveness of the market, but with it its complexity. The growing complexity and unpredictability of the market’s evolution consequently increases the decision making difficulty. Therefore, the intervenient entities are forced to rethink their behaviour and market strategies. Currently, lots of information concerning electricity markets is available. These data, concerning innumerous regards of electricity markets operation, is accessible free of charge, and it is essential for understanding and suitably modelling electricity markets. This paper proposes a tool which is able to handle, store and dynamically update data. The development of the proposed tool is expected to be of great importance to improve the comprehension of electricity markets and the interactions among the involved entities.
Resumo:
Monitoring is a very important aspect to consider when developing real-time systems. However, it is also important to consider the impact of the monitoring mechanisms in the actual application. The use of Reflection can provide a clear separation between the real-time application and the implemented monitoring mechanisms, which can be introduced (reflected) into the underlying system without changing the actual application part of the code. Nevertheless, controlling the monitoring system itself is still a topic of research. The monitoring mechanisms must contain knowledge about “how to get the information out”. Therefore, this paper presents the ongoing work to define a suitable strategy for monitoring real-time systems through the use of Reflection.
Resumo:
This paper presents an architecture (Multi-μ) being implemented to study and develop software based fault tolerant mechanisms for Real-Time Systems, using the Ada language (Ada 95) and Commercial Off-The-Shelf (COTS) components. Several issues regarding fault tolerance are presented and mechanisms to achieve fault tolerance by software active replication in Ada 95 are discussed. The Multi-μ architecture, based on a specifically proposed Fault Tolerance Manager (FTManager), is then described. Finally, some considerations are made about the work being done and essential future developments.
Resumo:
In this paper we discuss challenges and design principles of an implementation of slot-based tasksplitting algorithms into the Linux 2.6.34 version. We show that this kernel version is provided with the required features for implementing such scheduling algorithms. We show that the real behavior of the scheduling algorithm is very close to the theoretical. We run and discuss experiments on 4-core and 24-core machines.
Resumo:
Existing work in the context of energy management for real-time systems often ignores the substantial cost of making DVFS and sleep state decisions in terms of time and energy and/or assume very simple models. Within this paper we attempt to explore the parameter space for such decisions and possible constraints faced.
Resumo:
Not just with the emergence but also with the growing of the electronic market, that is, the growth of online suppliers of services and products and Internet users (potential consumers), the necessary conditions to the affirmation of the agile/virtual enterprises (A/VE) as a present and future enterprise organizational model are created. In this context, it is our understanding that the broker may have an important role in its development, namely, if the broker performs functions for the A/VE with better efficacy and efficiency. In this article, we will present first a revision of the broker’s models in a structured form. We present a taxonomy of possible broker’s functions for the broker’s actuation near the A/VE and then the classification of the literature broker’s models. This classification will permit an analysis of a broker’s model and establish a mainframe for our broker’s model according to the BM_Virtual Enterprise Architecture Reference Model (BM_VEARM).
Resumo:
In recent papers, the authors obtained formulas for directional derivatives of all orders, of the immanant and of the m-th xi-symmetric tensor power of an operator and a matrix, when xi is a character of the full symmetric group. The operator norm of these derivatives was also calculated. In this paper, similar results are established for generalized matrix functions and for every symmetric tensor power.
Resumo:
Recent changes of paradigm in power systems opened the opportunity to the active participation of new players. The small and medium players gain new opportunities while participating in demand response programs. This paper explores the optimal resources scheduling in two distinct levels. First, the network operator facing large wind power variations makes use of real time pricing to induce consumers to meet wind power variations. Then, at the consumer level, each load is managed according to the consumer preferences. The two-level resources schedule has been implemented in a real-time simulation platform, which uses hardware for consumer’ loads control. The illustrative example includes a situation of large lack of wind power and focuses on a consumer with 18 loads.
Resumo:
Accepted in 13th IEEE Symposium on Embedded Systems for Real-Time Multimedia (ESTIMedia 2015), Amsterdam, Netherlands.
Resumo:
23rd Euromicro International Conference on Parallel, Distributed, and Network-Based Processing (PDP 2015). 4 to 6, Mar, 2015. Turku, Finland.