884 resultados para Project Life Cycle


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper uses the lens of life-cycle thinking to discuss recent developments in the Australian mass market fashion industry, and to explore the opportunities and barriers to implementing lifecycle thinking within mass market design processes. Life-cycle analysis is a quantitative tool used to assess the environmental impact of a material or product. However the underlying thinking of life-cycle analysis can also be employed more generally, enabling a designer to assess their processes and design decisions for sustainability. A fashion designer employing life cycle thinking would consider every stage in the life of a garment from fibre and textiles through to consumer use, to eventual disposal and beyond disposal to reuse and later disassembly for fibre recycling. Although life-cycle thinking is rarely considered in the design processes of the fast-paced, price-driven mass market, this paper explores its potential and suggests ways in which it could be implemented.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Despite of a significant contribution of transport sector in the global economy and society, it is one of the largest sources of global energy consumption, green house gas emissions and environmental pollutions. A complete look onto the whole life cycle environmental inventory of this sector will be helpful to generate a holistic understanding of contributory factors causing emissions. Previous studies were mainly based on segmental views which mostly compare environmental impacts of different modes of transport, but very few consider impacts other than the operational phase. Ignoring the impacts of non-operational phases, e.g., manufacture, construction, maintenance, may not accurately reflect total contributions on emissions. Moreover an integrated study for all motorized modes of road transport is also needed to achieve a holistic estimation. The objective of this study is to develop a component based life cycle inventory model which considers impacts of both operational and non-operational phases of the whole life as well as different transport modes. In particular, the whole life cycle of road transport has been segmented into vehicle, infrastructure, fuel and operational components and inventories have been conducted on each component. The inventory model has been demonstrated using the road transport of Singapore. Results show that total life cycle green house gas emissions from the road transport sector of Singapore is 7.8 million tons per year, among which operational phase and non-operational phases contribute about 55% and about 45%, respectively. Total amount of criteria air pollutants are 46, 8.5, 33.6, 13.6 and 2.6 thousand tons per year for CO, SO2, NOx, VOC and PM10, respectively. From the findings, it can be deduced that stringent government policies on emission control measures have a significant impact on reducing environmental pollutions. In combating global warming and environmental pollutions the promotion of public transport over private modes is an effective sustainable policy.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Designing practical rules for controlling invasive species is a challenging task for managers, particularly when species are long-lived, have complex life cycles and high dispersal capacities. Previous findings derived from plant matrix population analyses suggest that effective control of long-lived invaders may be achieved by focusing on killing adult plants. However, the cost-effectiveness of managing different life stages has not been evaluated. We illustrate the benefits of integrating matrix population models with decision theory to undertake this evaluation, using empirical data from the largest infestation of mesquite (Leguminosae: Prosopis spp) within Australia. We include in our model the mesquite life cycle, different dispersal rates and control actions that target individuals at different life stages with varying costs, depending on the intensity of control effort. We then use stochastic dynamic programming to derive cost-effective control strategies that minimize the cost of controlling the core infestation locally below a density threshold and the future cost of control arising from infestation of adjacent areas via seed dispersal. Through sensitivity analysis, we show that four robust management rules guide the allocation of resources between mesquite life stages for this infestation: (i) When there is no seed dispersal, no action is required until density of adults exceeds the control threshold and then only control of adults is needed; (ii) when there is seed dispersal, control strategy is dependent on knowledge of the density of adults and large juveniles (LJ) and broad categories of dispersal rates only; (iii) if density of adults is higher than density of LJ, controlling adults is most cost-effective; (iv) alternatively, if density of LJ is equal or higher than density of adults, management efforts should be spread between adults, large and to a lesser extent small juveniles, but never saplings. Synthesis and applications.In this study, we show that simple rules can be found for managing invasive plants with complex life cycles and high dispersal rates when population models are combined with decision theory. In the case of our mesquite population, focussing effort on controlling adults is not always the most cost-effective way to meet our management objective.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A cost estimation method is required to estimate the life cycle cost of a product family at the early stage of product development in order to evaluate the product family design. There are difficulties with existing cost estimation techniques in estimating the life cycle cost for a product family at the early stage of product development. This paper proposes a framework that combines a knowledge based system and an activity based costing techniques in estimating the life cycle cost of a product family at the early stage of product development. The inputs of the framework are the product family structure and its sub function. The output of the framework is the life cycle cost of a product family that consists of all costs at each product family level and the costs of each product life cycle stage. The proposed framework provides a life cycle cost estimation tool for a product family at the early stage of product development using high level information as its input. The framework makes it possible to estimate the life cycle cost of various product family that use any types of product structure. It provides detailed information related to the activity and resource costs of both parts and products that can assist the designer in analyzing the cost of the product family design. In addition, it can reduce the required amount of information and time to construct the cost estimation system.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Poem

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The continuous growth of high-rise residential properties indicates that there is a need for an effective property management system to provide a sustainable high-rise residential property development. As intensive as these studies are, they do not attempt to investigate the correlation between property management systems with the trends of Malaysia high-rise residential property development. By examining the trends and scenario of Malaysia high-rise residential property development, this paper aims to gain an understanding of impacts from the effectiveness of property management in this scope area. Findings from this scoping paper will assist in providing a greater understanding and possible solutions for the current Malaysian property management systems for the expanding high-rise residential unit market.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The demand of implementing Whole Life Cycle Costing (WLCC) towards property development has increased since the launch of Value Management Circular 3/2009 by the Economic Planning Unit Malaysia. The circular made compulsory for all public construction projects and programme including property development estimated more than RM 50 Million to conduct WLCC. However, a knowledge gap on WLCC approach still exists and become a barrier among the practitioner in Malaysia particularly in property development industry. The main focus of this paper is to discuss the WLCC approach and introduce the indicator that need to be considered in Malaysia property development.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Most commonly, residents are always arguing about the satisfaction of sustainability and quality of their high rise residential property. This paper aim is to maintain the best quality satisfaction of the door hardware by introducing the whole life cycle costing approach to the property manager of the public housing in Johor. This paper looks into the current situation of ironmongeries (door hardware) of 2 public housings in Johor, Malaysia and testing the whole life cycle costing approach towards them. The calculation and the literature review are conducted. The questionnaire surveys of 2 public housings were conducted to make clear the occupants’ evaluation about the actual quality conditions of the ironmongeries in their house. As a result, the quality of door hardware based on the whole life cycle costing approach is one of the best among their previous decision making tool that have been applied. Practitioners can benefit from this paper as it provides information on calculating the whole life costing and making the decisions about ironmongeries selection of their properties.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Most commonly, residents are always arguing about the satisfaction of sustainability and quality of their high rise residential property. This paper aim is to maintain the best quality satisfaction of the floor materials by introducing the whole life cycle costing approach to the property manager of the public housing in Johor. This paper looks into the current situation of floor material of two public housings in Johor, Malaysia and testing the whole life cycle costing approach towards them. The cost figures may be implemented to justify higher investments, for examples, in the quality or flexibility of building solutions through a long-term cost reduction. The calculation and the literature review are conducted. The questionnaire surveys of two public housings were conducted to make clear the occupants’ evaluation about the actual quality conditions of the floor material in their house. As a result, the quality of floor material based on the whole life cycle costing approach is one of the best among their previous decision making tool that was applied. Practitioners can benefit from this paper as it provides information on calculating the whole life costing and making the decisions for floor material selection for their properties.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Despite of significant contributions of urban road transport to global economy and society, it is one of the largest sources of local and global emission impact. In order to address the environmental concerns of urban road transport it is imperative to achieve a holistic understanding of contributory factors causing emissions which requires a complete look onto its whole life cycle. Previous studies were mainly based on segmental views which mostly studied environmental impacts of individual transport modes and very few considered impacts other than operational phase. This study develops an integrated life cycle inventory model for urban road transport emissions from a holistic modal perspective. Singapore case was used to demonstrate the model. Results show that total life cycle greenhouse gas emission from Singapore’s road transport sector is 7.8 million tons per year. The total amount of criteria air pollutants are also estimated in this study.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Nowadays, most of the infrastructure development projects undertaken are complex in nature. Practically, public clients who do not have a good understanding of the design and management may suffer severe losses, especially for infrastructure projects. There is a need for luring the right consultant to secure client's investment in infrastructure developments. Throughout the project life cycle, consultants play vital role from the inception to completion stage of a project. A few studies in Malaysia show that infrastructure projects involving irrigation and drainage have experience problems such as poor workmanship, delay and cost overrun due to the consultant's inability or the client incompetence of recruiting consultants in time. This highlights the need of aided decision making and an efficient system to select the best consultant by using Decision Support System (DSS). On the other hand, recent trends reveal that most DSS in construction only concentrate on decision model development. These models are impractical and unused as they are complicated or difficult for laymen such as project managers to utilize. Thus, this research attempts to develop an efficient DSS for consultant selection namely consultDeSS. Driven by the motivation and research aims, this study deployed Design Science Research Methodology (DSRM) dominant with a combination of case studies at the Malaysian Department of Irrigation and Drainage (DID). Two real projects involving irrigation and drainage infrastructure were used to design, implement and evaluate the artefact. The 3-tier consultDeSS was revised after the evaluation and the design was significantly improved based on user feedback. By developing desirable tools that fit client's needs will enhance the productivity and minimize conflict within groups and organisations. The tool is more usable and efficient compared to previous studies in construction. Thus, this research has demonstrated a purposeful artefact with a practical and valid structured development approach that is applicable in a variety of problems in construction discipline.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Defining success in mega projects has been a challenging exercise for Australian Defence. The inherent conflict between nation capability building and cost efficiency raises questions about how to appropriately define mega project success. Contrary to the traditional output-focused project methodology, the value creation perspective argues for the importance of creating new knowledge, processes, and systems for suppliers and customers. Stakeholder involvement is important in this new perspective, as the balancing of competing needs of stakeholders in mega projects becomes a major challenge in managing the value co-creation process. In our earlier study reported interview data from three Australian defence mega projects and reported that those senior executives have a more complex understanding of project success than traditional iron triangle measures. In these mega defence projects, customers and other stakeholders actively engage in the value creation process, and over time both content and process value are created to increase defence and national capability. Value created and captured during and post projects are the key to true success. We aim to develop a comprehensive theoretical model the capture the value co-creation process as a way of re-conceptualising success in mega projects. We propose a new framework redefine project value as multi-dimensional, contextual and temporal construct that emerges from the interactions among multiple stake holders over the complete project life cycle. The framework distinguishes between exploitation and exploration types of projects, and takes into consideration the requisite governance structures.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Road infrastructure has been considered as one of the most expensive and extensive infrastructure assets of the built environment globally. This asset also impacts the natural environment significantly during different phases of life e.g. construction, use, maintenance and end-of-life. The growing emphasis for sustainable development to meet the needs of future generations requires mitigation of the environmental impacts of road infrastructure during all phases of life e.g. construction, operation and end-of-life disposal (as required). Life-cycle analysis (LCA), a method of quantification of all stages of life, has recently been studied to explore all the environmental components of road projects due to limitations of generic environmental assessments. The LCA ensures collection and assessment of the inputs and outputs relating to any potential environmental factor of any system throughout its life. However, absence of a defined system boundary covering all potential environmental components restricts the findings of the current LCA studies. A review of the relevant published LCA studies has identified that environmental components such as rolling resistance of pavement, effect of solar radiation on pavement(albedo), traffic congestion during construction, and roadway lighting & signals are not considered by most of the studies. These components have potentially higher weightings for environment damage than several commonly considered components such as materials, transportation and equipment. This paper presents the findings of literature review, and suggests a system boundary model for LCA study of road infrastructure projects covering potential environmental components.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Global climate change is one of the most significant environmental impacts at the moment. One central issue for the building and construction industry to address global climate change is the development of credible carbon labelling schemes for building materials. Various carbon labelling schemes have been developed for concrete due to its high contribution to global greenhouse gas (GHG) emissions. However, as most carbon labelling schemes adopt cradle-to-gate as system boundary, the credibility of the eco-label information may not be satisfactory because recent studies show that the use and end-of-life phases can have a significant impact on the life cycle GHG emissions of concrete in terms of carbonation, maintenance and rehabilitation, other indirect emissions, and recycling activities. A comprehensive review on the life cycle assessment of concrete is presented to holistically examine the importance of use and end-of-life phases to the life cycle GHG quantification of concrete. The recent published ISO 14067: Carbon footprint of products – requirements and guidelines for quantification and communication also mandates the use of cradle-to-grave to provide publicly available eco-label information when the use and end-of-life phases of concrete can be appropriately simulated. With the support of Building Information Modelling (BIM) and other simulation technologies, the contribution of use and end-of-life phases to the life cycle GHG emissions of concrete should not be overlooked in future studies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The US National Institute of Standards and Technology (NIST) showed that, in 2004, owners and operations managers bore two thirds of the total industry cost burden from inadequate interoperability in construction projects from inception to operation, amounting to USD10.6 billion. Building Information Modelling (BIM) and similar tools were identified by Engineers Australia in 2005 as potential instruments to significantly reduce this sum, which in Australia could amount to total industry-wide cost burden of AUD12 billion. Public sector road authorities in Australia have a key responsibility in driving initiatives to reduce greenhouse gas emissions from the construction and operations of transport infrastructure. However, as previous research has shown the Environmental Impact Assessment process, typically used for project approvals and permitting based on project designs available at the consent stage, lacks Key Performance Indicators (KPIs) that include long-term impact factors and transfer of information throughout the project life cycle. In the building construction industry, BIM is widely used to model sustainability KPIs such as energy consumption, and integrated with facility management systems. This paper proposes that a similar use of BIM in early design phases of transport infrastructure could provide: (i) productivity gains through improved interoperability and documentation; (ii) the opportunity to carry out detailed cost-benefit analyses leading to significant operational cost savings; (iii) coordinated planning of street and highway lighting with other energy and environmental considerations; iv) measurable KPIs that include long-term impact factors which are transferable throughout the project life cycle; and (v) the opportunity for integrating design documentation with sustainability whole-of-life targets.