Resumo:
The project has further developed two programs for the industry partners related to service life prediction and salt deposition. The program for Queensland Department of Main Roads which predicts salt deposition on different bridge structures at any point in Queensland has been further refined by looking at more variables. It was found that the height of the bridge significantly affects the salt deposition levels only when very close to the coast. However the effect of natural cleaning of salt by rainfall was incorporated into the program. The user interface allows selection of a location in Queensland, followed by a bridge component. The program then predicts the annual salt deposition rate and rates the likely severity of the environment. The service life prediction program for the Queensland Department of Public Works has been expanded to include 10 common building components, in a variety of environments. Data mining procedures have been used to develop the program and increase the usefulness of the application. A Query Based Learning System (QBLS) has been developed which is based on a data-centric model with extensions to provide support for user interaction. The program is based on number of sources of information about the service life of building components. These include the Delphi survey, the CSIRO Holistic model and a school survey. During the project, the Holistic model was modified for each building component and databases generated for the locations of all Queensland schools. Experiments were carried out to verify and provide parameters for the modelling. These included instrumentation of a downpipe, measurements on pH and chloride levels in leaf litter, EIS measurements and chromate leaching from Colorbond materials and dose tests to measure corrosion rates of new materials. A further database was also generated for inclusion in the program through a large school survey. Over 30 schools in a range of environments from tropical coastal to temperate inland were visited and the condition of the building components rated on a scale of 0-5. The data was analysed and used to calculate an average service life for each component/material combination in the environments, where sufficient examples were available.
Resumo:
The Your Building Project to build a website as the business and technical guide to sustainable commercial buildings has now been completed. The site is available at www.yourbuilding.org. The project was delivered to meet the requirements of the funding agreement between the Commonwealth of Australia represented by the Department of the Environment and Heritage (now Department of the Environment and Water Resources) and the Cooperative Research Centre for Construction Innovation (Construction Innovation).
Resumo:
Designing and estimating civil concrete structures is a complex process which to many practitioners is tied to manual or semi-manual processes of 2D design and cannot be further improved by automated, interacting design-estimating processes. This paper presents a feasibility study for the development an automated estimator for concrete bridge design. The study offers a value proposition: an efficient automated model-based estimator can add value to the whole bridge design-estimating process, i.e., reducing estimation errors, shortening the duration of success estimates, and increasing the benefit of doing cost estimation when compared with the current practice. This is then followed by a description of what is in an efficient automated model-based estimator and how it should be used. Finally the process of model-based estimating is compared with the current practice to highlight the values embedded in the automated processes.
Resumo:
This paper provides an overview of the Australian Governments Facilities Management (FM) Action Agenda as announced in 2004 as a key policy plank designed to facilitate growth of the FM industry. The resulting consultation with industry leaders has seen the criterion and release in April 2005 of the FM Action Agendas strategic plan entitled Managing the Built Environment. This framework, representing a collaboration between the Australian Government, public and private sector stakeholders and Facility Management Association of Australia (FMA Australia) and other allied bodies, sets out to achieve the vision of a more productive and sustainable built environment through improved innovation, education and standards. The 36 month implementation phase is now underway and will take a multi-pronged approach to enhancing the recognition of the FM industry and removing impediments to its growth with a 20 point action plan across the following platforms: Innovation Improved appreciation of facility life cycles, and greater understanding of the key drivers of workplace productivity, and the improved application of information technology. Education and Training Improved access to dedicated FM education and training opportunities and creation clear career pathways into the profession. Regulatory Reform Explore opportunities to harmonise cross jurisdictional regulatory compliance requirements that have an efficiency impact on FM. Sustainability Improved utilization of existing knowledge and the development of tools and opportunities to improve the environmental performance of facilities. Additional information is available at www.fma.com.au
Resumo:
Facility managers have to acquire, integrate, edit and update diverse facility information ranging from building elements & fabric data, operational costs, contract types, room allocation, logistics, maintenance, etc. With the advent of standardized Building Information Models (BIM) such as the Industry Foundation Classes (IFC) new opportunities are available for Facility Managers to manage their FM data. The usage of IFC supports data interoperability between different software systems including the use of operational data for facility management systems. Besides the re-use of building data, the Building Information Model can be used as an information framework for storing and retrieving FM related data. Currently several BIM driven FM systems are available including IFC compliant ones. These systems have the potential to not only manage primary data more effectively but also to offer practical systems for detailed monitoring, and analysis of facility performance that can underpin innovative and more cost effective management of complex facilities.
Resumo:
Real-World Data Mining Applications generally do not end up with the creation of the models. The use of the model is the final purpose especially in prediction tasks. The problem arises when the model is built based on much more information than that the user can provide in using the model. As a result, the performance of model reduces drastically due to many missing attributes values. This paper develops a new learning system framework, called as User Query Based Learning System (UQBLS), for building data mining models best suitable for users use. We demonstrate its deployment in a real-world application of the lifetime prediction of metallic components in buildings
Resumo:
This paper deals with the problem of using the data mining models in a real-world situation where the user can not provide all the inputs with which the predictive model is built. A learning system framework, Query Based Learning System (QBLS), is developed for improving the performance of the predictive models in practice where not all inputs are available for querying to the system. The automatic feature selection algorithm called Query Based Feature Selection (QBFS) is developed for selecting features to obtain a balance between the relative minimum subset of features and the relative maximum classification accuracy. Performance of the QBLS system and the QBFS algorithm is successfully demonstrated with a real-world application
Resumo:
Off-site manufacture (OSM) offers numerous benefits to all parties in the construction process. The uptake of OSM in Australia has, however, been limited. This limited uptake corresponds to similar trends in the UK and US, although the level of OSM there appears to be increasing. This project undertook three workshops one each in Victoria, Queensland and Western Australia and 18 interviews with key stakeholders to assist in identifying the general benefits and barriers to OSM uptake in the Australian construction industry. Seven case studies were also undertaken, involving construction projects that used OSM, ranging from civil projects through to residential. Each of these case studies has been analysed to identify what worked and what didnt, and suggest the lessons to be learned from each project.
Resumo:
Much has been written on Off-site Manufacture (OSM) in construction, particularly regarding the perceived benefits and barriers to implementation. However, very little understanding of the state of OSM in the Australian construction industry exists. A scoping study' has recently been undertaken to determine the state-of-the-art of OSM in Australia. This involved several industry workshops, interviews and case studies across four major states of Australia. The study surveyed a range of suppliers across the construction supply-chain, incorporating the civil, commercial and housing segments of the market. This revealed that skills shortages and lack of adequate OSM knowledge are generally the greatest issues facing OSM in Australia. The drivers and constraints that emerged from the research were, in large measure, consistent with those found in the US and UK, although some Australian anomalies are evident, such as the geographical disparity of markets. A comparative analysis with similar studies in the UK and US is reported, illustrating both the drivers and constraints confronting the industry in Australia. OSM uptake into the future is however dependent on many factors, not least of which is a better understanding of the construction process and its associated costs.
Resumo:
The digital modelling research stream of the Sydney Opera House FM Exemplar Project has demonstrated significant benefits in digitising design documentation and operational and maintenance manuals. Since Sydney Opera House did not have digital models of its structure, there was an opportunity to investigate the application of digital modelling using standardised Building Information Models (BIM) to support facilities management (FM).The focus of this investigation was on the following areas:the re-usability of standardised BIM for FM purposesthe potential of BIM as an information framework acting as integrator for various FM data sources the extendibility and flexibility of the BIM to cope with business-specific data and requirements commercial FM software using standardised BIMthe ability to add (organisation-specific) intelligence to the modela roadmap for Sydney Opera House to adopt BIM for FM.
Resumo:
Purpose : Effective flow of data and communication at every stage of a construction project is essential for achieving required coordination and collaboration between the project participants, leading to successful management of the projects. In present scenario, when project participants are geographically separated, adoption of information communication technology (ICT) enables such effective communication. Thus, the purpose of this paper is to focus on ICT adoption for building project management.---------- Design/methodology/approach : It is difficult to quantitatively evaluate the benefits of ICT adoption in the multiple enterprise scenario of building project management. It requires qualitative analysis based on the perceptions of the construction professionals. The paper utilizes interpretive structural modeling (ISM) technique to assess importance of perceived benefits and their driving power and dependence on other benefits.---------- Findings : The developed ISM model shows that all the categories of benefits, i.e. benefits related to projects, team management, technology, and organization are inter-related and cannot be achieved in isolation. But, organization- and technology-related benefits have high-driving power and these are strategic benefits for the project team organizations. Thus, organizations are required to give more attention on strategically increasing these benefits from application of ICT. Originality/value This analysis provides a road map to managers or project management organizations to decide that if they are planning ICT adoption for achieving certain benefits then which are the other driving benefits that should be achieved prior to that and also which are the dependent benefits that would be achieved by default.