996 resultados para Problems-conflicts


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This chapter describes an evidence-based programme called the Resourceful Adolescent Program (RAP), which has been successful in building resilience in young people to prevent depressive symptoms developing.The programme adopts a strengths-focused approach. It aims to build a range of coping resources that foster teenagers’ abilities to maintain a positive sense of self and regulate emotions in the face of the vicissitudes of everyday struggles and difficult life events.This groupbased programme can be implemented routinely in schools or by counselling professionals as an early intervention or prevention programme. While there is no universal definition, ‘resilience’ generally means the process of avoiding the negative trajectories associated with exposure to risk factors (Fergus and Zimmerman, 2005). Current models of resilience are also very clear that there ‘are many pathways to resilience’ (Bonanno, 2004) and there is no

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper, the problems of three carrier phase ambiguity resolution (TCAR) and position estimation (PE) are generalized as real time GNSS data processing problems for a continuously observing network on large scale. In order to describe these problems, a general linear equation system is presented to uniform various geometry-free, geometry-based and geometry-constrained TCAR models, along with state transition questions between observation times. With this general formulation, generalized TCAR solutions are given to cover different real time GNSS data processing scenarios, and various simplified integer solutions, such as geometry-free rounding and geometry-based LAMBDA solutions with single and multiple-epoch measurements. In fact, various ambiguity resolution (AR) solutions differ in the floating ambiguity estimation and integer ambiguity search processes, but their theoretical equivalence remains under the same observational systems models and statistical assumptions. TCAR performance benefits as outlined from the data analyses in some recent literatures are reviewed, showing profound implications for the future GNSS development from both technology and application perspectives.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Principal Topic: Project structures are often created by entrepreneurs and large corporate organizations to develop new products. Since new product development projects (NPDP) are more often situated within a larger organization, intrapreneurship or corporate entrepreneurship plays an important role in bringing these projects to fruition. Since NPDP often involves the development of a new product using immature technology, we describe development of an immature technology. The Joint Strike Fighter (JSF) F-35 aircraft is being developed by the U.S. Department of Defense and eight allied nations. In 2001 Lockheed Martin won a $19 billion contract to develop an affordable, stealthy and supersonic all-weather strike fighter designed to replace a wide range of aging fighter aircraft. In this research we define a complex project as one that demonstrates a number of sources of uncertainty to a degree, or level of severity, that makes it extremely difficult to predict project outcomes, to control or manage project (Remington & Zolin, Forthcoming). Project complexity has been conceptualized by Remington and Pollock (2007) in terms of four major sources of complexity; temporal, directional, structural and technological complexity (See Figure 1). Temporal complexity exists when projects experience significant environmental change outside the direct influence or control of the project. The Global Economic Crisis of 2008 - 2009 is a good example of the type of environmental change that can make a project complex as, for example in the JSF project, where project managers attempt to respond to changes in interest rates, international currency exchange rates and commodity prices etc. Directional complexity exists in a project where stakeholders' goals are unclear or undefined, where progress is hindered by unknown political agendas, or where stakeholders disagree or misunderstand project goals. In the JSF project all the services and all non countries have to agree to the specifications of the three variants of the aircraft; Conventional Take Off and Landing (CTOL), Short Take Off/Vertical Landing (STOVL) and the Carrier Variant (CV). Because the Navy requires a plane that can take off and land on an aircraft carrier, that required a special variant of the aircraft design, adding complexity to the project. Technical complexity occurs in a project using technology that is immature or where design characteristics are unknown or untried. Developing a plane that can take off on a very short runway and land vertically created may highly interdependent technological challenges to correctly locate, direct and balance the lift fans, modulate the airflow and provide equivalent amount of thrust from the downward vectored rear exhaust to lift the aircraft and at the same time control engine temperatures. These technological challenges make costing and scheduling equally challenging. Structural complexity in a project comes from the sheer numbers of elements such as the number of people, teams or organizations involved, ambiguity regarding the elements, and the massive degree of interconnectedness between them. While Lockheed Martin is the prime contractor, they are assisted in major aspects of the JSF development by Northrop Grumman, BAE Systems, Pratt & Whitney and GE/Rolls-Royce Fighter Engineer Team and innumerable subcontractors. In addition to identifying opportunities to achieve project goals, complex projects also need to identify and exploit opportunities to increase agility in response to changing stakeholder demands or to reduce project risks. Complexity Leadership Theory contends that in complex environments adaptive and enabling leadership are needed (Uhl-Bien, Marion and McKelvey, 2007). Adaptive leadership facilitates creativity, learning and adaptability, while enabling leadership handles the conflicts that inevitably arise between adaptive leadership and traditional administrative leadership (Uhl-Bien and Marion, 2007). Hence, adaptive leadership involves the recognition and opportunities to adapt, while and enabling leadership involves the exploitation of these opportunities. Our research questions revolve around the type or source of complexity and its relationship to opportunity recognition and exploitation. For example, is it only external environmental complexity that creates the need for the entrepreneurial behaviours, such as opportunity recognition and opportunity exploitation? Do the internal dimensions of project complexity, such as technological and structural complexity, also create the need for opportunity recognition and opportunity exploitation? The Kropp, Zolin and Lindsay model (2009) describes a relationship between entrepreneurial orientation (EO), opportunity recognition (OR), and opportunity exploitation (OX) in complex projects, with environmental and organizational contextual variables as moderators. We extend their model by defining the affects of external complexity and internal complexity on OR and OX. ---------- Methodology/Key Propositions: When the environment complex EO is more likely to result in OR because project members will be actively looking for solutions to problems created by environmental change. But in projects that are technologically or structurally complex project leaders and members may try to make the minimum changes possible to reduce the risk of creating new problems due to delays or schedule changes. In projects with environmental or technological complexity project leaders who encourage the innovativeness dimension of EO will increase OR in complex projects. But projects with technical or structural complexity innovativeness will not necessarily result in the recognition and exploitation of opportunities due to the over-riding importance of maintaining stability in the highly intricate and interconnected project structure. We propose that in projects with environmental complexity creating the need for change and innovation project leaders, who are willing to accept and manage risk, are more likely to identify opportunities to increase project effectiveness and efficiency. In contrast in projects with internal complexity a much higher willingness to accept risk will be necessary to trigger opportunity recognition. In structurally complex projects we predict it will be less likely to find a relationship between risk taking and OP. When the environment is complex, and a project has autonomy, they will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. When a project experiences high competitive aggressiveness and their environment is complex, project leaders will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. This paper reports the first stage of a three year study into the behaviours of managers, leaders and team members of complex projects. We conduct a qualitative study involving a Group Discussion with experienced project leaders. The objective is to determine how leaders of large and potentially complex projects perceive that external and internal complexity will influence the affects of EO on OR. ---------- Results and Implications: These results will help identify and distinguish the impact of external and internal complexity on entrepreneurial behaviours in NPDP. Project managers will be better able to quickly decide how and when to respond to changes in the environment and internal project events.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We investigate the roles of finn and country level agency conflicts in determining corporate payout policics. Based on a large sample of 29,610 firms in 42 countries from 2001 to 2006, we show there is a form of "pecking order" in investors' ability to extract cash (whether as dividends only or share repurchases) from firms. Although investors are able to use their legal powers to extract cash from firms in high protection countries, their ability to do so can be substantially hindered when agency costs at the firm level are high. In poor protection countries, investors seem to take whatever cash they can get, even though the amount may be small, and with scant regard for investment opportunities and firm level agency conflicts. Finally, compared to repurchases, we find dividends are more likely to be the sole method of payout in high protection countries and in non insider-dominated firms.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Contractual relationships have become increasingly strained in recent years in the construction industry result in the use of the judicial system for the settlement of contractual disagreements. Why is this so? Evidence from anecdotes suggest that the lack of capacity amongst owners and contractors to carry out a contract using a good practice approach during the construction of a project contribute to the occurrence of conflicts, losses, deficient contractual relationships and poor performance of the construction work. Recognizing that current forms of contract in use today perpetuate a legacy of construction problems, we are conducting explanatory research to examine whether the widely publicized benefits of New Engineering Contract (NEC) could be realized in the Australian construction industry. This paper outlines a research agenda that will help shed light on how contract forms are able to be used as a mechanism to ensure construction projects are delivered successfully whilst also meeting the goals of multiple stakeholders. Understanding the Critical Success Factors (CSFs), commonly used construction contracts and the NEC system can help us address some of these issues. However, there are gaps in the validation of the benefits of NEC and its link with project success. We identify some of these gaps and propose a methodology by which to gain insights into this phenomenon. Keywords: Project Success, Construction Contracting, New Engineering Contract (NEC)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper details a systematic literature review identifying problems in extant research relating to teachers’ attitudes towards reporting child sexual abuse, and offers a model for new attitude scale development and testing. Scale development comprised a five-phase process grounded in contemporary attitude theories including: a) developing the initial item pool; b) conducting a panel review; c) refining the scale via an expert focus group; d) building content validity through cognitive interviews; e) assessing internal consistency via field testing. The resulting 21-item scale displayed construct validity in preliminary testing. The scale may prove useful as a research tool, given the theoretical supposition that attitudes may be changed with time, context, experience, and education. Further investigation with a larger sample is warranted.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In an age where financial transactions are conducted worldwide and mobility of citizens throughout the world is common, lawyers seeking to serve Bankruptcy Notices and Creditor’s Petitions encounter many problems. To assist lawyers in overcoming some of the service problems that are arising as a result of this changing world, a number of recent cases are considered that highlight a number of issues, including American Express Australia Limited v Michaels [2010] FMCA 103, Deputy Commissioner of Taxation v Barnes (2008) 70 ATR 776; [2008] FMCA 7, Battenberg v Restom & Ors (2005) 223 ALR 692; upheld by the Full Federal Court in Battenberg v Restrom and Ors (2006) 149 FCR 128 at 133; [2006] FCAFC 20 and Envee Energy Pty Ltd (In Liquidation) v Stockford [2007] FMCA 1426. While the fact situation of every bankruptcy case will differ, recent decisions may assist lawyers in dealing effectively with bankruptcy matters in these times of transition. Lawyers can facilitate completion of the litigious process within the relevant legislative framework in order to satisfy their responsibility to clients and to the Court by considering this case law.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A point interpolation method with locally smoothed strain field (PIM-LS2) is developed for mechanics problems using a triangular background mesh. In the PIM-LS2, the strain within each sub-cell of a nodal domain is assumed to be the average strain over the adjacent sub-cells of the neighboring element sharing the same field node. We prove theoretically that the energy norm of the smoothed strain field in PIM-LS2 is equivalent to that of the compatible strain field, and then prove that the solution of the PIM- LS2 converges to the exact solution of the original strong form. Furthermore, the softening effects of PIM-LS2 to system and the effects of the number of sub-cells that participated in the smoothing operation on the convergence of PIM-LS2 are investigated. Intensive numerical studies verify the convergence, softening effects and bound properties of the PIM-LS2, and show that the very ‘‘tight’’ lower and upper bound solutions can be obtained using PIM-LS2.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Presentation about internet based interventions for depression, substance and alcohol abuse.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Relatively little information has been reported about foot and ankle problems experienced by nurses, despite anecdotal evidence which suggests they are common ailments. The purpose of this study was to improve knowledge about the prevalence of foot and ankle musculoskeletal disorders (MSDs) and to explore relationships between these MSDs and proposed risk factors. A review of the literature relating to work-related MSDs, MSDs in nursing, foot and lower-limb MSDs, screening for work-related MSDs, foot discomfort, footwear and the prevalence of foot problems in the community was undertaken. Based on the review, theoretical risk factors were proposed that pertained to the individual characteristics of the nurses, their work activity or their work environment. Three studies were then undertaken. A cross-sectional survey of 304 nurses, working in a large tertiary paediatric hospital, established the prevalence of foot and ankle MSDs. The survey collected information about self-reported risk factors of interest. The second study involved the clinical examination of a subgroup of 40 nurses, to examine changes in body discomfort, foot discomfort and postural sway over the course of a single work shift. Objective measurements of additional risk factors, such as individual foot posture (arch index) and the hardness of shoe midsoles, were performed. A final study was used to confirm the test-retest reliability of important aspects of the survey and key clinical measurements. Foot and ankle problems were the most common MSDs experienced by nurses in the preceding seven days (42.7% of nurses). They were the second most common MSDs to cause disability in the last 12 months (17.4% of nurses), and the third most common MSDs experienced by nurses in the last 12 months (54% of nurses). Substantial foot discomfort (Visual Analogue Scale (VAS) score of 50mm or more) was experienced by 48.5% of nurses at sometime in the last 12 months. Individual risk factors, such as obesity and the number of self-reported foot conditions (e.g., callouses, curled toes, flat feet) were strongly associated with the likelihood of experiencing foot problems in the last seven days or during the last 12 months. These risk factors showed consistent associations with disabling foot conditions and substantial foot discomfort. Some of these associations were dependent upon work-related risk factors, such as the location within the hospital and the average hours worked per week. Working in the intensive care unit was associated with higher odds of experiencing foot problems within the last seven days, foot problems in the last 12 months and foot problems that impaired activity in the last 12 months. Changes in foot discomfort experienced within a day, showed large individual variability. Fifteen of the forty nurses experienced moderate/substantial foot discomfort at the end of their shift (VAS 25+mm). Analysis of the association between risk factors and moderate/substantial foot discomfort revealed that foot discomfort was less likely for nurses who were older, had greater BMI or had lower foot arches, as indicated by higher arch index scores. The nurses’ postural sway decreased over the course of the work shift, suggesting improved body balance by the end of the day. These findings were unexpected. Further clinical studies examining individual nurses on several work shifts are needed to confirm these results, particularly due to the small sample size and the single measurement occasion. There are more than 280,000 nurses registered to practice in Australia. The nursing workforce is ageing and the prevalence of foot problems will increase. If the prevalence estimates from this study are extrapolated to the profession generally, more than 70,000 hospital nurses have experienced substantial foot discomfort and 25-30,000 hospital nurses have been limited in their activity due to foot problems during the last 12 months. Nurses with underlying foot conditions were more likely to report having foot problems at work. Strategies to prevent or manage foot conditions exist and they should be disseminated to nurses. Obesity is a significant risk factor for foot and ankle MSDs and these nurses may need particular assistance to manage foot problems. The risk of foot problems for particular groups of nurses, e.g. obese nurses, may vary depending upon the location within the hospital. Further research is needed to confirm the findings of this study. Similar studies should be conducted in other occupational groups that require workers to stand for prolonged periods.