989 resultados para Plan Puebla Panamá
Resumo:
Introduction This study aimed to examine the geometric and dosimetric results when radiotherapy treatment plans are designed for prostate cancer patients with hip prostheses. Methods Ten EBRT treatment plans for localised prostate cancer, in the presence of hip prostheses, were analysed and compared with a reference set of 196 treatment plans for localised prostate cancer in patients without prostheses. Crowe et al.’s TADA code [1] was used to extract treatment plan parameters and evaluate doses to target volumes and critical structures against recommended goals [2] and constraints [3, 4]. Results The need to avoid transmitting the radiation beam through the hip prostheses limited the range of gantry angles available for use in both the rotational (VMAT) and the non-rotational (3DCRT and IMRT) radiotherapy treatments. This geometric limitation (exemplified in the VMAT data shown in Fig. 1) reduced the overall quality of the treatment plans for patients with prostheses compared to the reference plans. All plans with prostheses failed the PTV dose homogeneity requirement [2], whereas only 4 % of the plans without prostheses failed this test. Several treatment plans for patients with hip prostheses also failed the QUANTEC requirements that less than 50 % of the rectum receive 50 Gy and less than 35 % of the rectum receive 60 Gy to keep the grade 3 toxicity rate below 10 % [3], or the Hansen and Roach requirement that less than 25 % of the bladder receive 75 Gy [4]. Discussion and conclusions The results of this study exemplify the difficulty of designing prostate radiotherapy treatment plans, where beams provide adequate doses to targeted tissues while avoiding nearby organs at risk, when the presence of hip prostheses limits the available treatment geometries. This work provides qualitative evidence of the compromised dose distributions that can result, in such cases.
Resumo:
In 2012, the only South East Asian countries that have ratified the 1951 Convention relating to the Status of Refugees and the 1967 Protocol Relating to the Status of Refugees (hereafter referred to as the 1951 Convention and 1967 Protocol) is Philippines (signed 1954), Cambodia (signed 1995) and Timor Leste (signed 2001). Countries such as Indonesia, Malaysia and Thailand have annual asylum seeking populations from Myanmar, South Asia and Middle East, that are estimated to be at 15 000-20 000 per country (UNHCR 2012). The lack of a permanent and formal asylum processing process in these countries means that that asylum-seeking populations in the region are reliant on the local offices of the United Nations High Commission for Refugees based in the region to process their claims. These offices rely upon the good will of these governments to have a presence near detection camps and in capital cities to process claims of those who manage to reach the UNHCR representative office. The only burden sharing mechanism within the region primarily exists under the Bali Process on People Smuggling, Trafficking in Persons and Related Transnational Crime (the Bali Process), introduced in 2002. The Bali Process refers to an informal cooperative agreement amongst the states from the Asia-Pacific region, with Australia and Indonesia as the co-chairs, which discusses its namesake: primarily anti-people smuggling activities and migration protocols. There is no provision within this process to discuss the development of national asylum seeking legislation, processes for domestic processing of asylum claims or burden sharing in contrast to other regions such as Africa and South America (i.e. 2009 African Union Convention for the Protection and Assistance of the Internally Displaced, 1969 African Union Convention Governing the Specific Aspects of Refugee Problems in Africa and 1984 Cartagena Declaration on Refugees [Americas]) (PEF 2010: 19).
Resumo:
The Land Sales Act 1984 regulates “off the plan” sales in Queensland in conjunction with several provisions in the Body Corporate and Community Management Act 1997. Together the Acts regulate sales in both unit developments and housing estates. From 2010 to 2013 the Queensland Government undertook a comprehensive review of the Land Sales Act 1984 to identify opportunities to modernise and improve the legislation. Significant changes were recommended by the Review to align the Land Sales Act 1984 (LSA) with current surveying and conveyancing practice and to overcome a number of practical issues faced by developers under the current legislation. A significant outcome of the review is the removal of provisions related to off the plan community title sales from the LSA to the Body Corporate and Community Management Act 1997 (BCCMA) and the Building Units and Group Titles Act 1980 (BUGTA). This article examines the Land Sales and Other Legislation Amendment Act 2014 due to commence in November 2014.
Resumo:
2014 is the year for embedding the Reframe: QUT’s Evaluation Framework as core business within the University, with the following providing an outline of the Learning and Teaching Unit’s (LTU) planned activities to support this implementation. LTU is continuing its commitment to intensive support and engagement with the academic and teaching focused community within QUT. The Academic Quality and Standards team have extended the existing communication and dissemination activities into a comprehensive communication plan for 2014, with major initiatives defined within this document. It should be noted that these activities are aligned to the discussions from the 2013 Integrated Management of Feedback (IMF) Steering Group and as endorsed by the University Learning and Teaching Committee at their meeting in February, 2014.
Resumo:
IUCN´s core work involves generating knowledge and tools to influence policy and practice for nature conservation. Whilst it appears that we are collectively making progress in some areas, we acknowledge the need to improve our communication processes and practices to ´move to action´ in this regard. We need to extend the influence of the science and the knowledge beyond the documents to achieve effective impact and action. The training course will focus on the process of getting the conservation messages out to a wider audience. This interactive and participatory training course will develop the skills and knowledge needed to communicate effective conservation messages for a range of IUCN internal and external audiences. The course will cover: • what is communication for conservation? • the communication planning process (developing your communication objectives) • identifying and understanding your target audiences • developing your conservation message • choosing your communication media and • evaluating the effectiveness of your communication strategies. A unique feature of the training course will be the use of Web 2.0 tools in innovative conservation communications e.g. use of social media in concept branding and social marketing. In the spirit of the Forum´s objective of ´Sharing know how´, each participant will bring a current conservation issue to the training course and will leave with their own communication plan. Potentially, the training course adopts a cross-thematic approach as the issues addressed could be drawn from any of the IUCN´s program themes. Primarily though, the training course´s best fit is with the ´Valuing and Conserving Biodiversity´ theme since it will provide concrete and pragmatic solutions to enhancing the implementation of conservation measures through participatory planning and capacity building.
Resumo:
Abstract: Australia’s ecosystems are the basis of our current and future prosperity, and our national well-being.A strong and sustainable Australian ecosystem science enterprise is vital for understanding and securing these ecosystems in the face of current and future challenges. This Plan defines the vision and key directions for a national ecosystem science capability that will enable Australia to understand and effectively manage its ecosystems for decades to come.The Plan’s underlying theme is that excellent science supports a range of activities, including public engagement, that enable us to understand and maintain healthy ecosystems.Those healthy ecosystems are the cornerstone of our social and economic well-being.The vision guiding the development of this Plan is that in 20 years’ time the status of Australian ecosystems and how they change will be widely reported and understood, and the prosperity and well-being they provide will be secure. To enable this, Australia’s national ecosystem science capability will be coordinated, collaborative and connected.The Plan is based on an extensive set of collaboratively generated proposals from national town hall meetings that also formthe basis for its implementation. Some directions within the Plan are for the Australian ecosystem science community itself to implement, others will involve the users of ecosystem science and the groups that fund ecosystem science.We identify six equal priority areas for action to achieve our vision: (i) delivering maximum impact for Australia: enhancing relationships between scientists and end-users; (ii) supporting long-termresearch; (iii) enabling ecosystem surveillance; (iv) making the most of data resources; (v) inspiring a generation: empowering the public with knowledge and opportunities; (vi) facilitating coordination, collaboration and leadership. This shared vision will enable us to consolidate our current successes, overcome remaining barriers and establish the foundations to ensure Australian ecosystem science delivers for the future needs of Australia..
Resumo:
Urban Design Master Plan for Government site adjacent to the State Tennis Centre and Yeerongpilly Station.
Resumo:
The Southern New England (SNE) Social and Community Plan is a guide to collaborative, integrated planning involving the three spheres of government, the community and commercial sectors. The Plan is based on social justice principles such as: • Equity - fairness in resource distribution, particularly for those most in need • Access - fairer access for everyone to the economic resources and services essential to meeting their basic needs and improving their quality of life • Rights - recognition and promotion of civil rights • Participation - better opportunities for genuine participation and consultation about decisions affecting people's lives. The Plan is also aimed at improving the accountability of decision-makers, and should help the councils, in conjunction with their communities meet the state government's social justice commitments. Preparation of a social and community plan is required at least every five years, and as with most councils, Armidale Dumaresq Council (ADC) has produced two already, one in 1999 and one in 2004, following the amalgamation of the former Armidale City and Dumaresq Shire Councils in 2000. Those Councils formerly prepared their own Plans in 1999, based on shared consultancy work on a community profile. This is the first joint Southern New England Plan, featuring Armidale Dumaresq, Walcha, Uralla and Guyra Councils. This Social Plan has aimed to identify and address the needs of the local community by: • describing who makes up the community • summarising key priority issues • assessing the effectiveness of any previous plans • recommending strategic ways for council and other government and non-government agencies to met community needs.
Resumo:
The Tamworth Regional Social Plan is a document for collaborative planning involving the three spheres of government, the community and commercial sectors, with the aim of enhancing the quality and fairness of life in Tamworth. The Plan is a way of identifying needs and priorities for community facilities and services for Tamworth. The Social Plan reflects Council’s ongoing commitment to the people of the Tamworth Region and, in particular, the social needs and aspirations of our community. The Local Government (General) Amendment (Community and Social Plans) Regulation 1998 grew out of the 1996 NSW Social Justice Directions Statement “Fair Go, Fair Share, Fair Say” which committed the Department of Local Government to ensuring government services are responsive to community needs and diversity. The regulation is designed to:- • Improve Councils’ ability to take account of community needs when formulating their management plans; • Assist Councils to provide or advocate for appropriate and accessible services/facilities; and • Increase the community’s ability to monitor Council efforts in addressing community needs over time. The Local Government (General) Regulation 1999 requires that all councils develop a community/social plan and that all plans be prepared in accordance with guidelines issued by the Department. While Council has a broad function of providing leadership for Tamworth, it is not the only group responsible for providing community services. Developing the Social Plan has required cooperation with various State and Federal agencies as well as with Tamworth’s community groups and agencies.
Resumo:
Many governments in western democracies conduct the work of leading their societies forward through policy generation and implementation. Despite government attempts at extensive negotiation, collaboration and debate, the general populace in these same countries frequently express feelings of disempowerment and undue pressure to be compliant, often leading to disengagement. Here we outline Plan B: a process for examining how policies that emerge from good intentions are frequently interpreted as burdensome or irrelevant by those on whom they have an impact. Using a case study of professional standards for teachers in Australia, we describe how we distilled Foucault’s notions of archaeology into a research approach centring on the creation of ‘polyhedrons of intelligibility’ as an alternative approach by which both policy makers and those affected by their policies may understand how their respective causes are supported and adversely affected.
Resumo:
Bushfire responsive design and management strategy at the bioregion scale. 248 Page document containing text, original designs, photographs, masterplans and critique - created as an alternative community-based strategy for risk mitigation and management reponse to bushfire in the Point Henry and Bremer Bay region of Western Australia. Document drafted as an alternative to a local government commissioned plan which had many shortcomings. It was presented as a 'powerpoint' presentaion at a public meeting in Bremer Bay on 7th April 2014 and disseminated to local community members and councillors to encourage public debate and feedback to the Shire of Jerramungup, WA.
Resumo:
Site analysis and landscape design developed for the Little Boat Harbour marine ecosystem and recreation area. Analysis conducted and design created by Dr Ian Weir QUT in collaboration with Mr Nathan McQuoid Landscape Ecologist and Mr Craig Lebens Bremer Bay Dive operater and marine ecologist (amateur). Includes A3 masterplan produced by Kylie Feher graduate architect in association with Dr Weir. Document presented to the 18 Dec 2013 Council meeting of the Shire of Jerramungup and subsequently adopted by that local government with implementation subject to funding.
Resumo:
The Augo Wetland Forest Park, along with other conservation areas around the world, provides an opportunity for a personal connection with the natural world - an opportunity for creating ways to convince people to reverse the degradation of the planet. In this presentation I use the settings approach, as used by the World Health Organisation in health promotion, as a framework. The WHO’s 1986 Ottawa Charter states that "Health is created and lived by people within the settings of their everyday life; where they learn, work, play, and love." I argue that, similarly, a conservation area provides a setting for people to connect with environmental issues and can be the place where positive behaviours and actions for the environment are created and enacted. In a wired and virtual world, such settings may be the only opportunity some people, especially children, get to connect with the environment. An evidence-based, intentionally designed and implemented environmental education program enhances the opportunities for the personal connection and subsequent action. Planning and implementing an Environmental education program for a conservation area requires an understanding of the principles of three domains: • Environmental Communication • Environmental Education • Environmental Interpretation In this presentation I define these domains and demonstrate how they become interdependent within the context of a particular setting such as a conservation area. I outline the principles of each domain and demonstrate how they can be enacted with reference to environmental education program case studies from settings in Australia and Borneo. The first case study is based around a proposal for a planned residential community at Eden’s Crossing, in Brisbane’s high growth Western corridor. The setting featured a number of important natural and heritage conservation characteristics and the developer wanted to be pro-active in informing the market what this development aims to achieve in terms of innovative community and environmental objectives. By designing an education and interpretation program in line with best practice education and interpretation principles the developers would be assisted in their efforts to build community, preserve heritage, and facilitate environmentally sensitive lifestyles for the future residents of Eden’s Crossing. Above all, the strategy focused on advancing sustainability in a way that made the Eden’s Crossing greenfield development significantly greener. It did this by interacting with prospective purchasers, and building knowledge about sustainability with a view to shaping the future community of Eden’s Crossing in terms of attitudes and behaviours. The second case study is based around the development of the Rainforest Interpretation Centre (RIC), now renamed the Rainforest Discovery Centre, an environmental education facility managed by the Sabah Forestry Department (SFD) and located at the edge of the Kabili-Sepilok Forest Reserve in the East Malaysian state of Sabah (Borneo). This setting is of paramount importance for biodiversity conservation and research and a vital habitat for orang utan. As an Environmental Education Consultant I was tasked with developing an environmental education program for this setting as part of the SFD’s long- term strategy towards sustainable forest management. By employing the principles of Environmental Education and Environmental Interpretation I designed and implemented a program with three major components: • an environmental education component for visiting primary and secondary school groups. • an environmental education component for in-service and pre-service teachers and teacher educators. • a public awareness and environmental interpretation component which caters for the general public and tourists. From these modest beginnings the program has expanded and new facilities have been developed to meet the demands of visitors, teachers and students. The effectiveness of the program can be traced back to the grounding in the principles of best practice environmental education, communication and interpretation.
Resumo:
Successful biodiversity conservation requires safeguarding viable populations of species. To work with this challenge Sweden has introduced a concept of Action Plans, which focus on the recovery of one or more species; while keeping in mind the philosophy of addressing ecosystems in a more comprehensive way, following the umbrella concept. In this paper we investigate the implementationprocess of the ActionPlanfor one umbrella species, the White-backed Woodpecker (WBW) Dendrocopos leucotos. We describe the plan's organisation and goals, and investigate its implementation and accomplishment of particular targets, based on interviewing and surveying the key actors. The achievement of the targets in 2005-2008 was on average much lower than planned, explained partially by the lack of knowledge/data, experienced workers, and administrative flexibility. Surprisingly, the perceived importance of particular conservation measures, the investment priority accorded to them, the money available and various practical obstacles all failed to kg? explain the target levels achieved. However qualitative data from both the interviews and the survey highlight possible implementation obstacles: competing interests with other conservation actions and the level of engagement of particular implementing actors. Therefore we suggest that for successful implementation of recovery plans, there is aneed for initial and inclusive scoping prior to embarking on the plan, where not only issues like ecological knowledge and practical resources are considered, but also possible conflicts and synergies with other conservation actions. An adaptive approach with regular review of the conservation process is essential, particularly in the case of such complex action plans as the one for the WBW.