996 resultados para Personal Rapid Transit (PRT)
Resumo:
In this paper, a mathematical programming model and a heuristically derived solution is described to assist with the efficient planning of services for a set of auxiliary bus lines (a bus-bridging system) during disruptions of metro and rapid transit lines. The model can be considered static and takes into account the average flows of passengers over a given period of time (i.e., the peak morning traffic hour) Auxiliary bus services must accommodate very high demand levels, and the model presented is able to take into account the operation of a bus-bridging system under congested conditions. A general analysis of the congestion in public transportation lines is presented, and the results are applied to the design of a bus-bridging system. A nonlinear integer mathematical programming model and a suitable approximation of this model are then formulated. This approximated model can be solved by a heuristic procedure that has been shown to be computationally viable. The output of the model is as follows: (a) the number of bus units to assign to each of the candidate lines of the bus-bridging system; (b) the routes to be followed by users passengers of each of the origin–destination pairs; (c) the operational conditions of the components of the bus-bridging system, including the passenger load of each of the line segments, the degree of saturation of the bus stops relative to their bus input flows, the bus service times at bus stops and the passenger waiting times at bus stops. The model is able to take into account bounds with regard to the maximum number of passengers waiting at bus stops and the space available at bus stops for the queueing of bus units. This paper demonstrates the applicability of the model with two realistic test cases: a railway corridor in Madrid and a metro line in Barcelona Planificación de los servicios de lineas auxiliares de autobuses durante las incidencias de las redes de metro y cercanías. El modelo estudia el problema bajo condiciones de alta demanda y condiciones de congestión. El modelo no lineal resultante es resuelto mediante heurísticas que demuestran su utilidad. Se demuestran los resultados en dos corredores de las ciudades de Barcelona y Madrid.
Resumo:
This article presents a new and computationally efficient method of analysis of a railway track modelled as a continuous beam of 2N spans supported by elastic vertical springs. The main feature of this method is its important reduction in computational effort with respect to standard matrix methods of structural analysis. In this article, the whole structure is considered to be a repetition of a single one. The analysis presented is applied to a simple railway track model, i.e. to a repetitive beam supported on vertical springs (sleepers). The proposed method of analysis is based on the general theory of spatially periodic structures. The main feature of this theory is the possibility to apply Discrete Fourier Transform (DFT) in order to reduce a large system of q(2N + 1) linear stiffness equilibrium equations to a set of 2N + 1 uncoupled systems of q equations each. In this way, a dramatic reduction of the computational effort of solving the large system of equations is achieved. This fact is particularly important in the analysis of railway track structures, in which N is a very large number (around several thousands), and q = 2, the vertical displacement and rotation, is very small. The proposed method allows us to easily obtain the exact solution given by Samartín [1], i.e. the continuous beam railway track response. The comparison between the proposed method and other methods of analysis of railway tracks, such as Lorente de Nó and Zimmermann-Timoshenko, clearly shows the accuracy of the obtained results for the proposed method, even for low values of N. In addition, identical results between the proposed and the Lorente methods have been found, although the proposed method seems to be of simpler application and computationally more efficient than the Lorente one. Small but significative differences occur between these two methods and the one developed by Zimmermann-Timoshenko. This article also presents a detailed sensitivity analysis of the vertical displacement of the sleepers. Although standard matrix methods of structural analysis can handle this railway model, one of the objectives of this article is to show the efficiency of DFT method with respect to standard matrix structural analysis. A comparative analysis between standard matrix structural analysis and the proposed method (DFT), in terms of computational time, input, output and also software programming, will be carried out. Finally, a URL link to a MatLab computer program list, based on the proposed method, is given
Resumo:
The ballast pick-up (or ballast train-induced-wind erosion (BTE)) phenomenon is a limiting factor for the maximum allowed operational train speed. The determination of the conditions for the initiation of the motion of the ballast stones due to the wind gust created by high-speed trains is critical to predict the start of ballast pick-up because, once the motion is initiated, a saltation-like chain reaction can take place. The aim of this paper is to present a model to evaluate the effect of a random aerodynamic impulse on stone motion initiation, and an experimental study performed to check the capability of the proposed model to classify trains by their effect on the ballast due to the flow generated by the trains. A measurement study has been performed at kp 69 + 500 on the Madrid – Barcelona High Speed Line. The obtained results show the feasibility of the proposed method, and contribute to a technique for BTE characterization, which can be relevant for the development of train interoperability standards
Resumo:
"DOT-I-83-23."
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Transportation Department, Washington, D.C.
Resumo:
Transportation Department, Washington, D.C.
Resumo:
Transportation Department, Washington, D.C.
Resumo:
Transportation Department, Washington, D.C.
Resumo:
With this is bound its Cost in operation, 13th-15th quarter, July 1, 1918-September 24, 1918. In the matter of the special report of the chief engineer of the Public service commission for the first district...of the cost of parts of the railroads placed in operation to and including the quarter...
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.