945 resultados para Parks--Ontario--Planning|vCase studies.


Relevância:

30.00% 30.00%

Publicador:

Resumo:

International theory and practice have promoted state-assisted upgrading of `informal` urban areas worldwide since the late 1970s, with various forms of monitoring and assessment of impact. Two independent studies of how residents perceive and evaluate such interventions have recently been undertaken for neighbouring parts of the upgraded area of Novos Alagados on the Itapagipe peninsula in the northwestern part of Salvador, Brazil`s third largest city. These studies start from different premises and have been implemented in very different ways, but both have the objective of permitting the `voice` of the residents to be heard concerning the upgrading process. Comparing them helps highlight the essential `fuzzy` nature of values concerning urban interventions of this nature and leaves us with thought-provoking questions concerning the role of local society in relation to the state in urban development, and the potential this has for on-going forms of urban management in cities which are emerging globally. Crown Copyright (C) 2009 Published by Elsevier Ltd. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper describes the development of an optimization model for the management and operation of a large-scale, multireservoir water supply distribution system with preemptive priorities. The model considers multiobjectives and hedging rules. During periods of drought, when water supply is insufficient to meet the planned demand, appropriate rationing factors are applied to reduce water supply. In this paper, a water distribution system is formulated as a network and solved by the GAMS modeling system for mathematical programming and optimization. A user-friendly interface is developed to facilitate the manipulation of data and to generate graphs and tables for decision makers. The optimization model and its interface form a decision support system (DSS), which can be used to configure a water distribution system to facilitate capacity expansion and reliability studies. Several examples are presented to demonstrate the utility and versatility of the developed DSS under different supply and demand scenarios, including applications to one of the largest water supply systems in the world, the Sao Paulo Metropolitan Area Water Supply Distribution System in Brazil.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Constructing highways in dense urban areas is always a challenge. In Sao Paulo Metropolitan Region, heavy truck traffic contributes to clog streets and expressways alike. As part of the traffic neither originates nor head to the region, a peripheral highway has been proposed to reduce traffic problems. This project called Rodoanel, is an expressway approximately 175 km long. The fact that the projected south and north sections would cross catchments that supply most of the metropolis water demand was strongly disputed and made the environmental permitting process particularly difficult. The agency in charge commissioned a strategic environmental assessment (SEA) of a revamped project, and called it the Rodoanel Programme. However, the SEA report failed to satisfactorily take account of significant strategic issues. Among these, the highway potential effect of inducing urban sprawl over water protection zones is the most critical issue, as it emerged later as a hurdle to project licensing. Conclusion is that, particularly where no agreed-upon framework for SEA exists, when vertical tiering with downstream project EIA is sought, then a careful scoping of strategic issues is more than necessary. If an agreement on `what is strategic` is not reached and not recognized by influential stakeholders, then the unsettled conflicts will be transferred to project EIA. In such a context, SEA will have added another loop to the usually long road to project approval. (c) 2008 Elsevier Inc. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Relevância:

30.00% 30.00%

Publicador:

Relevância:

30.00% 30.00%

Publicador:

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper examines an attempt to build capacity and empower local institutions in war-torn Jaffna,, on the northern tip of Sri Lanka. A participatory approach that is aimed at social empowerment is seen to be possible even under the most restrictive of political environments. However, whether or not the development intervention provides a foundation for longer-term improvement depends on the extent to which institutional capacity is built. Through an examination of the Jaffna Reconstruction Project, it is argued that if any of the ingredients of this institutional capacity are missing, not only will the 'islands of participation and empowerment' that are built by the development initiative be short-lived, but there may also be a negligible contribution to building a foundation for longer-term improvement in quality of life. (C) 2001 Elsevier Science Ltd. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Government policy change to self detennination over the past two decades has gradually given rise to various structures of Indigenous self government across Australia. Indigenous Local Government Authorities (LGAs) are the governing structure which receive the greatest devolution of State authority, especially those found in Queensland and the Northern Territory. Their statutory basis has developed over a relatively short period of time and is still very much evolving. This paper explores what opportunities exist for Indigenous LGAs to adopt statutory planning mechanisms.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Queensland Government is increasingly using participatory planning as a means to improve infrastructure and service delivery to Indigenous settlements. In addition to technical and economic goals, participatory planning practice seeks also to achieve social development goals, including empowerment, capacity building, community control and ownership. This article presents the findings of an evaluation of one such planning project, conducted at Old Mapoon in 1995. Despite various efforts to follow participatory processes, the plan had mixed success in achieving social development goals. This suggests some misunderstandings between the practice of participatory planning and the workings of local governance. It also presents some opportunities for participatory planning methods to be integrated with more inclusive forms of governance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper studies the use of results oriented performance information (outputs and outcomes) by local elected politicians (aldermen) in top managers’ performance evaluation. The main goal is to understand the top managers’ performance evaluation process conducted by Portuguese aldermen and to identify the dominant evaluation style. In line with Bogt (2001), an exploratory field research was developed in three large municipalities: Porto, Braga and Matosinhos. We intend to answer the following research questions: to what extent are local politicians (aldermen) 1 using results information (about outputs and outcomes) to evaluate top managers’ performance? Do aldermen give any importance to quantitative output information and report them on current planning and control documents? Will the output performance information be used on performance evaluation in a different way concerning policy field (task orientation)? Based on the Hopwood evaluation styles (adapted from the private to the public sector by Bogt, 2001), we have found that the performance evaluation process of top managers is more featured by the ‘operations-conscious styles’ (or ‘implicit style’). Portuguese aldermen recognize the importance to quantify outputs and outcomes, but these days they focus on the information about activities and the realized operations when they evaluate performance. We haven´t found significant differences between different tasks (some exceptions for culture and environment areas). However, the municipality of Matosinhos paid more attention on quantitative performance information. This finding is reinforced by the quality of quantitative data on outputs reported on its management report. Generally speaking, aldermen are aware that more attention should be paid to quantitative information about results and performance, taking into account recent reforms introduced in Portuguese municipalities (PLG) on this field, but the ‘implicit’ style is dominant.