978 resultados para Loviisa Nuclear Power Plant
Resumo:
Gamma radiations measurements were carried out in the vicinity of a coal-fired power plant located in the southwest coastline of Portugal. Two different gamma detectors were used to assess the environmental radiation within a circular area of 20 km centred in the coal plant: a scintillometer (SPP2 NF, Saphymo) and a high purity germanium detector (HPGe, Canberra). Fifty urban and suburban measurements locations were established within the defined area and two measurements campaigns were carried out. The results of the total gamma radiation ranged from 20.83 to 98.33 counts per second (c.p.s.) for both measurement campaigns and outdoor doses rates ranged from 77.65 to 366.51 Gy/h. Natural emitting nuclides from the U-238 and Th-232 decay series were identified as well as the natural emitting nuclide K-40. The radionuclide concentration from the uranium and thorium series determined by gamma spectrometry ranged from 0.93 to 73.68 Bq/kg, while for K-40 the concentration ranged from 84.14 to 904.38 Bq/kg. The obtained results were used primarily to define the variability in measured environmental radiation and to determine the coal plant’s influence in the measured radiation levels. The highest values were measured at two locations near the power plant and at locations between the distance of 6 and 20 km away from the stacks, mainly in the prevailing wind direction. The results showed an increase or at least an influence from the coal-fired plant operations, both qualitatively and quantitatively.
Resumo:
Dissertação para a obtenção do grau de mestre em Engenharia Electrotécnica Ramo de Energia
Resumo:
Proceedings of the 13th International UFZ-Deltares Conference on Sustainable Use and Management of Soil, Sediment and Water Resources - 9–12 June 2015 • Copenhagen, Denmark
Resumo:
Introduction Schistosomiasis is a parasitic disease of public health concern in Brazil, and the construction of hydroelectric dams, in addition to increasing permanent human settlement and tourism, has created conditions suitable for the establishment of mollusks that can transmit schistosomiasis. Such areas require a number of actions to prevent the establishment of schistosomiasis. This paper reports on a freshwater malacological survey carried out in the geographical area of the Manso Power Plant. Methods Mollusks were collected in 18 municipalities in the State of Mato Grosso between February 2002 and February 2004 (qualitative study) and from April 2009 to February 2011 (quantitative study). Results Thirty-one species of mollusks were collected, including newly recorded species (Antillorbis nordestensis and Burnupia ingae). In addition, the geographic distributions of known species, including Biomphalaria straminea, a snail vector of Schistosoma mansoni, were expanded. A total of 4,507 specimens were collected in the APM Manso reservoir (Usina Hidrelétrica de Aproveitamento Múltiplo de Manso) during the quantitative study, and Biomphalaria amazonica was found in six of the 10 localities analyzed. The Afroasiatic species Melanoides tuberculata, introduced after February 2009, was the dominant species (relative abundance 94.96%). Conclusions The study area is epidemiologically important due to the occurrence of B. straminea and B. amazonica, which are vectors of schistosomiasis, and M. tuberculata, a snail host of Centrocestus formosanus, which is responsible for centrocestiasis transmission. Observations of M. tuberculata and the exotic freshwater clams Corbicula fluminea and Corbicula largillierti raise concerns about biodiversity.
Resumo:
Based on the report for the unit “Métodos Interactivos de Participação e Decisão A” (Interactive methods of participation and decision A), coordinated by Prof. Lia Maldonado Teles de Vasconcelos and Prof. Nuno Miguel Ribeiro Videira Costa. This unit was provided for the PhD Program in Technology Assessment in 2015/2016.
Resumo:
The impact of a power plant cooling system in the Bahía Blanca estuary (Argentina) on the survival of target zooplanktonic organisms (copepods and crustacean larvae) and on overall mesozooplankton abundance was evaluated over time. Mortality rates were calculated for juveniles and adults of four key species in the estuary: Acartia tonsa Dana, 1849 and Eurytemora americana Williams, 1906 (native and invading copepods), and larvae of the crab Chasmagnathus granulata Dana, 1851 and the invading cirriped Balanus glandula Darwin, 1854. Mean total mortality values were up to four times higher at the water discharge site than at intake, though for all four species, significant differences were only registered in post-capture mortality. The findings show no evidence of greater larval sensitivity. As expected, the sharpest decrease in overall mesozooplankton abundance was found in areas close to heated water discharge.
Resumo:
The Great Tohoku-Kanto earthquake and resulting tsunami has brought considerable attention to the issue of the construction of new power plants. We argue in this paper, nuclear power is not a sustainable solution to energy problems. First, we explore the stock of uranium-235 and the different schemes developed by the nuclear power industry to exploit this resource. Second, we show that these methods, fast breeder and MOX fuel reactors, are not feasible. Third, we show that the argument that nuclear energy can be used to reduce CO2 emissions is false: the emissions from the increased water evaporation from nuclear power generation must be accounted for. In the case of Japan, water from nuclear power plants is drained into the surrounding sea, raising the water temperature which has an adverse affect on the immediate ecosystem, as well as increasing CO2 emissions from increased water evaporation from the sea. Next, a short exercise is used to show that nuclear power is not even needed to meet consumer demand in Japan. Such an exercise should be performed for any country considering the construction of additional nuclear power plants. Lastly, the paper is concluded with a discussion of the implications of our findings.
Resumo:
Other Audit Report - Utilities
Resumo:
ABSTRACT The removal of thick layers of soil under native scrubland (Cerrado) on the right bank of the Paraná River in Selvíria (State of Mato Grosso do Sul, Brazil) for construction of the Ilha Solteira Hydroelectric Power Plant caused environmental damage, affecting the revegetation process of the stripped soil. Over the years, various kinds of land use and management systems have been tried, and the aim of this study was to assess the effects of these attempts to restore the structural quality of the soil. The experiment was conducted considering five treatments and thirty replications. The following treatments were applied: stripped soil without anthropic intervention and total absence of plant cover; stripped soil treated with sewage sludge and planted to eucalyptus and grass a year ago; stripped soil developing natural secondary vegetation (capoeira) since 1969; pastureland since 1978, replacing the native vegetation; and soil under native vegetation (Cerrado). In the 0.00-0.20 m layer, the soil was chemically characterized for each experimental treatment. A 30-point sampling grid was used to assess soil porosity and bulk density, and to assess aggregate stability in terms of mean weight diameter (MWD) and geometric mean diameter (GMD). Aggregate stability was also determined using simulated rainfall. The results show that using sewage sludge incorporated with a rotary hoe improved the chemical fertility of the soil and produced more uniform soil pore size distribution. Leaving the land to develop secondary vegetation or turning it over to pastureland produced an intermediate level of structural soil quality, and these two treatments produced similar results. Stripped soil without anthropic intervention was of the lowest quality, with the lowest values for cation exchange capacity (CEC) and macroporosity, as well as the highest values of soil bulk density and percentage of aggregates with diameter size <0.50 mm, corroborated by its lower organic matter content. However, the percentage of larger aggregates was higher in the native vegetation treatment, which boosted MWD and GMD values. Therefore, assessment of some land use and management systems show that even decades after their implementation to mitigate the degenerative effects resulting from the installation of the Hydroelectric Plant, more efficient approaches are still required to recover the structural quality of the soil.
Resumo:
Examination report on the Villisca Municipal Power Plant in Villisca, Iowa for the period January 1, 2013 through December 31, 2013
Resumo:
Agreed-upon procedures report on the Villisca Municipal Power Plant for the period January 1, 2014 through December 31, 2014
Resumo:
BACKGROUND: Previous studies on childhood cancer and nuclear power plants (NPPs) produced conflicting results. We used a cohort approach to examine whether residence near NPPs was associated with leukaemia or any childhood cancer in Switzerland. METHODS: We computed person-years at risk for children aged 0-15 years born in Switzerland from 1985 to 2009, based on the Swiss censuses 1990 and 2000 and identified cancer cases from the Swiss Childhood Cancer Registry. We geo-coded place of residence at birth and calculated incidence rate ratios (IRRs) with 95% confidence intervals (CIs) comparing the risk of cancer in children born <5 km, 5-10 km and 10-15 km from the nearest NPP with children born >15 km away, using Poisson regression models. RESULTS: We included 2925 children diagnosed with cancer during 21 117 524 person-years of follow-up; 953 (32.6%) had leukaemia. Eight and 12 children diagnosed with leukaemia at ages 0-4 and 0-15 years, and 18 and 31 children diagnosed with any cancer were born <5 km from a NPP. Compared with children born >15 km away, the IRRs (95% CI) for leukaemia in 0-4 and 0-15 year olds were 1.20 (0.60-2.41) and 1.05 (0.60-1.86), respectively. For any cancer, corresponding IRRs were 0.97 (0.61-1.54) and 0.89 (0.63-1.27). There was no evidence of a dose-response relationship with distance (P > 0.30). Results were similar for residence at diagnosis and at birth, and when adjusted for potential confounders. Results from sensitivity analyses were consistent with main results. CONCLUSIONS: This nationwide cohort study found little evidence of an association between residence near NPPs and the risk of leukaemia or any childhood cancer.
Resumo:
Diplomityössä tutkittiin Loviisan voimalaitoksen primääri- ja sekundääripiirin aktiivisuusmittausten kykyä tunnistaa pienet primääri-sekundäärivuodot. Tarkasteltavat primääri-sekundäärivuotojen suuruudet valittiin laitoksen hätätilanne- ja häiriönselvitysohjeiden mukaisesti. Vuodon vaikutuksia arvioitiin erilaisilla primäärijäähdytteen ominaisaktiivisuuksilla. Ominaisaktiivisuudet primääripiirissä määritettiin nuklidikohtaisesti erilaisille polttoainevuototapauksille. Työssä huomioitiin myös transienteissa mahdollisesti esiintyvä primääripiirin aktiivisuustasoa nostava spiking-ilmiö. Vuodon tarkempaa tunnistamista varten työssä laskettiin tarkasteltaville mittareille kalibrointikertoimet. Primääri-sekundäärivuoto mallinnettiin APROS-simulointiohjelmalla laitoksen eri käyttötiloissa ja kahdella eri vuotokoolla. Varsinainen aktiivisuuslaskenta suoritettiin SEKUN-ohjelmalla. Työssä tätä aktiivisuus- ja päästölaskentaohjelmaa muokattiin ohjelmoimalla siihen tarkasteltavat aktiivisuusmittaukset sekä primääripiirin puhdistus ja ulospuhallus. Laskelmien tuloksena saatiin arviot kunkin tarkasteltavana olleen aktiivisuusmittauksen soveltuvuudesta primääri-sekundäärivuodon tunnistamiseen erilaisissa polttoainevuototapauksissa ja reaktorin eri tehotasoilla. Häiriönselvitysohje I3:n käyttöönottoa edellyttävät vuotokoot määritettiin aktiivisuusmittausten havaitseman perusteella. Erityisesti kuumavalmiustilassa tapauksissa, joissa reaktorisydämessä oletetaan olevan tiiveytensä menettäneitä polttoainesauvoja, spikingin vaikutus jäähdytteiden aktiivisuuspitoisuuksiin ja mittaustuloksiin oli merkittävä. Niiltä osin, kuin tulokset käsittelevät ohjeissa vuodon tunnistamiseen käytettyjä aktiivisuusrajoja, tulokset osoittivat aktiivisuusrajat oikeiksi. Kuumavalmiudessa aktiivisuusmittausten mittausalueet saattavat joissakin tapauksissa rajoittaa primääri-sekundäärivuodon tunnistamista.
Resumo:
Työn tarkoituksena on tarkastella Euroopan siirtymätalousalueelta kotimaisen biopoltto-ainevoimalaitoksen kilpailukykyä potentiaalisimmiksi markkinakohteiksi arvioitujen nykyisten Eu-valtioiden osalta. Työ tehdään osana kokoluokaltaan 3,5 MWth/1,0 MWe pienvoimalaitoksen tuotekehityshanketta, joka on käynnistynyt Varkaudessa tämän vuoden maaliskuussa. Potentiaalisimpien siirtymätalousmaiden valintakriteereinä on käytetty aiempia tutkimuksia ja raportteja. Huomio keskitetään kiinteän biopolttoaineen resursseihin ja biopolttoaineisiin pohjautuvalle energiantuotannolle asetettuihin tavoitteisiin. Edellä mainittujen kriteerien pohjalta tarkasteltaviksi valittujen valtioiden osalta tehtiin tarkemmat kilpailukykyanalyysit, otettiin yhteyttä markkina-alueeltaalan ammattilaisiin ja kartoitettiin potentiaalisimmat markkinakohteet. Tavoitteena on arvioida varteenotettavin kilpailija kiinteisiin biopolttoaineisiin pohjautuvalle sähkön ja lämmön yhteistuotannolle, jonka perusteella laaditaan mallivoimalaitoksen kilpailukykyisen hinnan määrittämiseksi tiettyyn takaisinmaksuaikaan ja korkotekijään perustuen. Lopulta tehdään maakohtaisesti yhteenveto merkittävimmistä markkinapotentiaaliin vaikuttavista kilpailutekijöistä, arvioidaan potentiaalisin kohdemaa sekä esitetään mahdollinen investoinnin rahoitusvaihtoehto ja keinoja markkinoida tuotetta potentiaalisille asiakkaille.