Recently, Branzei, Dimitrov, and Tijs (2003) introduced cooperative interval-valued games. Among other insights, the notion of an interval core has been coined and proposed as a solution concept for interval-valued games. In this paper we will present a general mathematical programming algorithm which can be applied to find an element in the interval core. As an example, we discuss lot sizing with uncertain demand to provide an application for interval-valued games and to demonstrate how interval core elements can be computed. Also, we reveal that pitfalls exist if interval core elements are computed in a straightforward manner by considering the interval borders separately.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

We present a new model formulation for a multi-product lot-sizing problem with product returns and remanufacturing subject to a capacity constraint. The given external demand of the products has to be satisfied by remanufactured or newly produced goods. The objective is to determine a feasible production plan, which minimizes production, holding, and setup costs. As the LP relaxation of a model formulation based on the well-known CLSP leads to very poor lower bounds, we propose a column-generation approach to determine tighter bounds. The lower bound obtained by column generation can be easily transferred into a feasible solution by a truncated branch-and-bound approach using CPLEX. The results of an extensive numerical study show the high solution quality of the proposed solution approach.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The lack of data records of electric power consumption of smallphotovoltaic home systems, independently of the method used for sizing them, drives to consider the demand as a constant. However, the existing data reveal the variability of the consumption due to the influences of some social, cultural and psychosocial aspects of the human groups. This paper presents records of consumption data obtainedfrom several solar home systems (SHSs) in Brazil and Peru, and it discusses about the Gamma distribution function that can express to a great extent the behaviour of the demand. By this analysis it was verified that `a lot of people consume little and few people consume a lot`. In that sense, a few recommendations for sizing procedures that can be useful in the implantation of extensive programmes of rural electrification by SHSs are presented. Copyright (c) 2007 John Wiley & Sons, Ltd.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

What role can climatically appropriate subdivision design play in decreasing the use of energy required to cool premises by maximising access to natural ventilation? How can this design be achieved? The subdivision design stage is critical to urban and suburban sustainability outcomes, as significant changes after development are constrained by the configuration of the subdivision, and then by the construction of the dwellings. Existing Australian lot rating methodologies for energy efficiency, such as that by the Sustainable Energy Development Authority (SEDA), focus on reducing heating needs by increasing solar access, a key need in Australia’s temperate zone. A recent CRC CI project, Sustainable Subdivisions: Energy (Miller and Ambrose 2005) examined these guidelines to see if they could be adapted for use in subtropical South East Queensland (SEQ). Correlating the lot ratings with dwelling ratings, the project found that the SEDA guidelines would need to be modified for use to make allowance for natural ventilation. In SEQ, solar access for heating is less important than access to natural ventilation, and there is a need to reduce energy used to cool dwellings. In Queensland, the incidence of residential air-conditioning was predicted to reach 50 per cent by the end of 2005 (Mickel 2004). The CRC-CI, Sustainable Subdivisions: Ventilation Project (CRC-CI, in progress), aims to verify and quantify the role natural ventilation has in cooling residences in subtropical climates and develop a lot rating methodology for SEQ. This paper reviews results from an industry workshop that explored the current attitudes and methodologies used by a range of professionals involved in subdivision design and development in SEQ. Analysis of the workshop reveals that a key challenge for sustainability is that land development in subtropical SEQ is commonly a separate process from house design and siting. Finally, the paper highlights some of the issues that regulators and industry face in adopting a lot rating methodology for subdivisions offering improved ventilation access, including continuing disagreement between professionals over the desirability of rating tools.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

To allocate and size capacitors in a distribution system, an optimization algorithm, called Discrete Particle Swarm Optimization (DPSO), is employed in this paper. The objective is to minimize the transmission line loss cost plus capacitors cost. During the optimization procedure, the bus voltage, the feeder current and the reactive power flowing back to the source side should be maintained within standard levels. To validate the proposed method, the semi-urban distribution system that is connected to bus 2 of the Roy Billinton Test System (RBTS) is used. This 37-bus distribution system has 22 loads being located in the secondary side of a distribution substation (33/11 kV). Reducing the transmission line loss in a standard system, in which the transmission line loss consists of only about 6.6 percent of total power, the capabilities of the proposed technique are seen to be validated.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper, the placement and sizing of Distributed Generators (DG) in distribution networks are determined optimally. The objective is to minimize the loss and to improve the reliability. The constraints are the bus voltage, feeder current and the reactive power flowing back to the source side. The placement and size of DGs are optimized using a combination of Discrete Particle Swarm Optimization (DPSO) and Genetic Algorithm (GA). This increases the diversity of the optimizing variables in DPSO not to be stuck in the local minima. To evaluate the proposed algorithm, the semi-urban 37-bus distribution system connected at bus 2 of the Roy Billinton Test System (RBTS), which is located at the secondary side of a 33/11 kV distribution substation, is used. The results finally illustrate the efficiency of the proposed method.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper, the optimal allocation and sizing of distributed generators (DGs) in a distribution system is studied. To achieve this goal, an optimization problem should be solved in which the main objective is to minimize the DGs cost and to maximise the reliability simultaneously. The active power balance between loads and DGs during the isolation time is used as a constraint. Another point considered in this process is the load shedding. It means that if the summation of DGs active power in a zone, isolated by the sectionalizers because of a fault, is less than the total active power of loads located in that zone, the program start shedding the loads in one-by-one using the priority rule still the active power balance is satisfied. This assumption decreases the reliability index, SAIDI, compared with the case loads in a zone are shed when total DGs power is less than the total load power. To validate the proposed method, a 17-bus distribution system is employed and the results are analysed.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Should the owner of a penthouse unit pay more in body corporate levies than the ground floor unit owner? A decision of the Queensland Court of Appeal (McPherson JA, Chesterman and Atkinson JJ) will be of great interest to those seeking to challenge contribution schedule lot entitlements imposed under the Body Corporate and Community Management Act 1997 (Qld) (‘the Act’). The decision is Fischer v Body Corporate for Centrepoint Community Title Scheme 7779 [2004] QCA 214.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Some uncertainties such as the stochastic input/output power of a plug-in electric vehicle due to its stochastic charging and discharging schedule, that of a wind unit and that of a photovoltaic generation source, volatile fuel prices and future uncertain load growth, all together could lead to some risks in determining the optimal siting and sizing of distributed generators (DGs) in distributed systems. Given this background, under the chance constrained programming (CCP) framework, a new method is presented to handle these uncertainties in the optimal sitting and sizing problem of DGs. First, a mathematical model of CCP is developed with the minimization of DGs investment cost, operational cost and maintenance cost as well as the network loss cost as the objective, security limitations as constraints, the sitting and sizing of DGs as optimization variables. Then, a Monte Carolo simulation embedded genetic algorithm approach is developed to solve the developed CCP model. Finally, the IEEE 37-node test feeder is employed to verify the feasibility and effectiveness of the developed model and method. This work is supported by an Australian Commonwealth Scientific and Industrial Research Organisation (CSIRO) Project on Intelligent Grids Under the Energy Transformed Flagship, and Project from Jiangxi Power Company.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An iterative based strategy is proposed for finding the optimal rating and location of fixed and switched capacitors in distribution networks. The substation Load Tap Changer tap is also set during this procedure. A Modified Discrete Particle Swarm Optimization is employed in the proposed strategy. The objective function is composed of the distribution line loss cost and the capacitors investment cost. The line loss is calculated using estimation of the load duration curve to multiple levels. The constraints are the bus voltage and the feeder current which should be maintained within their standard range. For validation of the proposed method, two case studies are tested. The first case study is the semi-urban 37-bus distribution system which is connected at bus 2 of the Roy Billinton Test System which is located in the secondary side of a 33/11 kV distribution substation. The second case is a 33 kV distribution network based on the modification of the 18-bus IEEE distribution system. The results are compared with prior publications to illustrate the accuracy of the proposed strategy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Deciding the appropriate population size and number of is- lands for distributed island-model genetic algorithms is often critical to the algorithm’s success. This paper outlines a method that automatically searches for good combinations of island population sizes and the number of islands. The method is based on a race between competing parameter sets, and collaborative seeding of new parameter sets. This method is applicable to any problem, and makes distributed genetic algorithms easier to use by reducing the number of user-set parameters. The experimental results show that the proposed method robustly and reliably finds population and islands settings that are comparable to those found with traditional trial-and-error approaches.