943 resultados para HIGHWAY SECTION
Resumo:
Aiming at the shortage of prevailing prediction methods about highway truck conveyance configuration in over-limit freight research that transferring the goods attributed to over-limit portion to another fully loaded truck of the same configuration and developing the truck traffic volume synchronously, a new way to get accumulated probability function of truck power tonnage in basal year by highway truck classified by wheel and axle type load mass spectrum investigation was presented. Logit models were used to forecast overall highway freight diversion and single cargo tonnage diversion when the weight rules and strict of enforcement intensity of overload were changed in scheme year. Assumption that the probability distribution of single truck loadage should be consistent with the probability distribution of single goods freighted, the model describes the truck conveyance configuration in the future under strict over-limit prohibition. The model was used and tested in Highway Over-limit Research Project in Anhui by World Bank.
Resumo:
The management of main material prices of provincial highway project quota has problems of lag and blindness. Framework of provincial highway project quota data MIS and main material price data warehouse were established based on WEB firstly. Then concrete processes of provincial highway project main material prices were brought forward based on BP neural network algorithmic. After that standard BP algorithmic, additional momentum modify BP network algorithmic, self-adaptive study speed improved BP network algorithmic were compared in predicting highway project main prices. The result indicated that it is feasible to predict highway main material prices using BP NN, and using self-adaptive study speed improved BP network algorithmic is the relatively best one.
Resumo:
The highway express freight transportation (HEFT) is a new transportation organization form separated from the common freight transportation with economic development and incessant adjustment of highway transportation structure in China. At present, the phenomenon of inadaptability still exists in the HEFT system of China, from foundation structure like highways, parking lots and stations to transportation equipments and transportation organizing. In order to develop the HEFT system more rationally and effectively, we should start with the structure of the system, conform the resources existing, and consummate the freight transport system. In due course, relevant policies and measures to supervise, lead and support are necessary and important. This paper analyzes the existing problems of HEFT system in our country, based on its characteristics, development situation and adaptability, and presents the policy and measures of promoting and leading the development of the HEFT system.
Resumo:
Some new types of mathematical model among four key techno - economic indexes of highway rapid passenger through transportation were established based on the principles of transportation economics. According to the research on the feasible solutions to the associated parameters which were then compared to the actual value, found some limitation in the existing transport organization method. In order to conquer that, two new types of transport organization method, namely CD (Collecting and Distributing) Method and Relay Method were brought forward. What’s more, a further research was down to estimate their characteristics, such as feasibilities, operation flows, applicability fields, etc. This analysis proves the two methods can offset the shortage of rapid passenger through transportation. To ensure highway rapid passenger transport develop harmoniously, a three-stage development targets was suggested to fuse different organization methods.
Resumo:
In 2004, with the increasing overloading restriction requirements of society in Anhui, a provincial comprehensive overloading transportation survey has been developed to take evaluations on overloading actuality and enforcement efficiency with the support of the World Bank. A total of six site surveys were conducted at Hefei, Fuyang, Luan, Wuhu, Huainan and Huangshan Areas with four main contents respectively: traffic volume, axle load, freight information and registration information. Via statistical analysis on the survey data, conclusions were gained that: vehicle overloading are very universal and serious problems at arterial highways in Anhui now. The traffic loads have far exceeded the designed endure capacity of highways and have caused prevalent premature pavement damage, especially for rigid pavement. The overloading trucks are unimpeded engaged in highway freight transportation actually due to the disordered overloading enforcement strategies and the deficient inspecting technologies.
Resumo:
This paper is aimed at investigating the effect of web openings on the plastic bending behaviour and section moment capacity of a new cold-formed steel beam known as LiteSteel beam (LSB) using numerical modelling. Different LSB sections with varying circular hole diameter and spacing were considered. A simplified but appropriate numerical modelling technique was developed for the modelling of monosymmetric sections such as LSBs subject to bending, and was used to simulate a series of section moment capacity tests of LSB flexural members with web openings. The buckling and ultimate strength behaviour was investigated in detail and the modeling technique was further improved through a comparison of numerical and experimental results. This paper describes the simplified finite element modeling technique used in this study that includes all the significant behavioural effects affecting the plastic bending behaviour and section moment capacity of LSB sections with web holes. Numerical and test results and associated findings are also presented.
Resumo:
The purpose of this article is to highlight the conflict in the policy objectives of subs 46(1) and subs 46(1AA) of the Trade Practices Act 1974 (Cth) (TPA). The policy objective of subs 46(1) is to promote competition and efficient markets for the benefit of consumers (consumer welfare standard). It does not prohibit corporations with substantial market power using cost savings arising from efficiencies such economies of scale or scope, to undercut small business competitors The policy objective of 46(1AA), on the other hand, is to protect small business operators from price discounting by their larger competitors.. Unlike subs 46(1), it does not contain a ‘taking advantage’ element. It is argued that subs 46(1AA) may harm consumer welfare by having a chilling effect on price competition if this would harm small business competitors.
Resumo:
Section 35 of the Insurance Contracts Act 1984 requires insurers offering insurance policies in six prescribed areas "to clearly inform" prospective insureds of any departure their policies may constitute from the standard covers established by the Act and its accompanying Regulations. This prescribed insurance contracts regime was designed to remedy comprehension problems generated by the length and complexity of insurance documents and to alleviate misunderstanding over the terms and conditions of individual policies. This article examines the rationale underpinning s 35 and the prescribed insurance contracts regime and looks at the operation of the legislation with particular reference to home contents insurance in Australia. It is argued that the means whereby disclosure of derogation from standard cover may be effected largely negates the thrust of the prescribed insurance contract reform. Recommendations to address these operational deficiencies are made.
Resumo:
Highway construction often requires a significant capital input; therefore it often causes serious financial implications for developers, owners and operators. The recent industry-wide focus on sustainability has added a new dimension to the evaluation of highway projects, particularly on the economical scale of ‘going green’. Comprehensive analysis of the whole-of-life highway development that responds to sustainability challenges is one of the primary concerns for stakeholders. Principles of engineering economics and life cycle costing have been used to determine the incremental capacity investments for highway projects. However, the consideration of costs and issues associated with sustainability is still very limited in current studies on highway projects. Previous studies have identified that highway project investments are primarily concerned with direct market costs that can be quantified through life cycle costing analysis (LCCA). But they tend to ignore costs that are difficult to calculate, as those related to environmental and social elements. On a more positive note, these studies proved that the inclusion of such costs is an essential part of the overall development investment and a primary concern for decision making by the stakeholders. This paper discusses a research attempt to identify and categorise sustainability cost elements for highway projects. Through questionnaire survey, a set of sustainability cost elements on highway projects has been proposed. These cost elements are incorporated into the extension of some of the existing Life Cycle Costing Analysis (LCCA) models in order to produce a holistic financial picture of the highway project. It is expected that a new LCCA model will be established to serve as a suitable tool for decision making for highway project stakeholders.
Resumo:
Public awareness and the nature of highway construction works demand that sustainability measures are first on the development agenda. However, in the current economic climate, individual volition and enthusiasm for such high capital investments do not present as strong cases for decision making as the financial pictures of pursuing sustainability. Some stakeholders consider sustainability to be extra work that costs additional money. Though, stakeholders realised its importance in infrastructure development. They are keen to identify the available alternatives and financial implications on a lifecycle basis. Highway infrastructure development is a complex rocess which requires expertise and tools to evaluate investment options, such as environmentally sustainable features for road and highway development. Life-cycle cost analysis (LCCA) is a valuable approach for investment decision making for construction works. However, LCCA applications in highway development are still limited. Current models, for example focus on economic issues alone and do not deal with sustainability factors, which are more difficult to quantify and encapsulate in estimation modules. This paper reports the research which identifies sustainability related factors in highway construction projects, in quantitative and qualitative forms of a multi-criteria analysis. These factors are then incorporated into past and proven LCCA models to produce a new long term decision support model. The research via questionnaire, model building, analytical hierarchy processes (AHP) and case studies have identified, evaluated and then processed highway sustainability related cost elements. These cost elements need to be verified by industry before being integrated for further development of the model. Then the Australian construction industry will have a practical tool to evaluate investment decisions which provide an optimum balance between financial viability and sustainability deliverables.