825 resultados para Enrico Fermi Atomic Power Plant.
Resumo:
With advances in the synthesis and design of chemical processes there is an increasing need for more complex mathematical models with which to screen the alternatives that constitute accurate and reliable process models. Despite the wide availability of sophisticated tools for simulation, optimization and synthesis of chemical processes, the user is frequently interested in using the ‘best available model’. However, in practice, these models are usually little more than a black box with a rigid input–output structure. In this paper we propose to tackle all these models using generalized disjunctive programming to capture the numerical characteristics of each model (in equation form, modular, noisy, etc.) and to deal with each of them according to their individual characteristics. The result is a hybrid modular–equation based approach that allows synthesizing complex processes using different models in a robust and reliable way. The capabilities of the proposed approach are discussed with a case study: the design of a utility system power plant that has been decomposed into its constitutive elements, each treated differently numerically. And finally, numerical results and conclusions are presented.
Resumo:
During Russian PM Dmitry Medvedev’s working visit to Minsk on 18 July, Russia and Belarus signed a general contract for the construction of a nuclear power plant in Belarus. The signature brought to an end the complex negotiations which had been underway since January 2009 involving the leadership in Minsk, the Russian government and Atomstroyexport, the Russian company that will be the main contractor of the investment. However, the power plant’s future ownership structure, management arrangements and terms and conditions of profit sharing remain unclear. The Belarusian leadership hopes that with the launch of the nuclear power plant, it will be able to reduce gas imports from Russia, gas being the main resource used in producing heat and electricity in Belarus. This should in turn reduce the costs of energy generation. In addition, Minsk expects that the new investment will allow it to export electricity surpluses to the European Union, including Poland. Agreements concerning the power plant have been concluded over the last year or so and, according to these, Russia has acquired partial control of the Belarusian electricity grid, especially with regard to the transmission of energy to foreign markets. Russia is also the sole creditor and contractor for the investment, and the sole future provider of nuclear fuel. Therefore, implementation of the project will exacerbate Minsk’s already significant dependence on Moscow in energy and political terms.
Resumo:
Mode of access: Internet.
Resumo:
"June 1979."
Resumo:
Issued March 1978.