926 resultados para Engineering Process


Relevância:

60.00% 60.00%

Publicador:

Resumo:

Part 13: Virtual Reality and Simulation

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The majority of the organizations store their historical business information in data warehouses which are queried to make strategic decisions by using online analytical processing (OLAP) tools. This information has to be correctly assured against unauthorized accesses, but nevertheless there are a great amount of legacy OLAP applications that have been developed without considering security aspects or these have been incorporated once the system was implemented. This work defines a reverse engineering process that allows us to obtain the conceptual model corresponding to a legacy OLAP application, and also analyses and represents the security aspects that could have established. This process has been aligned with a model-driven architecture for developing secure OLAP applications by defining the transformations needed to automatically apply it. Once the conceptual model has been extracted, it can be easily modified and improved with security, and automatically transformed to generate the new implementation.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Dissertação para obtenção do Grau de Doutor em Bioengenharia

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Over the last decade, human embryonic stem cells (hESCs) have garnered a lot of attention owing to their inherent self-renewal ability and pluripotency. These characteristics have opened opportunities for potential stem cell-based regenerative medicines, for development of drug discovery platforms and as unique in vitro models for the study of early human development.(...)

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Vaatimusmäärittelyn tavoitteena on luoda halutun järjestelmän kokonaisen, yhtenäisen vaatimusluettelon vaatimusten määrittämiseksi käsitteellisellä tasolla. Liiketoimintaprosessien mallintaminen on varsin hyödyllinen vaatimusmäärittelyn varhaisissa vaiheissa. Tämä työ tutkii liiketoimintaprosessien mallintamista tietojärjestelmien kehittämistä varten. Nykyään on olemassa erilaisia liiketoimintaprosessien mallintamiseen tarkoitettuja tekniikoita. Tämä työ tarkastaa liiketoimintaprosessien mallintamisen periaatteet ja näkökohdat sekä eri mallinnustekniikoita. Uusi menetelmä, joka on suunniteltu erityisesti pienille ja keskisuurille ohjelmistoprojekteille, on kehitetty prosessinäkökohtien ja UML-kaavioiden perusteella.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

TRIZ is one of the well-known tools, based on analytical methods for creative problem solving. This thesis suggests adapted version of contradiction matrix, a powerful tool of TRIZ and few principles based on concept of original TRIZ. It is believed that the proposed version would aid in problem solving, especially those encountered in chemical process industries with unit operations. In addition, this thesis would help fresh process engineers to recognize importance of various available methods for creative problem solving and learn TRIZ method of creative problem solving. This thesis work mainly provides idea on how to modify TRIZ based method according to ones requirements to fit in particular niche area and solve problems efficiently in creative way. Here in this case, the contradiction matrix developed is based on review of common problems encountered in chemical process industry, particularly in unit operations and resolutions are based on approaches used in past to handle those issues.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This doctoral thesis describes the development work performed on the leachand purification sections in the electrolytic zinc plant in Kokkola to increase the efficiency in these two stages, and thus the competitiveness of the plant. Since metallic zinc is a typical bulk product, the improvement of the competitiveness of a plant was mostly an issue of decreasing unit costs. The problems in the leaching were low recovery of valuable metals from raw materials, and that the available technology offered complicated and expensive processes to overcome this problem. In the purification, the main problem was consumption of zinc powder - up to four to six times the stoichiometric demand. This reduced the capacity of the plant as this zinc is re-circulated through the electrolysis, which is the absolute bottleneck in a zinc plant. Low selectivity gave low-grade and low-value precipitates for further processing to metallic copper, cadmium, cobalt and nickel. Knowledge of the underlying chemistry was poor and process interruptions causing losses of zinc production were frequent. Studies on leaching comprised the kinetics of ferrite leaching and jarosite precipitation, as well as the stability of jarosite in acidic plant solutions. A breakthrough came with the finding that jarosite could precipitate under conditions where ferrite would leach satisfactorily. Based on this discovery, a one-step process for the treatment of ferrite was developed. In the plant, the new process almost doubled the recovery of zinc from ferrite in the same equipment as the two-step jarosite process was operated in at that time. In a later expansion of the plant, investment savings were substantial compared to other technologies available. In the solution purification, the key finding was that Co, Ni, and Cu formed specific arsenides in the “hot arsenic zinc dust” step. This was utilized for the development of a three-step purification stage based on fluidized bed technology in all three steps, i.e. removal of Cu, Co and Cd. Both precipitation rates and selectivity increased, which strongly decreased the zinc powder consumption through a substantially suppressed hydrogen gas evolution. Better selectivity improved the value of the precipitates: cadmium, which caused environmental problems in the copper smelter, was reduced from 1-3% reported normally down to 0.05 %, and a cobalt cake with 15 % Co was easily produced in laboratory experiments in the cobalt removal. The zinc powder consumption in the plant for a solution containing Cu, Co, Ni and Cd (1000, 25, 30 and 350 mg/l, respectively), was around 1.8 g/l; i.e. only 1.4 times the stoichiometric demand – or, about 60% saving in powder consumption. Two processes for direct leaching of the concentrate under atmospheric conditions were developed, one of which was implemented in the Kokkola zinc plant. Compared to the existing pressure leach technology, savings were obtained mostly in investment. The scientific basis for the most important processes and process improvements is given in the doctoral thesis. This includes mathematical modeling and thermodynamic evaluation of experimental results and hypotheses developed. Five of the processes developed in this research and development program were implemented in the plant and are still operated. Even though these processes were developed with the focus on the plant in Kokkola, they can also be implemented at low cost in most of the zinc plants globally, and have thus a great significance in the development of the electrolytic zinc process in general.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Tämän Pro Gradu-tutkielman tavoite on tutkia Business Process Re-engineering menetelmiä myyntiprosessien tehostamisessa. Tutkimuksen teoreettinen viiteke-hys rakentuu myynninjohtamisen, myyntiprosessien ja Business Process Mana-gementin ja Business Process Re-enineeringin ympärille. IT-järjestelmät ovat myös oleellinen osa-alue tutkimuksen kannalta ja niiden osuutta kuvataan niin myyntiprosesseissa kuin Business Process Re-engineering -menetelmien yhtey-dessä. Tutkielmassa perehdytään aikaisempaan tutkimusmateriaaliin ja akateemiseen kirjallisuuteen yllämainituilla osa-alueilla. Tavoitteena on löytää aikaisempia tutki-muksia myyntiprosessien tehostamisesta ja BPR:n roolista näissä tapauksissa. Myös myynninjohtamisen vaikutusta tehokkaaseen myyntiprosessiin tutkitaan, kuten myös IT-järjestelmien erilaisia rooleja tehokkaissa myyntiprosesseissa. Tutkielman empiirinen osio on kvalitatiivinen Case-tutkimus eräässä rahoitusalan yrityksessä. Tutkimus tehdään haastattelemalla myyntihenkilöstöä ja esimiehiä. Lisäksi analysoidaan yrityksen myyntiprosessiin liittyvää muuta materiaalia. Case-tutkimuksen tuloksia peilataan aiempaan akateemiseen tutkimukseen ja tuloksista pyritään löytämään ratkaisuja, miten BPR -menetelmillä voidaan tehostaa yrityksen myyntiprosessia.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The present invention describes a method for transforming chemolithotrophic acidophilic bacteria using electroporation technology. The proposed method allows transforming a bacterial line using a transformation vector, the pAF vector, which contains an origin of vegetative replication that allows the vector to replicate inside the bacteria without altering the natural physiological functions of the latter. Also disclosed is the use of the bacteria modified according to the invention in bioleaching processes of sulphated copper, gold, uranium, nickel, zinc and cobalt ore, inter alia.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Software Product Line Engineering (SPLE) is becoming widely used due to the improvement it means when developing software products of the same family. However, SPLE demands long-term investment on a product-line platform that might not be profitable due to rapid changing business settings. Since Agile Software Development (ASD) approaches are being successfully applied in volatile markets, several companies have suggested the idea of integrating SPLE and ASD when a family product has to be developed. Agile Product Line Engineering (APLE) advocates the integration of SPLE and ASD to address their lacks when they are individually applied to software development. A previous literature re-view of experiences and practices on APLE revealed important challenges about how to fully put APLE into practice. Our contribution address several of these challenges by tailoring the agile method Scrum by means of three concepts that we have defined: plastic partial components, working PL-architectures, and reactive reuse.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Nowadays, computer simulators are becoming basic tools for education and training in many engineering fields. In the nuclear industry, the role of simulation for training of operators of nuclear power plants is also recognized of the utmost relevance. As an example, the International Atomic Energy Agency sponsors the development of nuclear reactor simulators for education, and arranges the supply of such simulation programs. Aware of this, in 2008 Gas Natural Fenosa, a Spanish gas and electric utility that owns and operate nuclear power plants and promotes university education in the nuclear technology field, provided the Department of Nuclear Engineering of Universidad Politécnica de Madrid with the Interactive Graphic Simulator (IGS) of “José Cabrera” (Zorita) nuclear power plant, an industrial facility whose commercial operation ceased definitively in April 2006. It is a state-of-the-art full-scope real-time simulator that was used for training and qualification of the operators of the plant control room, as well as to understand and analyses the plant dynamics, and to develop, qualify and validate its emergency operating procedures.