957 resultados para Dam


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The River Bush must reach a standard of good ecological potential (GEP) by 2015 due to the requirements of the water framework directive. The role of sediments within a water body is extremely important to all aspects of a river's regime. The aim of this research is to investigate the effects of Altnahinch Dam on sediment distribution in the River Bush (a heavily modified water body) with comparison made against the Glendun River (an unmodified water body). Samples collected from the rivers were analysed by physical (pebble count, sieve analysis) and statistical methods (ANOVA, GRADISTAT). An increase in fine sediments upstream of the dam provides evidence that the dam is impacting sediment distribution. Downstream effects are not shown to be significant. The output of this study also implies similar impacts at other drinking water storage impoundments. This research recommends that a sediment management plan be put in place for Altnahinch Dam and that further studies be carried-out concentrating on fine sediment distribution upstream of the dam

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The coast of the Bulgarian Black Sea is a popular summer holiday destination. The Dam of Iskar is the largest artificial dam in Bulgaria, with a capacity of 675 million m3. It is the main source of tap water for the capital Sofia and for irrigating the surrounding valley. There is a close relationship between the quality of aquatic ecosystems and human health as many infections are waterborne. Rapid molecular methods for the analysis of highly pathogenic bacteria have been developed for monitoring quality. Mycobacterial species can be isolated from waste, surface, recreational, ground and tap waters and human pathogenicity of nontuberculose mycobacteria (NTM) is well recognized. The objective of our study was to perform molecular analysis for key-pathogens, with a focus on mycobacteria, in water samples collected from the Black Sea and the Dam of Iskar. In a two year period, 38 water samples were collected-24 from the Dam of Iskar and 14 from the Black Sea coastal zone. Fifty liter water samples were concentrated by ultrafiltration. Molecular analysis for 15 pathogens, including all species of genus Mycobacterium was performed. Our results showed presence of Vibrio spp. in the Black Sea. Rotavirus A was also identified in four samples from the Dam of Iskar. Toxigenic Escherichia coli was present in both locations, based on markers for stx1 and stx2 genes. No detectable amounts of Cryptosporidium were detected in either location using immunomagnetic separation and fluorescence microscopy. Furthermore, mass spectrometry analyses did not detect key cyanobacterial toxins. On the basis of the results obtained we can conclude that for the period 2012-2014 no Mycobacterium species were present in the water samples. During the study period no cases of waterborne infections were reported.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A Ilha de Santiago, situada no Arquipélago de Cabo Verde, é dominada por um clima seco e árido, interrompido por curtos períodos de chuvas torrenciais, com grande capacidade de transporte de sedimentos ao longo de vales profundos e encaixados, tributários da Ribeira Seca, onde se situa a Barragem do Poilão, construída em 2006. Os resultados de um levantamento batimétrico da albufeira da barragem realizado em Março de 2013, apontam para uma taxa de sedimentação anual próxima de 90 000 m3 /ano, fazendo com que, em apenas 7, anos a capacidade de armazenamento da albufeira tenha diminuído quase para metade. Os valores determinados neste estudo recomendam a tomada de medidas urgentes por parte do governo de Cabo Verde, no sentido da dragagem e desassoreamento da albufeira do Poilão.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação de mest., Gestão da Água e da Costa, Faculdade de Ciências e Tecnologia, Universidade do Algarve, 2009

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Ecohydrology is a scientific concept applied to problem- solving in environmental issues. It recognises that the present practice of relying nearly exclusively on engineering fixes to solve environmental problems is failing to restore the aquatic environment to a level that can sustain the quality of life that people are demanding. Ecohydrology is based on the ability of science to quantify and explain the relationships between hy- drological processes and biotic dynamics at a catchment scale and to manipulate these processes to increase the robustness of the aquatic system and thus its ability to cope with human- induced stresses. The concept was developed by the UNESCO International Hydrologic Programme (IHP) and the Man and Biosphere Programme (MAB).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Proceedings of the Institution of Civil Engineers - Water Management 163 Issue WM6

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Survey map of the land for the Mill Scibes Grand River Dam. Created by The Welland Canal Company. Included is a drawing of the land. Noteable features include; Sulphur Creek, post, bridge, Grand River, lot divisions, inside face of embankment. Surveyor notes are seen in pencil on the map.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A photograph with the caption, "LaChasse dam looking from river to Lake LaChasse".

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A photograph of the construction of the dam at Lake LaChasse.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Cross sections of Lyons Creek from Cooks Mills Dam to culvert (9 pages of charts, graphs and text, handwritten). This is signed by Fred Holmes, May 1857.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This presentation was the product of an invitation to speak at a symposium for students and faculty from a variety of different non-law departments at the University of Tennessee, where in 1973 I had started what became a six-year legal campaign to divert the Tennessee Valley Authority from impounding the last flowing 33 miles of the Little Tennessee River behind TVA’s Tellico Dam.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis Entitled Post-Environmental Evaluation of The Rajjaprabha Dam In Thailand. This post evaluation of environmental consequences of Rajjaprabha dam IS conducted ten years after its commencement. The Rajjaprabha dam project was planned and implemented as a multipurpose project, mainly for hydropower production, flood protection, fisheries, recreation and irrigation. The project includes the dam and reservoir with a 240 MW hydropower plant located about 90 km upstream from Surat Thani province, and irrigation systems covering the coastal plain in Surat Thani. The upstream storage reservoir (with about 5,639 mcm storage) and the hydropower plant had already been implemented. The first phase of irrigation system covers an area of 23,100 hectares. The second phase is envisaged to cover about 50,000 hectares. This study was conducted with the following objectives: (I) to assess all existing environmental resources and their values with the help of input-output analysis (2) to findout the beneficial impacts of the project (3) to evaluate the actual positive effects vis-a-vis the estimated effects before the project was implemented and (4) to identify all significant changes in relatives to the impacts previously assessed. The study area includes the Phum Duang river basin of about 4,668 km2 (placed on the areas that are upstream and downstream to the damsite), The duration of study is limited to 10 years after the dam has become operational i.e. from 1987-1997. The results of the study reveal that there is no significant changes in climatic and ground water resources, with respect to the study area inspte of the fact that the physical and chemical properties of the soil have slightly changed. Sedimentation in the reservoir does not have much effect on the function of the dam.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In dam inspection tasks, an underwater robot has to grab images while surveying the wall meanwhile maintaining a certain distance and relative orientation. This paper proposes the use of an MSIS (mechanically scanned imaging sonar) for relative positioning of a robot with respect to the wall. An imaging sonar gathers polar image scans from which depth images (range & bearing) are generated. Depth scans are first processed to extract a line corresponding to the wall (with the Hough transform), which is then tracked by means of an EKF (Extended Kalman Filter) using a static motion model and an implicit measurement equation associating the sensed points to the candidate line. The line estimate is referenced to the robot fixed frame and represented in polar coordinates (rho&thetas) which directly corresponds to the actual distance and relative orientation of the robot with respect to the wall. The proposed system has been tested in simulation as well as in water tank conditions

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents a complete control architecture that has been designed to fulfill predefined missions with an autonomous underwater vehicle (AUV). The control architecture has three levels of control: mission level, task level and vehicle level. The novelty of the work resides in the mission level, which is built with a Petri network that defines the sequence of tasks that are executed depending on the unpredictable situations that may occur. The task control system is composed of a set of active behaviours and a coordinator that selects the most appropriate vehicle action at each moment. The paper focuses on the design of the mission controller and its interaction with the task controller. Simulations, inspired on an industrial underwater inspection of a dam grate, show the effectiveness of the control architecture

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Descripció i anàlisi del sistema de funcionament de justícia juvenil en medi obert, i concretament la metodologia de treball dels DAM, per tal d’evidenciar les competències requerides a l’hora de desenvolupar l’exercici professional d’educador social com a DAM, tot exposant una anàlisi de la formació acadèmica impartida al llarg de la diplomatura d’Educació Social en relació a aquests requeriments