328 resultados para Consultant


Relevância:

10.00% 10.00%

Publicador:

Resumo:

In 1993 the Australian Broadcasting Corporation was contracted by the Australian Government to assist in the reshaping of the South African Broadcasting Corporation from a state-run broadcaster to a respected and trusted national broadcaster for all people in the newly democratic South Africa. Broadcast journalism training was identified by ABC consultant Bob Wurth as possibly the greatest need for SABC Radio. This thesis examines the ABC's role in South Africa and the effectiveness of its radio journalism training project considering the organisational, structural, cultural and political constraints of the SABC. This thesis will show through interviews and participant observation the difficulties in achieving the production of Western Liberal journalism values at the SABC within the time constraints set by the project funded by the Australian Government and the particular South African morays.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

It is recognized that, in general, the performance of construction projects does not meet optimal expectations. One aspect of this is the performance of each participant, which is interdependent and makes a significance impact on overall project outcomes. Of these, the client is traditionally the owner of the project, the architect or engineer is engaged as the lead designer and a contractor is selected to construct the facilities. Generally, the performance of the participants is gauged by considering three main factors, namely time, cost and quality. As the level of satisfaction is a subjective measurement, it is rarely used in the performance evaluation of construction work. Recently, various approaches to the measurement of satisfaction have been made in attempting to determine the performance of construction project outcomes – for instance client satisfaction, consultant satisfaction, contractor satisfaction, customer satisfaction and home buyer satisfaction. These not only identify the performance of the construction project, but are also used to improve and maintain relationships. In addition, these assessments are necessary for continuous improvement and enhanced cooperation between participants. The measurement of satisfaction levels primarily involves expectations and perceptions. An expectation can be regarded as a comparison standard of different needs, motives and beliefs, while a perception is a subjective interpretation that is influenced by moods, experiences and values. This suggests that the disparity between perceptions and expectations may be used to represent different levels of satisfaction. However, this concept is rather new and in need of further investigation. This paper examines the current methods commonly practiced in measuring satisfaction level and the advantages of promoting these methods. The results provided are a preliminary review of the advantages of satisfaction measurement in the construction industry and recommendations are made concerning the most appropriate methods for use in identifying the performance of project outcomes.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The role of the occupational health nurse is broad and includes health care provider, manager/coordinator, educator/advisor, and case manager and consultant, depending on the type of industry and the country in which the nurse practices. Regardless of the type of role, the occupational health nurse must participate in continuing nursing education (CNE) activities. This study describes the roles, credentials, and number of CNE activities undertaken by occupational health nurses working in Ontario, Canada. Using a non-experimental descriptive design, a questionnaire was mailed to all practicing occupational health nurses who are members (n = 900) of a local nursing association. Three hundred fifty-four questionnaires were returned. Nurses reported a variety of roles in the following categories: case management, health promotion, policy development, infection control/travel health, ergonomics, education, research, health and safety, direct care, consultation, disaster preparedness, and industrial hygiene. Sixty-five percent of nurses held an occupational health nurse credential, and 19% of nurses attended more than 100 hours of CNE annually. Occupational health nurses have multiple workplace roles. Many attend CNE activities and they often prepare for credentialing.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This two-storey office building and upper floor interior fit-out, completed for the 25th anniversary of Adelaide-based construction firm, Badge Constructions, is a signature building for the client, and its recently established Brisbane-based operations, and a showpiece for their commercial and industrial construction prowess and dynamic, collaborative and transparent work ethic. Situated in the industrial precinct of Bulimba’s Oxford Street, the building is a continuation of the street’s nearby commercial heart, whilst its architectural language references the adjacent industrial structures. The building’s shed-like skillion roof and western wall have been considered as a folded plane, allowing space to be considered as the inhabitation of the inner surface of this plane. The analogy of a lined garment, tailored to suit its wearer, clarifies the relationship between the western façade plane’s unadorned, monochromatic outer surface and the coloured and patterned inner surface, celebrating inhabitation. The use of typically external construction materials are re-positioned as an integral part of the building’s interior fit-out, alluding to Badge’s construction repertoire, and weakening traditional barriers between interior and exterior commercial space. In reference to its Queensland context, the external glazed line of the building is pulled back from the street, providing an eastern verandah edge and a northern court, as a part of the public realm. The upper floor office incorporates a cantilevered outdoor mezzanine within the northern court, whilst the adjacent reception area and stairwell utilises clear glazing in order to visually connect to the street. The building is designed to take advantage of natural light to the east, whilst shading habitable spaces from the north, a building strategy that reduces solar heat gain and energy consumption. Placement of the building’s amenities core to the west provides substantial bracing and allows maximum activation of the north and east street edge. A collaborative design process has resulted in an affordable commercial building with a high level of design resolution and relationship to its Brisbane context, while also challenging the traditional relationships between exterior and interior commercial space, and informed client and consultant team of allied disciplines.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The design-build system has been demonstrated as an effective delivery method and gained popularity worldwide. Although there are an increasing number of clients adopting DB method in China, most of them remain inexperienced with method. The objective of this study is therefore to identify the key competences that a client or its consultant should possess to ensure the success of DB projects. Face-to-face interviews and a two-round Delphi questionnaire survey were conducted to find the following six key competences of clients, which include the (1) ability to clearly articulate project scope and objectives; (2) financial capacity for DB projects; (3) capability in contract management; (4) adequate staff or consulting team; (5) effective coordination with contractors and (6) experience with similar DB projects. This study will hopefully provide clients with measures to evaluate their DB competence and further promote their understanding of DB system in the PRC.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Performance based planning is a form of planning regulation that is not well understood and the theoretical advantages of this type of planning are rarely achieved in practice. Normatively, this type of regulation relies on performance standards that are quantifiable and technically based which are designed to manage the effects of development, where performance standards provide certainty in respect of the level of performance and the means of achievement is flexible. Few empirical studies have attempted to examine how performance based planning has been conceptualised and implemented in practice. Existing literature is predominately anecdotal and consultant based (Baker et al. 2006) and has not sought to quantitatively examine how land use has been managed or determine how context influences implementation. The Integrated Planning Act 1997 (IPA) operated as Queensland’s principal planning legislation between March 1998 and December 2009. The IPA prevented Local Governments from prohibiting development or use and the term zone was absent from the legislation. While the IPA did not use the term performance based planning, the system is widely considered to be performance based in practice (e.g. Baker et al. 2006; Steele 2009a, 2009b). However, the degree to which the IPA and the planning system in Queensland is performance based is debated (e.g. Yearbury 1998; England 2004). Four research questions guided the research framework using Queensland as the case study. The questions sought to: determine if there is a common understanding of performance based planning; identify how performance based planning was expressed under the IPA; understand how performance based planning was implemented in plans; and explore the experiences of participants in the planning system. The research developed a performance adoption spectrum. The spectrum describes how performance based planning is implemented, ranging between pure and hybrid interpretations. An ex-post evaluation of seventeen IPA plans sought to determine plan performativity within the conceptual spectrum. Land use was examined from the procedural dimension of performance (Assessment Tables) and the substantive dimension of performance (Codes). A documentary analysis and forty one interviews supplemented the research. The analytical framework considered how context influenced performance based planning, including whether: the location of the local government affected land use management techniques; temporal variation in implementation exists; plan-making guidelines affected implementation; different perceptions of the concept exist; this type of planning applies to a range of spatial scales. Outcomes were viewed as the medium for determining the acceptability of development in Queensland, a significant departure from pure approaches found in the United States. Interviews highlighted the absence of plan-making direction in the IPA, which contributed to the confusion about the intended direction of the planning system and the myth that the IPA would guarantee a performance based system. A hybridised form of performance based planning evolved in Queensland which was dependent on prescriptive land use zones and specification of land use type, with some local governments going to extreme lengths to discourage certain activities in a predetermined manner. Context had varying degrees of influence on plan-making methods. Decision-making was found to be inconsistent and the system created a range of unforeseen consequences including difficulties associated with land valuation, increased development speculation, and the role of planners in court was found to be less critical than in the previous planning system.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Over the last few decades, construction project performance has been evaluated due to the increase of delays, cost overruns and quality failures. Growing numbers of disputes, inharmonious working environments, conflict, blame cultures, and mismatches of objectives among project teams have been found to be contributory factors to poor project performance. Performance measurement (PM) approaches have been developed to overcome these issues, however, the comprehensiveness of PM as an overall approach is still criticised in terms of the iron triangle; namely time, cost, and quality. PM has primarily focused on objective measures, however, continuous improvement requires the inclusion of subjective measures, particularly contractor satisfaction (Co-S). It is challenging to deal with the two different groups of large and small-medium contractor satisfaction as to date, Co-S has not been extensively defined, primarily in developing countries such as Malaysia. Therefore, a Co-S model is developed in this research which aims to fulfil the current needs in the construction industry by integrating performance measures to address large and small-medium contractor perceptions. The positivist paradigm used in the research was adhered to by reviewing relevant literature and evaluating expert discussions on the research topic. It yielded a basis for the contractor satisfaction model (CoSMo) development which consists of three elements: contractor satisfaction (Co-S) dimensions; contributory factors and characteristics (project and participant). Using valid questionnaire results from 136 contractors in Malaysia lead to the prediction of several key factors of contractor satisfaction and to an examination of the relationships between elements. The relationships were examined through a series of sequential statistical analyses, namely correlation, one-way analysis of variance (ANOVA), t-tests and multiple regression analysis (MRA). Forward and backward MRAs were used to develop Co-S mathematical models. Sixteen Co-S models were developed for both large and small-medium contractors. These determined that the large contractor Malaysian Co-S was most affected by the conciseness of project scope and quality of the project brief. Contrastingly, Co-S for small-medium contractors was strongly affected by the efficiency of risk control in a project. The results of the research provide empirical evidence in support of the notion that appropriate communication systems in projects negatively contributes to large Co-S with respect to cost and profitability. The uniqueness of several Co-S predictors was also identified through a series of analyses on small-medium contractors. These contractors appear to be less satisfied than large contractors when participants lack effectiveness in timely authoritative decision-making and communication between project team members. Interestingly, the empirical results show that effective project health and safety measures are influencing factors in satisfying both large and small-medium contractors. The perspectives of large and small-medium contractors in respect to the performance of the entire project development were derived from the Co-S models. These were statistically validated and refined before a new Co-S model was developed. Developing such a unique model has the potential to increase project value and benefit all project participants. It is important to improve participant collaboration as it leads to better project performance. This study may encourage key project participants; such as client, consultant, subcontractor and supplier; to increase their attention to contractor needs in the development of a project. Recommendations for future research include investigating other participants‟ perspectives on CoSMo and the impact of the implementation of CoSMo in a project, since this study is focused purely on the contractor perspective.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Research background: The general public is predominantly unaware of the complexities and skills involved in the fashion supply chain (design, manufacture and retail) of couture/bespoke garments. As cited in McMahon and Morley (2011) “While a high price tag is widely accepted as a necessary element of luxury products (Fionda &Moore, 2009) this must be accompanied by a story that gives the items intrinsic as well as extrinsic value (Keller, 2009). Research question: Is it possible to simulate a fashion couture studio environment in a non-traditional public space in order to produce and promote the processes involved in couture designs; each with their own story and aligned to the aesthetic of six collaborating high profile couture fashion retailers? Research contribution: The Couture Academy project allowed the team to curate the story behind the couture design and supply chain process. It was an experimental, curated, ‘hot-house’ fashion design project undertaken in real time to create one-off couture garments, inspired by key seasonal fashion trends as determined by leading Westfield retailers. The project was industry based, with Westfield Chermside as the launch pad for six QUT fashion students to experiment with design nuances aligned to renowned national fashion industry retailers; Cue, Dissh, Kitten D'Amour, Mombasa and Pink Mint. Industry mentors were assigned to each student designer, in order to heighten the design challenge. The exhibition consisted of a pop-up couture workshop based at Westfield Chermside. A complete fashion studio (sewing machines, pattern-cutting tables and mannequins) was set up for a seven day period in the foyer of the shopping centre with the public watching as the design process unfolded in real-time. The final design outcomes were paraded at the Southbank Precinct to a prominent industry and media panel, with the winner receiving a $2000 prize to fund a research trip to an international fashion capital of their choice. Research significance: This curated fashion project was funded by Westfield Group Australia. "It was the most successful season launch Westfield Chermside has ever had from both an average volume for exposure perspective, and in terms of the level of engagement with retailers and shoppers," said Laura Walls, Westfield Public Relations Consultant. Significant media coverage was generated; including three full pages of editorial in Brisbane’s Sunday Mail, with an estimated publicity value of $95,000. And public exposure through the live project/exhibition was estimated at 7,000 people over the 7 days.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This report presents the results of the 2011 Australian road and bridge product innovation survey, the largest survey of its kind ever undertaken. The survey sample was defined as key organisations involved in the Australian road and bridge construction industry. The survey focused on four sectors across the road and bridge product supply chain: suppliers (comprising manufacturers and distributors), consultants (primarily engineering consultant firms), contractors (comprising head and trade contractors and subcontractors) and clients (state government road agencies). The sample comprised the four sectors in Queensland, New South Wales and Victoria.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The detached housing scheme is a unique and exclusive segment of the residential property market in Malaysia. Generally, the product is expensive and for many Malaysians who can afford them, owning a detached house is a once in a lifetime opportunity. In spite of this, most of the owners failed to fully comprehend the specific need of this type of housing scheme, increasing the risk of it being a problematic undertaking. Unlike other types of pre-designed "mass housing" schemes, the detached housing scheme may be built specifically to cater the needs and demands of its owner. Therefore, owner participation during critical development stages is vital to guarantee the success of the development as a whole. In addition, due to its unique design the house would have to individually comply with the requirements and regulations of relevant authorities. Failure by the owner to recognise this will result in delays, penalties, disputes and ultimately cost overruns. These circumstances highlight the need for a research to guide the owner through participation during the critical development stages of a detached house. Therefore, this research aims to develop a guideline to improve owner participation for a successful detached house development in Malaysia. To achieve the aim, questionnaire surveys and semi-structured interviews were employed to collect the detached house owners' and consultants' & contractors' responses through their experiences in developing detached houses in Malaysia. Stratified and random sampling were utilised to gather information from both parties to represent Malaysian detached house participants. The questionnaire responses were analysed through the application of quantitative analysis such as descriptive analysis, factor analysis and structural equation modelling which were substantiated through qualitative analysis procedure such as content analysis. This research had identified that in order to produce a successful outcome detached house owners are required to participate during critical stages of the development. In the planning stage, the owner needs to provide proper specific input to the consultant regarding his/her expectations of the cost for the entire development, its detailed specification and general idea of the internal and external design of the detached house and its compound. In the contracting stage, the owner must make the appropriate choice of selecting the right contractor for the job. This decision may be taken after recommendations from the consultants or from the owner's personal contacts or experiences but it is not recommended for the owner to select a contractor primarily on the basis of the lowest bid. In the completion stage, the owner may need to attend a number of important site meetings to ensure that the progress of the works is according to what had been planned and the completion date is achievable. By having the owners undertake an active role during critical stages of the development, not only the quality and delivery of the development improved but also there is an increase in satisfaction to the owners themselves.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Background There is a vast amount of international literature which, although agreeing on the need for advanced practice nurse roles, simultaneously debates and discusses the difficulties with nomenclature, definition and subsequent implementation of such roles. Due to this ambiguity it is difficult to equally compare evidence in this field across different countries. A context-specific systematic review on the qualitative evidence of the experience of being an advanced practice nurse in Australia has not been undertaken previously, however it is imperative for nursing managers and leaders to understand the complexities of advanced nursing roles in order to effectively utilise and retain these experienced and valuable nurses. With the creation of a national nursing regulating authority in 2010, it is timely to explore in-depth the experience of being an advanced practice nurse from a national perspective. Objective To identify the experience of being an advanced practice nurse working in Australian acute care settings. Inclusion criteria -Types of participants Registered nurses working in advanced practice roles in acute care settings throughout Australia. -Phenomena of interest The experience of being an advanced practice registered nurse working in an Australian acute care setting, as reported by the nurses themselves. -Types of studies Interpretive qualitative studies including designs such as phenomenology, grounded theory and ethnography. -Search strategy A three step search strategy was used to identify published and unpublished studies. The search process was conducted from August to October 2011 and considered published and unpublished studies from 1990 to October 2011. -Methodological quality Studies were appraised for methodological quality by two independent reviewers using the Joanna Briggs Qualitative Assessment and Review Instrument. -Data extraction Data was extracted from the papers included in the review using the standardised Joanna Briggs Institute Qualitative Assessment and Review Instrument data extraction tool. -Data synthesis Research findings were pooled using the Joanna Briggs Institute Qualitative Data and Review Instrument. Results Three published studies and one unpublished dissertation were included in the review. From these four studies, 216 findings were extracted, forming 18 categories which were then analysed to create six synthesised findings. Six meta-syntheses under the headings of expert knowledge, confidence, education, relationships, negative experiences and patient centred experience were formed from the findings. Conclusions The synthesised findings confirm that the experience of advanced practice nurses in Australian acute care settings is complex and greatly influenced personally and professionally by the organisation as well as the unpredictable nature of working with people.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Open Disclosure comprises two main components: Clinician Disclosure (CD), an informal process usually conducted by the treating clinician; and Formal Open Disclosure (FOD), a more structured process led by a senior clinician trained as an Open Disclosure Consultant. Training programs for both CD and FOD incorporate interactive role-play based scenarios called ‘simulations’. This section of the Open Disclosure Training Program Handbook provides guidelines and resources for facilitating the simulation components of both Clinician Disclosure and Open Disclosure Consultant training.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Background Nationally and internationally, advanced practice nurses are working under various titles and in different contexts to address gaps within healthcare systems. Analysis of advanced practice roles in different countries has been undertaken, but due to variations in cultural, geographical and professional factors, it is difficult and perhaps ineffectual to compare roles between countries. Contextual factors may also affect the actual experience of being an advanced practice nurse. A systematic review was therefore undertaken of qualitative evidence on the experience of being an advanced practice nurse in Australia, to provide deeper understanding of the role in the defined context. Methods The review followed the method for qualitative synthesis as per the Joanna Briggs Institute. An extensive search was undertaken of databases and online resources to find published and unpublished studies. Papers from 1990 to October 2011 which met specified inclusion criteria were appraised using the Joanna Briggs Institute Qualitative Assessment and Review Instrument. Results Three published studies and one unpublished dissertation were included in the review. From these studies, 216 findings were extracted and these were formed into 18 categories. Six meta-syntheses grouped under the headings of expert knowledge, confidence, education, relationships, negative experiences and patient-centred experience were created. Organisational factors impact greatly on the experience, professionally and personally. Conclusions Heterogeneity of role titles makes synthesis a difficult process, but contextualising the population provides a pragmatic approach to informing the status of the advanced practice nurse discourse. The review identifies positive and negative experiences of being an advanced practice nurse in Australian acute care settings with overlapping and intertwining findings that reinforce the complexity of the role.