942 resultados para Construction industry -- Management.


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In Australia, collaborative contracts, and in particular, project alliances, have been increasingly used to govern infrastructure projects. These contracts use formal and informal governance mechanisms to manage the delivery of infrastructure projects. Formal mechanisms such as financial risk sharing are specified in the contract, while informal mechanisms such as integrated teams are not. Given that the literature contains a multiplicity of often untestable definitions, this paper reports on a review of the literature to operationalize the concepts of formal and informal governance. This work is the first phase of a study that will examine the optimal balance of formal and informal governance structures. Desk-top review of leading journals in the areas of construction management and business management, as well as recent government documents and industry guidelines, was undertaken to to conceptualise and operationalize formal and informal governance mechanisms. The study primarily draws on transaction-cost economics (e.g. Williamson 1979; Williamson 1991), relational contract theory (Feinman 2000; Macneil 2000) and social psychology theory (e.g. Gulati 1995). Content analysis of the literature was undertaken to identify key governance mechanisms. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. A previous study by the authors identified that formal governance mechanisms can be classified into seven measurable categories: (1) negotiated cost, (2) competitive cost, (3) commercial framework, (4) risk and reward sharing, (5) qualitative performance, (6) collaborative multi-party agreement, and (7) early contractor involvement. Similarly, informal governance mechanisms can be classified into four measureable categories: (1) leadership structure, (2) integrated team, (3) team workshops, and (4) joint management system. This paper explores and further defines the key operational characteristics of each mechanism category, highlighting its impact on value for money in alliance project delivery. The paper’s contribution is that it provides the basis for future research to compare the impact of a range of individual mechanisms within each category, as a means of improving the performance of construction projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The complex supply chain relations of the construction industry, coupled with the substantial amount of information to be shared on a regular basis between the parties involved, make the traditional paper-based data interchange methods inefficient, error prone and expensive. The successful information technology (IT) applications that enable seamless data interchange, such as the Electronic Data Interchange (EDI) systems, have generally failed to be successfully implemented in the construction industry. An alternative emerging technology, Extensible Markup Language (XML), and its applicability to streamline business processes and to improve data interchange methods within the construction industry are analysed, as is the EDI technology to identify the strategic advantages that XML technology provides to overcome the barriers to implementation. In addition, the successful implementation of XML-based automated data interchange platforms for a large organization, and the proposed benefits thereof, are presented as a case study.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction workforce in Hong Kong is experiencing a severe ageing problem and labour shortage. One initiative to enhance the supply of manpower is to assist ethnic minorities joining the industry. It is foreseeable that the percentage of ethnic minorities in the construction workforce will keep increasing. Statistics show that ethnic minorities were nearly 30% more likely to have work-related injuries than local workers in some developed countries. However, official statistics on the safety of ethnic minorities are not available in Hong Kong. A search in newspaper archive revealed that ethnic minorities in the construction industry of Hong Kong are subjected to higher fatality rate than local workers, just as is the case in many developed countries. This reflects that the safety of ethnic minorities has not received the attention it rightly deserves. Safety communication has been one of the key factors leading to accidents. Safety communication barriers of ethnic minorities impede them from receiving safety training and acquiring safety information effectively. Research towards improving the safety communication of ethnic minorities in the construction industry of Hong Kong becomes more urgent. This paper will provides an initial report on a research project which focuses on improving the safety communication of ethnic minorities in the construction industry of Hong Kong. Quantitative and qualitative research methods including Social Network Analysis (SNA) applied in conducting the research are first discussed. Preliminary statistics of construction accidents related to ethnic minorities in Hong Kong are then presented.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Hong Kong construction industry is currently facing ageing problem and labour shortage. There are opportunities for employing ethnic minority construction workers to join this hazardous industry. These ethnic minority workers are prone to accidents due to communication barriers. Safety communication is playing an important role for avoiding the accidents on construction sites. However, the ethnic minority workers are not very fluent in the local language and facing safety communication problems while working with local workers. Social network analysis (SNA), being an effective tool to identify the safety communication flow on the construction site, is used to attain the measures of safety communication like centrality, density and betweenness within the ethnic minorities and local workers, and to generate sociograms that visually represent communication pattern within the effective and ineffective safety networks. The aim of this paper is to present the application of SNA for improving the safety communication of ethnic minorities in the construction industry of Hong Kong. The paper provides the theoretical background of SNA approaches for the data collection and analysis using the software UCINET and NetDraw, to determine the predominant safety communication network structure and pattern of ethnic minorities on site.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

3D printing (3Dp) has long been used in the manufacturing sector as a way to automate, accelerate production and reduce waste materials. It is able to build a wide variety of objects if the necessary specifications are provided to the printer and no problems are presented by the limited range of materials available. With 3Dp becoming cheaper, more reliable and, as a result, more prevalent in the world at large, it may soon make inroads into the construction industry. Little is known however, of 3Dp in current use the construction industry and its potential for the future and this paper seeks to rectify this situation by providing a review of the relevant literature. In doing this, the three main 3Dp methods of contour crafting, concrete printing and D-shape 3Dp are described which, as opposed to the traditional construction method of cutting materials down to size, deliver only what is needed for completion, vastly reducing waste. Also identified is 3Dp’s potential to enable buildings to be constructed many times faster and with significantly reduced labour costs. In addition, it is clear that construction 3Dp can allow the further inclusion of Building Information Modelling into the construction process - streamlining and improving the scheduling requirements of a project. However, current 3Dp processes are known to be costly, unsuited to large-scale products and conventional design approaches, and have a very limited range of materials that can be used. Moreover, the only successful examples of construction in action to date have occurred in controlled laboratory environments and, as real world trials have yet to be completed, it is yet to be seen whether it can be it equally proficient in practical situations. Key Words: 3D Printing; Contour Crafting; Concrete Printing; D-shape; Building Automation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Observing the working procedure of construction workers is an effective means of maintaining the safety performance of a construction project. It is also difficult to achieve due to a high worker-to-safety-officer ratio. There is an imminent need for the development of a tool to assist in the real-time monitoring of workers, in order to reduce the number of construction accidents. The development and application of a real time locating system (RTLS) based on the Chirp Spread Spectrum (CSS) technique is described in this paper for tracking the real-time position of workers on construction sites. Experiments and tests were carried out both on- and off-site to verify the accuracy of static and dynamic targets by the system, indicating an average error of within one metre. Experiments were also carried out to verify the ability of the system to identify workers’ unsafe behaviours. Wireless data transfer was used to simplify the deployment of the system. The system was deployed in a public residential construction project and proved to be quick and simple to use. The cost of the developed system is also reported to be reasonable (around 1800USD) in this study and is much cheaper than the cost of other RTLS. In addition, the CCS technique is shown to provide an economical solution with reasonable accuracy compared with other positioning systems, such as ultra wideband. The study verifies the potential of the CCS technique to provide an effective and economical aid in the improvement of safety management in the construction industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction industry contributes significantly to environmental degradation, and governments in many countries which are endeavouring to address the situation. Malaysia is no exception. This paper examines the path towards green construction project delivery in Malaysia, focusing on current green policies and initiatives by governments. The historical waves in Malaysian approaches to tackling environmental issues are described, starting from the early 20th century, through the 1990s to the present, and the influence of these approaches on construction practices is analysed. Based on the findings of policy review, essential green construction practices aimed at mitigating the adverse effects of construction activities on the environment in Malaysia were identified. This paper paves the way for future studies in construction and sustainability in Malaysia, especially for the Southeast Asian region where sustainability practices are urgently needed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction projects have a negative impact on the environment. As Malaysia is planning more construction projects to cater for its current and future development needs, practitioners are urged to undertake greener approaches to construction. One of the efforts is the introduction of green procurement, which is promoted under the Malaysian Government’s MyHijau initiative. Construction procurement is recognised as a tool to shift the construction business into a greener industry. However, the implementation of green procurement in Malaysia is still in its infancy and faces a number of challenges, such as the lack of knowledge. A significant gap has been found between policy formulation and actual project delivery as there are no practical guidelines for stakeholders to procure environmental-friendly construction projects. To address this problem, the present research (as part of an ongoing PhD project) aims to develop a green procurement framework that guides stakeholders in procuring green projects in Malaysia. This article highlights the concept of green procurement in Malaysia, the work carried out to date to achieve the research objectives and the preliminary framework that has been established. It is hoped that this research will help academics and practitioners to further explore the potential of green procurement to improve sustainability in the current construction industry practices.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

- Purpose The purpose of this paper is to investigate the current skills gap in both generic and skill areas within the construction industry in Queensland, Australia. - Design/methodology/approach An internet-based survey was administered to collect the opinions of construction employees about the workplace-training environment and their perceptions towards training. The survey intended to address the following research questions, specifically in relation to the construction industry. - Findings The survey results reveal that whilst overall participation in workplace training is high, the current workplace training environments do not foster balanced skill development. The study reveals that in the current absence of a formal and well-balanced training mechanism, construction workers generally resort to their own informal self-development initiatives to develop the needed role-specific theoretical knowledge. - Research limitations/implications The findings of the research are based on the data primarily collected in the construction industry in Queensland, Australia. The data are limited to a single Tier 2 construction company. - Practical implications The findings of this study can be utilised to suggest improvements in the current (or develop new) workplace training initiatives. - Social implications The research suggests that workplace training has positive relationship with career growth. The results suggest that in the construction industry, employees are generally well aware of the importance of workplace training in their career development and they largely appreciate training as being a critical factor for developing their capacity to perform their roles successfully, and to maintain their employability. - Originality/value This paper is unique as it investigates the current skills gap in both generic and skill areas within the construction industry in Queensland, Australia. So far no work has been undertaken to identify and discusses the main method of workplace learning within the Tier 2 industry in the context of Queensland Australia.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Three strategically important uses of IT in the construction industry are the storage and management of project documents on webservers (EDM), the electronic handling of orders and invoices between companies (EDI) and the use of 3-D models including non-geometrical attributes for integrated design and construction (BIM). In a broad longitudinal survey study of IT use in the Swedish Construction Industry the extent of use of these techniques was measured in 1998, 2000 and 2007. The results showed that EDM and EDI are currently already well-established techniques whereas BIM, although it promises the biggest potential benefits to the industry, only seems to be at the beginning of adoption. In a follow-up to the quantitative studies, the factors affecting the decisions to implement EDM, EDI and BIM as well as the actual adoption processes, were studied using semi-structured interviews with practitioners. The theoretical basis for the interview studies was informed by theoretical frameworks from IT-adoption theory, where in particular the UTAUT model has provided the main basis for the analyses presented here. The results showed that the decisions to take the above technologies into use are made on three differ- ent levels: the individual level, the organizational level in the form of a company, and the organiza- tional level in the form of a project. The different patterns in adoption can to some part be explained by where the decisions are mainly taken. EDM is driven from the organisation/project level, EDI mainly from the organisation/company level, and BIM is driven by individuals pioneering the technique.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Construction Design and Management (CDM) Regulations (2007) is one of the most important set of health and safety regulations in the construction industry today. The aim of this research is to examine critical success factors for CDM compliance in small to medium size contractors in the UK construction industry. The objectives of the research include the identification of critical barriers in doing so along with the identification of success factors where CDM is incorporated. A mixed method approach is adopted in the identification and categorisation of the various factors encompassing a literature review, interviews and questionnaire survey. The key finding which emerge is the lack of knowledge and understanding with regards the CDM regulations with the recommendation to encourage small and medium contractor compliance through illustrating the benefits attainable. The practicality of the research is evident based on the significant uptake in the CDM by larger contractors, yet the research indicates that further insight and guidance is required to educate and inform those working within small to medium sized contractors in the UK. Where such acknowledgement and compliance is adopted, it is envisaged that this sector will benefit from reduced incidents and accidents, increased productivity while ultimately leading to a safer and more productive industry as a whole.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry is renowned for spending vast sums in the resolution of disputes, but never in the prevention. The purpose of this paper is to analyse the New Engineering Contract (NEC) to determine whether or not adjudication has become misaligned with the contract’s objective of promoting effective management. In doing so, the paper examines dispute review boards in order to ascertain if they could be a viable alternative to adjudication. A sequential mixed methodology is adopted including a detailed literature review, eight semi-structured interviews, culminating in the circulation and analysis of a questionnaire, to record the significance of the factors identified. The research concludes that the majority of individuals agree that dispute review boards would be more aligned with the NEC. The familiarity of members, the potential to curb rogue behaviour of parties and the proactive nature of the board are flagged as positive features, however the cost aspect requires further investigation. The reservations made in the study about adjudication, such as the priority given to speed over accuracy and also the adversarial nature of the process, suggest that a preventative step prior to proceeding to adjudication would coincide more with the three core themes of the NEC Contract and therefore, be a positive addition.