931 resultados para Colby admissions
Resumo:
http://digitalcommons.colby.edu/atlasofmaine2006/1019/thumbnail.jpg
Resumo:
http://digitalcommons.colby.edu/atlasofmaine2006/1021/thumbnail.jpg
Resumo:
http://digitalcommons.colby.edu/atlasofmaine2006/1022/thumbnail.jpg
Resumo:
http://digitalcommons.colby.edu/atlasofmaine2005/1020/thumbnail.jpg
Resumo:
The Colby Green is a campus expansion project which began in October of 2003. The construction would result in three new buildings, additional parking, and an elliptical 75,000-squarefoot green southeast of Mayflower Hill Drive. There were also plans for the construction of three run-off management and sediment ponds below the green, to manage flooding of the green. Three drains in the green transport water to the three retaining ponds which slowly disperse water into the surrounding environment. The ponds were created by constructing earthen dams around the drain outlets. The dams are composed of soil, cobbles, and boulders procured from the surrounding excavation site. Unfortunately, earthen dams are susceptible to many types of erosion which result in their failure. In this case the potential for clay and silt from the underlying Presumpscot Formation to mix with the soil in the earthen dams raised concerns with regards to frost action. In order to monitor the surface displacement of the dams I drove 92 poles into the ground in 8 straight lines across the faces of the dams in the fall of 2005. I returned to the sites during and after the spring thaw of 2006, to check for any signs of movement resulting from frost-heave, surface creep, or any other form of mass wasting. Fortunately, there was no recordable sign of movement in the stakes across any of the retaining ponds. The dams appear to be functioning as designed.
Resumo:
http://digitalcommons.colby.edu/atlasofmaine2005/1026/thumbnail.jpg
Resumo:
http://digitalcommons.colby.edu/atlasofmaine2009/1030/thumbnail.jpg
Resumo:
http://digitalcommons.colby.edu/atlasofmaine2009/1029/thumbnail.jpg
Resumo:
The definitive history of Colby College's first century.
Resumo:
Beloved Colby historian Ernest Cummings Marriner '13 documents Robert E. Lee Strider's nineteen years as president of Colby College. Marriner is also the author of the definitive History of Colby, which covers the period up to the Strider presidency.
Resumo:
This catalog describes paintings by the author, completed as his Senior Scholar Project in art and exhibited in the Colby College Art Museum. Images of the paintings are not available.
Resumo:
This project was designed to demonstrate the visibility of potential future wind turbines built on the Colby campus. We conducted viewshed analyses in ArcGIS on three different potential turbine sites to determine the visibility of the turbines within a 10km radius. We found that the Runnals hill turbine would be visible to the largest area and the largest number of residents.
Resumo:
Outdoor lighting is an essential component for nighttime safety on college campuses. Outdoor lighting on Colby College campus is not uniform, leaving some areas with minimal light. The purpose of this project is to analytically evaluate if and where major walkways on Colby College have inadequate lighting. While we were unable to define inadequate lighting, we found that most paths on campus do appear to be well lit, while in general open spaces on campus have the lowest light levels.