927 resultados para Building Information Model


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Facility management (FM), from a service oriented approach, addresses the functions and requirements of different services such as energy management, space planning and security service. Different service requires different information to meet the needs arising from the service. Object-based Building Information Modelling (BIM) is limited to support FM services; though this technology is able to generate 3D models that semantically represent facility’s information dynamically over the lifecycle of a building. This paper presents a semiotics-inspired framework to extend BIM from a service-oriented perspective. The extended BIM, which specifies FM services and required information, will be able to express building service information in the right format for the right purposes. The service oriented approach concerns pragmatic aspect of building’s information beyond semantic level. The pragmatics defines and provides context for utilisation of building’s information. Semiotics theory adopted in this paper is to address pragmatic issues of utilisation of BIM for FM services.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is an information technology [IT] enabled approach to managing design data in the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry. BIM enables improved interdisciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. Despite the apparent benefits the adoption of BIM in practice has been slow. Workshops with industry focus groups were conducted to identify the industry needs, concerns and expectations from participants who had implemented BIM or were BIM “ready”. Factors inhibiting BIM adoption include lack of training, low business incentives, perception of lack of rewards, technological concerns, industry fragmentation related to uneven ICT adoption practices, contractual matters and resistance to changing current work practice. Successful BIM usage depends on collective adoption of BIM across the different disciplines and support by the client. The relationship of current work practices to future BIM scenarios was identified as an important strategy as the participants believed that BIM cannot be efficiently used with traditional practices and methods. The key to successful implementation is to explore the extent to which current work practices must change. Currently there is a perception that all work practices and processes must adopt and change for effective usage of BIM. It is acknowledged that new roles and responsibilities are emerging and that different parties will lead BIM on different projects. A contingency based approach to the problem of implementation was taken which relies upon integration of BIM project champion, procurement strategy, team capability analysis, commercial software availability/applicability and phase decision making and event analysis. Organizations need to understand: (a) their own work processes and requirements; (b) the range of BIM applications available in the market and their capabilities (c) the potential benefits of different BIM applications and their roles in different phases of the project lifecycle, and (d) collective supply chain adoption capabilities. A framework is proposed to support organizations selection of BIM usage strategies that meet their project requirements. Case studies are being conducted to develop the framework. The results of the preliminary design management case study is presented for contractor led BIM specific to the design and construct procurement strategy.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Dalla raffigurazione artistica fino alla modellazione digitale, passando per il disegno tecnico, la rappresentazione del progetto d’architettura ha conosciuto nel tempo evoluzioni significative che solo di recente hanno raggiunto l’apice nell’utilizzo di modelli cognitivi in grado di collezionare ed organizzare il patrimonio di informazioni che gravitano attorno all’intero processo edilizio. L’impiego sempre più diffuso dello strumento informatico, insieme al coordinamento delle specializzazioni nelle molte discipline coinvolte nel progetto, ha favorito negli ultimi anni l’adozione del Building Information Modeling un processo che permette di rivoluzionare il mondo delle costruzioni, coprendo molteplici aspetti del ciclo di vita per un manufatto edilizio. Questa Tesi intende presentare in maniera specifica le tappe che hanno consentito il formarsi del BIM. La migliore capacità di gestione, un linguaggio comune tra i progettisti, un’ottimizzazione di risorse e costi, unito ad un controllo convincente ed accurato delle fasi di lavoro, sono alcune delle potenzialità non ancora completamente espresse dal Building Information Modeling che è destinato a divenire una consapevolezza strategica nel bagaglio culturale del professionista contemporaneo.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The impact of health promotion programs is related to both program effectiveness and the extent to which the program is implemented among the target population. The purpose of this dissertation was to describe the development and evaluation of a school-based program diffusion intervention designed to increase the rate of dissemination and adoption of the Child and Adolescent Trial for Cardiovascular Health, or CATCH program (recently renamed the Coordinated Approach to Child Health). ^ The first study described the process by which schools across the state of Texas spontaneously began to adopt the CATCH program after it was tested and proven effective in a multi-site randomized efficacy trial. A survey of teachers and administrator representatives of all schools on record that purchased the CATCH program, but were not involved in the efficacy trial, was used to find out who brought CATCH into the schools, how they garnered support for its adoption, why they decided to adopt the program, and what was involved in deciding to adopt. ^ The second study described how the Intervention Mapping framework guided the planning, development and implementation of a program for the diffusion of CATCH. An iterative process was used to integrate theory, literature, the experience of project staff and data from the target population into a meaningful set of program determinants and performance objectives. Proximal program objectives were specified and translated into both media and interpersonal communication strategies for program diffusion. ^ The third study assessed the effectiveness of the diffusion program in a case-comparison design. Three of the twenty Education Service Center regions in Texas were chosen, selected based on similar demographic criteria, and were followed for adoption of the CATCH curriculum. One of these regions received the full media and interpersonal channel intervention; a second received a reduced media-only intervention, and a third received no intervention. Results suggested the use of the interpersonal channels with media follow-up is an effective means to facilitate program dissemination and adoption. The media-alone condition was not effective in facilitating program adoption. ^

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The simulation of design basis accidents in a containment building is usually conducted with a lumped parameter model. The codes normally used by Westinghouse Electric Company (WEC) for that license analysis are WGOTHIC or COCO, which are suitable to provide an adequate estimation of the overall peak temperature and pressure of the containment. However, for the detailed study of the thermal-hydraulic behavior in every room and compartment of the containment building, it could be more convenient to model the containment with a more detailed 3D representation of the geometry of the whole building. The main objective of this project is to obtain a standard PWR Westinghouse as well as an AP1000® containment model for a CFD code to analyze the thermal-hydraulic detailed behavior during a design basis accident. In this paper the development and testing of both containment models is presented.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

L’obiettivo della tesi è quello di fare una panoramica sulla strategia BIM e quindi sulla digitalizzazione del processo costruttivo. Grazie alla analisi di un caso di studio, altro obiettivo è quello di analizzare e valutare la metodologia BIM 4D/5D, ossia la gestione dei tempi e dei costi di realizzazione dell’opera. Nella prima fase si affronta il tema del BIM, con una analisi sull’evoluzione degli strumenti di elaborazione e rappresentazione digitale del progetto architettonico, su come questi strumenti si differenzino sia dal punto di vista operativo che concettuale rivoluzionando il flusso di lavoro odierno. Quindi, partendo da un’analisi che e ritrae l’estrema frammentazione del settore delle costruzioni, si va ad analizzare come il BIM aumenti e favorisca la collaborazione delle parti interessate, armonizzando l’intero processo costruttivo dell’opera. Si prosegue con l'esame della diffusione e del livello di maturità degli strumenti BIM, di come i privati e le amministrazioni pubbliche, a livello mondiale, stiano spingendo per favorire l’adozione della metodologia BIM. Inoltre si analizzano le dinamiche dell’interoperabilità, delle metodologie e protocolli di interscambio dati, che sono un elemento chiave per il successo del BIM per via dei numerosi strumenti, specializzati nelle varie discipline del settore edile. Nella terza parte, dedicata al Project Management di un caso di studio, si verifica la bontà delle metodologie teorizzate attraverso la realizzazione di un modello virtuale in Revit. Dal modello realizzato dal laureando sono estrapolate le informazioni necessarie alla gestione, e tramite il software STRVison CPM, si elaborano i principali documenti per la progettazione e gestione del cantiere: il CM, il CME, i tempi operativi, il cronoprogramma Gantt. Obbiettivo è constatare l’effettivo livello di maturità della strategia BIM 4D e 5D e la reale possibilità di un impiego capillare nel panorama italiano del settore delle costruzioni.