931 resultados para Board tray
Resumo:
Personal and Public Involvement (PPI) is about involving those who use Health and Social Care (HSC) services, or care for those who use services, with those who plan and deliver services. This involvement can sometimes relate to individuals (personal), or groups, or the wider community (public).This Strategy shows the direction that both the PHA and the HSCB are committed to, in their development of PPI.
Resumo:
This is the Terms of Reference for the Project Board of the review of Allied Health Professions (AHP) support for children/young people with statements of special educational needs.It outlines the:Purpose of the Project BoardResponsibilities of the Project BoardMembership of the Project Board
Joint Commissioning Plan of the Health and Social Care Board and the Public Health Agency: 2010-2011
Resumo:
Legislation enacted on 1 April 2009 created a new Commissioning system with the establishment of a region-wide Health and Social Care Board, including 5 Local Commissioning Groups (LCGs), and a Public Health Agency. In line with Departmental direction and guidance the objectives of the new commissioning arrangementswere to:- Approach the future delivery of Health and Social Care from a region-wide perspective focused on outcomes.- Ensure local sensitivity through the creation of five Local Commissioning Groups reflective of their areas.
Resumo:
The Mechatronics Research Centre (MRC) owns a small scale robot manipulator called aMini-Mover 5. This robot arm is a microprocessor-controlled, six-jointed mechanical armdesigned to provide an unusual combination of dexterity and low cost.The Mini-Mover-5 is operated by a number of stepper motors and is controlled by a PCparallel port via a discrete logic board. The manipulator also has an impoverished array ofsensors.This project requires that a new control board and suitable software be designed to allow themanipulator to be controlled from a PC. The control board will also provide a mechanism forthe values measured using some sensors to be returned to the PC.On this project I will consider: stepper motor control requirements, sensor technologies,power requirements, USB protocols, USB hardware and software development and controlrequirements (e.g. sample rates).In this report we will have a look at robots history and background, as well as we willconcentrate how stepper motors and parallel port work
Resumo:
Annual Report, Agency Performance Plan
Resumo:
Agency Performance Plan
Resumo:
Annual Report, Agency Performance Plan
Resumo:
Annual Report, Agency Performance Plan
Resumo:
Annual report for the Iowa Utilities Board
Resumo:
Annual report for the Board of Nursing.
Resumo:
Report for the Iowa Utilities Board
Resumo:
Annual Report for Board of Nursing
Resumo:
Annual report for Iowa Utilities Board
Resumo:
Annual report for Iowa Utilities Board